Drill Plan

By choosing to drill the East side of Paramount, Teck has moved away from the recommendations in the Feasibility. The FS suggested drilling be concentrated on the Inferred resource that lies within the pit shell to move it up to Measured or Indicated. When Elmer was talking about having to drill this year he always said that it wouldn't take much drilling, maybe 10 holes, to do this work and it would be a priority.

So Teck has their own game plan.

I think they are doing this because they believe, as we all do, that the east side is mineralized but they need the drill results so that they can get a new mine plan produced. I think they are further ahead in their planning than we are and are ready to get a mine plan and move forward fast.

Remember this mistake from Moose Mountain? You never know...it could have been Teck looking at a different strategy than Elmer was, but Elmer didn't have the drill results to prove it up.

Galore Creek Copper Fox Metals In Progress NW BC Gold, Copper FS 2012

SchaftCreek

Copper Fox Metals Inc. In Progress NW BC Gold, Silver, Copper TR - PEA, TR - PFS, TR-FS Support, TR-FS update

2010-2012

The second $60 million that they are to commit to pre-production doesn't have to actually be spent entirely. They might just get to the Production decision faster than they can spend the money.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. True but let us remember the MIRA Re-Interpretation (only Teck got to see lol)

    http://www.copperfoxmetals.com/s/NewsReleases.asp?ReportID=549367&_Title=Copper-Fox-Reports-the-Status-of-the-Schaft-Creek-Feasibility-Study-and-Pro...

    The results of work by Mira Geosciences have fine tuned the previous interpretations of the Titan-24 data. Their interpretation continues to report a strong correlation of the mineralization in the Schaft Creek deposit and to the mineralization in the Discovery zone located approximately 2 kilometres north of the Schaft Creek deposit. The chargeability signature that extends from the north end of the Paramount zone for a distance of approximately 3.5 kilometres to the northwest could have impact on the exploration potential of the Schaft Creek project. The extension of the strong chargeability signature associated with the Paramount zone represents a priority drill target and has the potential of extending the mineralization in the Paramount zone an additional 500m to the east under Mount LaCasse.

    1. I just find it interesting that our top priority for drilling was to try and move the Inferred and waste rock into a mineralized category and that wasn't apparently going to take much money or many drills. The end goal of this drilling would have been to improve our FS economics.

      Now Teck has gone off to drill fresh ground. I am just speculating that they are maybe working on their own mine plan. It leads me to believe that they have a different idea of how this mine would be worked. They probably already have a reasonable idea that the inferred is not waste rock, but they would have to design a whole new pit plan if the east side was also mineralized, wouldn't they?

      Also they are doing some geotechnical drilling for pit stabilization, which also points to a different pit plan. Well, maybe not, but it could mean a different pit plan.

      1. Why would they work on thier own mine plan? Wouldn't it be 10x easier to take Elmer's recommendations and go forward? Surely after backing in for 75%, you'd think they have to fully trust what he is telling them.

        Go EAST boys, go EAST!

      2. I am just speculating that they are maybe working on their own mine plan.

        And I agree with you. This is why 150,000 tpd (for the EAA) is to small and why CUU never submitted it.

        Teck will test the East like Mira suggested and this mine will be 180,000-220,000 tpd an dchnage the economics...(a good thing)

        The production decision will come fast once results are received, and we should be gone.

        1. This is why 150,000 tpd (for the EAA) is to small and why CUU never submitted it.

          I was wondering about this. If they do a new mine plan, would they need to update the FS before submitting the EAA?

          I think they've been running their own FS all along anyway so it would be close to being ready but they need to incorporate East Paramount and a new mine plan.

          This drilling is referred to as Phase 1. I wonder what Phase 2 is?

          1. I was wondering about this. If they do a new mine plan, would they need to update the FS before submitting the EAA?

            During the call Elmer moved away from any new FS required, and said only a new mine plan and new numbers for economics would be required. If the project was to be vastly expanded the EAA would normally require further submissions for this. However, the current EAA will be completed by Teck based on their current plan... which could change rapidly based on new drilling.

        1. From what I can read the Feasibility doesn't recommend 10,000 meters of drilling in Phase 1 or in Phase 1 & 2 combined. The presentation is emphasizing moving the waste into measured. Elmer said something about how that would be done as part of the work Teck was about to do. They did say that Teck was going East to test the anomaly, whereas the FS seems to be emphasizing the West and North of Paramount. I guess we have to wait for a more detailed description of the work that is intended. The FS also recommended another Titan survey "eastwards towards Mount LaCasse."

          The Presentation suggests:

          -Undertake a diamond drilling program to determine the extent to which the

          171.16 million tonnes of Inferred Resource within the pit shell can be upgraded

          to a Measured or Indicated Resource.

          -Drill east of current Resource Block Model to test area treated as waste in

          the Feasibility Study.

          The Feasibility study says:

          Phase I is designed to focus on exploring and delineating the new mineralized zones

          and chargeability anomalies identified in the Quantec Titan and High Resolution

          Magnetic surveys, and to infill drill part of the northern portion of the Paramount Zone

          in order to upgrade the resource category from inferred to indicated. Phase I will

          entail a combination of diamond drilling and geophysical surveying.

          1. "The Presentation suggests:

            -Undertake a diamond drilling program to determine the extent to which the

            171.16 million tonnes of Inferred Resource within the pit shell can be upgraded

            to a Measured or Indicated Resource.

            -Drill east of current Resource Block Model to test area treated as waste in

            the Feasibility Study."

            The 171 million tonnes of inferred Resource is within the pit shell.

            East of the Resource Block Model means it's outside of the Block model and outside of the pit shell.

            1. Replying to @Riskkee

              ..."East of the Resource Block Model means it's outside of the Block model and outside of the pit shell."

              Actually the pit shell goes well to the east of the current block model. In order to mine the stuff in the block model, the pit slope has to angle back for stability. A lot of the stuff inside the pit wall and into the block model is the 171Mt of inferred.

              The presentation states just that: "Drill east of current Resource Block Model to test area treated as waste in the Feasibility Study."

              I posted some of the old drills in this area east of Paramount. They are few, far between, highly variable and drilled to very different depths. This kind of drill pattern tells me that there isn't enough consistent, statistically relevant data to deam it anthing higher than inferred (if even that). As we know the inferred cant be modeled into the FS. Because this stuff has to be excavated in order to reach the Proven & Probable areas of the block model it counts as waste.

              Most of the 171Mt of inferred is in the Liard/Main zone as someone just mentioned earlier. As I posted a long time ago, 171Mt of rock is a huge volume and could fill BC Place stadium something like 24 times IIRC.

          2. "From what I can read the Feasibility doesn't recommend 10,000 meters of drilling in Phase 1 or in Phase 1 & 2 combined. The presentation is emphasizing moving the waste into measured. Elmer said something about how that would be done as part of the work Teck was about to do. They did say that Teck was going East to test the anomaly, whereas the FS seems to be emphasizing the West and North of Paramount. I guess we have to wait for a more detailed description of the work that is intended. The FS also recommended another Titan survey "eastwards towards Mount LaCasse."

            The caller asked Elmer if the 171 million tonnes was going to be drilled and Elmer said "part of the drilling program was to test the mineralization in the eastern extension of the Paramount zone and if it was mineralized for several hundred metres then we would convert some waste to mineralization"

            Kind of sounds like Elmer gave away part 2 of the drilling program.

            The majority of the 171 milion tonnes is in the Main/Liard zone.

              1. Replying to @chisel26

                Copper Fox has no claims in their name. All the claims in BC have been transferred to Teck and we own them all 25%. There is a claims map attached to the new Agreement on Sedar that shows all the claims that are jointly owned by Copper Fox and Teck. The map also shows the 5km zone within which either Teck or Copper Fox are obliged to share claims if they buy them in the future.

        2. "Drilling east of the Paramount zone is Elmer's 2013 drill plan shown in the CUU presentation Pg 16. " The 2013 drill plan is Tecks , they own the lands and are in charge and paying for it. At this point Copper Fox is along for the ride. The Cuu presentation is just showing what the JV is doing and we have a 25% vote on the work that gets done. IMHO
      3. Now Teck has gone off to drill fresh ground. I am just speculating that they are maybe working on their own mine plan. It leads me to believe that they have a different idea of how this mine would be worked.

        I think you hit the nail right on the head. If they can find more mineralization on the East side and better grades that will undoubtedly change the mine plan. IMO, with the size of this whole area Teck may be even contemplating a larger pit plan with much larger daily throughput to improve the economics. Just look at Cobre Panama. FS numbers are way better with a 220t/day operation. Economies of scale will work in our favour to reduce payback time, drastically improve IRR, cash flow and profitability.