We've all heard a lot about the potential to find additional mineralization east under Mt Lacasse. What I didn't realize is that it appears that a lot of this potential mineralization is within our current pit limits. That means our feasibility counted it as waste but it will likely be valuable rock. This is different than the "waste" rock that came from the inferred resource (see our presentation, it shows where the inferred is). This could be HUGE for our economics. For scale, I've created a quick image which shows how much "waste" rock is being moved that could be mineralized. The black line shows the shape of our open pit. The dark blue shows how much undrilled area has to be moved as waste. This area is almost 300m thick at points. If this year's drilling program can prove up that mineralization then we are in very good shape.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Just to further show my point, see the image below. The entire area in purple must be mined but has not even been drilled beyond the near surface (drill holes 397 and 400 failed). That means it's being treated as waste but in reality could be mineralized due to the chargeability in that area. Someone please correct me if I'm wrong, but it appears that a huge amount of material in our pit was never even drilled. Huge fail on Copper Fox's part but also a huge opportunity for improvement.

    1. http://www.corebox.net/properties/schaft_creek/liardmain

      Slide the control to .2% nothing came up in the historicals. Teck will have to drill to 400 M just to test it. H77CH104 was about the only good grade they hit. 07CF316 demonstrated some mineralization but sporatic. We know more about the terrain now.

      They want to optimize the east wall to get the max depth. I don't expect wild cat drilling.

      Diamond drilling data indicates that the Liard Main Zone at the Schaft Creek property in northwestern BC is larger than previously thought. During 2007 Copper Fox drilled 42 holes for a total of 6,274 metres. Five of these holes tested the deposit's depth extension to the northeast; results from these holes supported the indications from geophysical data of increased mineral potential to the east and northeast of the existing outline of the Main/Liard Zone. Of particular note were the results from DDH 07CF313, drilled onto an area between the Paramount and Liard Main Zones west of Mount LaCasse.

      DDH 07CF313 returned:

      From

      To

      Interval

      Copper

      Molybdenum

      Gold

      Silver

      62.80 m

      110 m

      47.2 m

      0.506%

      0.016%

      0.241 g/t

      0.3 g/t

    2. "Just to further show my point, see the image below. The entire area in purple must be mined but has not even been drilled beyond the near surface (drill holes 397 and 400 failed). That means it's being treated as waste but in reality could be mineralized due to the chargeability in that area. Someone please correct me if I'm wrong, but it appears that a huge amount of material in our pit was never even drilled. Huge fail on Copper Fox's part but also a huge opportunity for improvement."

      The area in purple is not part of the feasibility study which means it's not treated as waste.

      The ONLY waste rock mentioned in the feasibility study is shown in the area in blue.


      1. OK there is definately some confusion being generated by these 2 posts. To clarify, the waste rock that was talked about in thge FS as revenue generating potentially ,but was being treated as waste due to inferred categorization, is within the known block model scattered throughout as inferred (blue).

        What RT is getting to is that the North East pit wall, which has large amounts of material that have to be cleared (waste rock) to keep the slope manageable and safe, is overlying the north east chargeability which has not yet been drilled and likely is mineralized. This is indeedthe case however more likely to be mineralized at depth. If Teck is to maximize their ability to get to the high grade material at depth, beyond the pit shell of the FS, and possibly the North East mineralized material within the coinciding chargeability, then they will indeed have to rework that massive end of the pit and take out more if not the entire face of the mountain (you have to move out to move down in this scenario.

        1. "OK there is definately some confusion being generated by these 2 posts. To clarify, the waste rock that was talked about in thge FS as revenue generating potentially ,but was being treated as waste due to inferred categorization, is within the known block model scattered throughout as inferred (blue)."

          I agree with you, RT just posted his 2nd confusing post.

      2. That's what I thought at first as well. After a closer look, the area in purple is definitely part of the feasibility study. See the image below. That huge pit wall must be mined but has not been drilled very well. There are a few shallow drill holes (200m) but none that reached into the chargeability. Perhaps Chappy can provide some more info on the historical drill holes.

        It appears there are 2 types of waste rock that can be upgraded: the 171M tonnes of inferred and the undrilled chargeability. Notice in the presentation, Elmer lists "Upgrade the 171M tonnes of inferred" and "Drill east of current Resource Block Model to test area treated as waste in the Feasibility Study" as separate items.