Skip to content
Sign in

Post

Copper Fox Metals Inc.

VEEP3.0 rating from 57 members3K ptsRate

Bloomberg copper supply article

I found this article on Kitco, I wonder if these kind of projections will play into Teck's production decision? It seems like they would affect the price they are willing to pay for our 25% portion of the mine.

On the positive side of the copper inventories is that copper inventories have been declining quite a bit - over 25% on the LME. It shows that it doesn't take a lot to reduce the inventories quite a bit.

Just wondering what others think.

http://www.bloomberg.com/news/2013-10-13/copper-supply-glut-seen-tripling-as-prices-sink-10-commodities.html

The worldwide glut of copper supply is poised to almost triple in 2014, driving prices to the lowest in at least three years at a time when the International Monetary Fund says economic growth will be weaker than forecast.

The surplus will reach a 13-year high of 272,000 metric tons, according to data from Barclays Plc and the International Copper Study Group in Lisbon. Codelco and Freeport-McMoRan (FCX) Copper & Gold Inc., the biggest producers, are among those scheduled to add supply next year. The metal will drop as low as $6,450 a ton in 2014, or 10 percent less than last week’s close, the median of 22 analyst estimates compiled by Bloomberg shows.

New mines or expansions to existing pits from Mongolia to Indonesia to Chile will boost output as producers respond to prices that more than tripled in the past decade. Shortages occurred in seven of the past 10 years as the Chinese economy expanded almost sixfold. Mining companies are finally catching up just as growth in China, the world’s second-largest economy and consumer of two in every five tons, is projected to be the lowest in almost a quarter century.

“We’ve got enough of a surplus to keep prices under pressure,” said Robin Bhar, an analyst at Societe Generale SA in London who has covered metals for about 25 years. “You’re going to have to see demand really surprise, which I don’t see given the economic environment, to knock those expectations seriously off course

Copper fell 8.7 percent to $7,243.25 on the London Metal Exchange this year, tumbling into a bear market in April. The LMEX index of six industrial metals dropped 9.3 percent because of surpluses in aluminum and nickel. The Standard & Poor’s GSCI gauge of 24 commodities declined 1.7 percent, the MSCI All-Country World Index of equities gained 14 percent and the Bloomberg U.S. Treasury Bond Index lost 2.6 percent.

Production will jump 5.1 percent this year and 4.9 percent in 2014, twice the pace in 2012, according to London-based Barclays. Growth in demand will slow to 4.1 percent, from 4.8 percent in 2013, expanding the surplus from 94,000 tons. Stockpiles in warehouses monitored by bourses in London, New York and Shanghai reached 934,654 tons in June, the most since 2003, according to data compiled by Bloomberg.

Barclays’s prediction for a bigger copper surplus in 2014 contrasts with its forecasts for smaller gluts in aluminum, nickel and zinc. Lead shortages will worsen and the deficit in tin will be little changed, the bank says.

Costliest Mines

Copper producers may not need to curb output any time soon because the costliest mines need about $6,600 to break even, or almost 9 percent below prices now, according to data compiled by Macquarie Group Ltd.

Orders to withdraw copper from LME-tracked warehouses, known as canceled warrants, rose fivefold this year, indicating demand may be stronger than estimated. The orders reached a record 375,425 tons in June and were last at 258,275 tons, still seven times the average over the past decade, bourse data show.

Supply regularly gets disrupted by everything from strikes to landslides. Freeport-McMoRan, based in Phoenix, lost about 125 million pounds (56,700 tons) of output in the second quarter after halting work at its Grasberg mine in Indonesia because of a tunnel collapse May 14. Rio Tinto Group’s $6.6 billion Oyu Tolgoi project in Mongolia was delayed because of disagreements with the government on funding.

“I’ve been to Asia recently and I see solid demand,” Javier Targhetta, the senior vice president of marketing and sales at Freeport-McMoRan said in an interview in London on Oct. 8. “I’ve seen a very solid market in China. The recovery of the U.S. is a fact. There are promising signs in Europe.”

Manufacturing Index

A Chinese manufacturing index compiled by HSBC Holdings Plc and Markit Economics reached a six-month high in September. The government’s broadest measure of credit rose more than forecast in August, signaling that a rebound is strengthening.

Faster economic growth may not be enough to spur an acceleration in the country’s refined copper imports, which rose 4.8 percent from a year earlier in August, according to customs data. Unwrought imports climbed 16 percent from a year earlier in September, reaching an 18-month high. Stockpiles held in China’s bonded warehouses, separate to those tracked by the Shanghai Futures Exchange, climbed 50,000 tons to 450,000 tons in August, Maike Futures Brokerage Co. says.

That’s more than the 31,500 tons withdrawn from bourse-monitored depots in the past three months. Premiums that buyers pay on top of the exchange price to secure immediate supply fell in September, an indication more metal was available, according to Standard Chartered Plc.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. If Schaft Creek were slated to go into production in 2014, then it might be a factor. But by 2020 and beyond the bigger picture will surely look a lot different.

    Teck will be playing the long game. Ernesto hopefully won't be giving this prize away for cheap.

    1. If anyone is going to the AGM

      I have a question if someone would please ask Elmer.

      What is "Plan B"?

      and is it in place now?

      1. Teck backed in so I'm pretty sure we are in plan A ... but plan A also involves a lot more waiting. I think everyone should wrap their head around the fact that CF is on Elmer's back burner right now. We can only wait for things to play out as they play out and it seems we do not control much of the agenda. focus is on AZ and elsewhere but not much in CF imo .

        1. I have seen many ask If anyone was attending the agm, but have not seen anyone state they were going. All these questions and no one to ask. I'm from Toronto area and would not be able to attend, but I'm sure we have a Couple people from Calgary here. Could any one reply that they are going? It would be nice to at least hear an audio recording of the Q&A portion.

    2. Ernesto probably would of already. Mike told me a few weeks ago that Ernesto was very happy with the deal and doesnt mind waiting until the economic picture becomes better. luckily his wealth lets him make rational decisions...

        1. teck wouldnt want to sit 6 years especially since starting this coming spring we get clean power.... try thinking outside of the box a bit... Teck is also in need of more production do to their short comings with other projects...

        2. If Ernesto is happy... in that case we can wait here for another 6 years?

          To answer this question. Stand in Teck's shoes right now:

          - You are currently drilling on your own tab,

          - You want to maintain your credit rating, and keep a healthy balance sheet.

          - The EA should to be submitted soon (or later if completely revised based on current drilling)

          - The NTL will be complete in 2014 (the schaft creek extension: when required),

          - Teck almost certainly will go ahead with production... sooner or later.

          - Teck has a parasite Jr. attached to your 25% that goes along for the ride with effectively no additional commitments

          - Teck should know the price Ernesto wants. As CG suggested, this could be closely related to the current drilling strategy. If the mine size can be expanded considerably, then Teck makes the offer Ernesto is asking for.

          - However, the better the drill results, the more Ernesto could be asking for.

          If you were Teck, what would you do? How long would you wait to make a decent offer to CUU so that you could choose your own MAJOR partner to commit funds towards the project?

          1. i would finish the drilling season (phase one, 10.000m) and see what can I get out from the rest of the area (make an offer for 25%). One question. Can't TECK anyway choose partner inside 75% to commit founds (I missed that info)? I believe that it's not a good scenario but anyway... I'm just wondering if major like TECK can/would drag the whole thing until the copper prices are up (if the Bloomberg price prediction for 2014 is right).