Re: Re phase2
I have a hard time imagining what Teck is drilling for $15 million if it is not Phase 2. According to the FS the whole of the Phase 1 budget was $2.129 million. That included 8 drill holes and a Titan survey. Phase 2 budget was supposed to be $1.391 million for 10 drillholes to follow-up from Phase 1.
Even together this doesn't come close to $15 million. Maybe that includes the survey Teck did between SC and GC, which has nothing to do with us, but there is still a lot of money unaccounted for. Hopefully, they are also improving recoveries because that would add a lot of value to the end results.