Skip to content
Sign in

Post

Copper Fox Metals Inc.

Mail Room2.1 rating from 20 members30 ptsRate

Teck Clock

The black out period for Copper Fox last very long (6 Months) to make a JV with Teck. In my eyes to long only to make a JV out of it.....

My feeling is that Teck make an offer to EE behind closed doors. As it seems it was to low for EE to make a deal with Teck. Now Teck let the clock ticking and this clock goes very slow. I don't think that Teck is highly interested in bringing more value to SC, why? To make it more attractive and even more expensive? Maybe they wait for EE to make a Step in Tecks direction?

Hope this come to a good end shortly or may we say "soon" ;-).

GLTA...Waterjoe

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. please explain why they undertook a drill program almost immediately after backing in for 75% then.

    what clock are you looking at? your short position one?

    1. Nothing to do with short position, its only my opinion here. I'm a long shareholder and holding until the end ;-). Its only my point of view, nothing more.

      GLTA...Waterjoe

      1. Christmas is a comin' ...in just over 4 weeks....(other than me), anyone else think it's poss. we might get a gift of Drill results before the big guy in the red suit shows up?

        :)

        sb

        1. Sydneyb,

          I am expecting drill results to be announced before year's end. The 2013 drill program concluded a week before October end, with today's date being November 22 it has been a month since the wrap up of camp closure.

          IMO, the drill results should be in by year-end. I am hoping the assays are released in the next couple of weeks. Let's see what transpires in the coming weeks.

          Other reasons why I am expecting results:

          1) "We will take some time to review the results and it will be shared with CF in due course" (Greg Waller on November 15th). This does not sound like a 2014 release (of drill results in the new year). IMO, the way he worded his statement sounds like drill results could be in hand.

          2) work plan for 2014 under review (taken from Teck slides). This is speculation on my part but can someone explain to me how management can plan for future initiatives without knowing current results of the Schaft Creek deposit for advancement into 2014? How can Teck proceed with a review of 2014 plans without understanding current assays, drill core data, and geo-technical results?

          3) Teck needs to share the drill results in a timely manner to Copper Fox as the new contract of the joint venture stipulates. At the moment Teck is discussing the Budget process for 2014 and proposal of new work plans. This is fact. Watch Dale's investor day video presentation and review Teck Copper slides.

          1. well said & exampled with factual statements ym!

            i have also heard that 4-5 weeks is normal for a lab to provide drill results... if not backed up with work - so don't think d.r. release in the 2nd week of Dec. is even out of the question (imo.)

            sb

          2. I agree in part of what your saying YM

            The only thing I dissagree with is getting the core sample NR by this years end.

            I think we will get them in the new year.

            Teck needs time to review them, to make sure that there guys who did the sampling made sure of the results. If im not mistaking...Teck`s own guys did the sampling.

            Keep in mind....we only need 1 drill sample to show the same minerialization as we got now....and Teck would know that we have a "DISTRICT"

            1 core sample to extend the east wall of the mining pit and expand the open pit and then Teck can mine deeper to get to the better grades of copper and extend the mining life of Shaft Creek...who knows could extend it by anouther 20 years. Now what happens if all the drill samples that were drilled looked good?

            Thats the problem CUU had, we had a hard time finding drilling with no minerialization.

            Im sure that there was some difficulty possibliy 1 or 2 holes might have even been abandond because of the rough terrain that Shaft Creek has to offer...after all we have a hole that we scrubed because we couldnt drill it.

            For this I think Teck will go over these drill samples with a fine toothed comb....I think these drill samples to date will be the most important results that we have to look forward to in the value of Shaft Creek.

            1. Replying to @Dogger 12

              1 core sample to extend the east wall of the mining pit and expand the open pit and then Teck can mine deeper to get to the better grades of copper and extend the mining life of Shaft Creek...who knows could extend it by anouther 20 years. Now what happens if all the drill samples that were drilled looked good?

              I agree. One drill and we will know who much further we can extend the pit and if we are able to change the slope and mine out the high grades sooner.

              Also, apparently there is a drill that's being drilled at paramount zone is partially linked to the mike zone. So there is a slight possibility that the Paramount zone mineralization can be extended to the Mike Zone.