money back

I did not invest just to get the exploration money back. At this point and time I would like to get the money back that I had invested in, due to the fact that I am around 80% down in value.

I really invested in the agreement between Copper Fox and Teck. I figured it was a win win. As long as the FS or BFS was "positive" which it was. Now the agreement has changed.

I am in agreement with Canada Grant.

The worst of it is....getting a good answer from managment on all of these decisions....like bringing drills back and forth, changing the agreement.

I know we have rehashed this and Elmer said it was a "Possible" court case or arguement "Might' not hold up in court, so we had to change the JV agreement which is now better?

Frankly, I dont buy it, and now it is a good "Possibility" that we might be here for a lot longer than we think we might be. I dont see Teck jumping on this anytime soon. Heck they just spent a bunch on money and another company buying shares ....AGM or something like that?

At least with the old agreement, we only would have to wait 4 years. So I guess I agree with Canada Grant.....or if we just got into this to get our original money back....then give me my "Original" investment back and we'll call it a day. But I know that won't happen.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. I did not invest just to get the exploration money back. At this point and time I would like to get the money back that I had invested in, due to the fact that I am around 80% down in value.

    I really invested in the agreement between Copper Fox and Teck. I figured it was a win win. As long as the FS or BFS was "positive" which it was. Now the agreement has changed.

    I am in agreement with Canada Grant.

    The worst of it is....getting a good answer from managment on all of these decisions....like bringing drills back and forth, changing the agreement.

    I know we have rehashed this and Elmer said it was a "Possible" court case or arguement "Might' not hold up in court, so we had to change the JV agreement which is now better?

    Frankly, I dont buy it, and now it is a good "Possibility" that we might be here for a lot longer than we think we might be. I dont see Teck jumping on this anytime soon. Heck they just spent a bunch on money and another company buying shares ....AGM or something like that?

    At least with the old agreement, we only would have to wait 4 years. So I guess I agree with Canada Grant.....or if we just got into this to get our original money back....then give me my "Original" investment back and we'll call it a day. But I know that won't happen.

    Teck spent $1.5 million in AQM. How is that bunch of money? Way to go and tie the whole MS comment with CanadaGrant. And make comments like this.

    Frankly, I dont buy it, and now it is a good "Possibility" that we might be here for a lot longer than we think we might be. I dont see Teck jumping on this anytime soon. Heck they just spent a bunch on money and another company buying shares ....AGM or something like that?

    Based on what you don't see Teck jumping on this anytime soon? How long do you think?
    I am in agreement with YN.
    1. I don`t need to tie anything in with Canada Grant. I happen to just agree with him just like I stated.

      I guess if you think that 1.5 million is not much money. Teck investing it in a company to buy shares that they have no control over. This past year donating millions of dollars to charity etc...not much money. Thats fine, we all have our own opinions. No harm in that.

      But when I look at Teck spending all this money, yet trying to cut spending and a possible 600 job cut from Teck, hummm

      Then Teck only spent a small amount of money on Shaft Creek this year. Tells me that they are not in a hurry with us.

      So if this is the case? Then would the old contract or JV agreement that I and others invested in .....would that not have been better? Taken the chance of battling over the agreement which I might add.....was the agreement that Teck put in place.

      Getting the Laird shares back and not have someone hold on to them....reguardless of supposedly tax purposes. Really you think we are in the best place we are now?

      Teck would have been on a timeline with the old agreement. Im sure our SP would not be where it is.

      Everytime I phone the office and spoke with Elmer before and after we dropped the BFS, Elmer has told me many times.....Teck could jump on this at anytime.

      All I know ... the original agreement....Teck had 4 years to jump (period).....now ....the new agreement, they bought themselves years and years if need be, to invest in other companies and possibly jump on some other new possible mine up and comming. So now we sit and wait.

      1. Evening Dogger, My opinion is that Teck would not abide by the agreement that they originally drew up and told CUU to either take it or leave it. CUU had no choice. It would be nice though if CUU management would give us a realistic update once in a while instead of telling us stories about weather then changing it to fog..... Can't drill a hole in the fog!

        1. Wow! Is that all the psychoanalysis we can come up with on this subject guys? ...........have a great weekend
          1. Well, Ok TB, I have some straight info without any psychoanalysis.

            1. Management told us multiple times that the BFS would be out and it didn't happen.

            2. Management had some BS study by BMO stating negative copper prices on their official website right up to the time they actually produced a BFS which showed a copper cost of $1.15 per lb.

            3. Management told us of the successful drilling results in a news release when over 50% of the announced and planned drilling didn't even take place...

            4. Management then told us the drilling was halted due to bad weather but when that was prroved wrong by multiple people it changed to fog. Drillers can't work in fog.... Right...

            I'm kind of wondering just how stupid someone is to try and use this crap on shareholders? That person is not my idea of something I would invest in but I did make the mistake so what the heck. I was also told in person that the BFS would be out in that same quarter (Jan 22nd, 2012) but it didn't come out for almost a year. How can you be weeks away from your self imposed deadline and not know you are a year behind? You are either an idiot or a liar.

            Now they have a claim under a small town in Arizona.... Not something I ever wanted to invest in. Ah well....

            1. Replying to @CanadaGrant

              I've always enjoyed your perspective CG but this company can't be considered or analyzed as most publicly traded stocks IMO. 1. This company is not good at PR releases or hyping the company (I've lost way too much dough on previous ones that have!) 2. They are not good at keeping to strict timelines. 3. The information you have received has obviously left a bad impression multiple times. 4. They have a CEO who is a quality accredited geologist who has brought 5 prior projects forward and continues to exercise his share rights in the company. 5. They are now partnered with the premier mining company in Canada and appear to have an extremely good working relationship. 6. They have many of the steps already covered and in place to be able to move toward production when many other projects are not. 7. They have not diluted their shares over the last few years but have chosen to PP instead. 8. They have a major controlling shareholder who's intelligence and experience speaks for itself and he has not altered his company position whatsoever. 9. Teck has sated their goal of increased copper production by 2020 on numerous occasions. 10. CF does not want to be a partner in the production part of SC. I remain committed to my earlier statements that it is a matter of time.
                1. Replying to @CanadaGrant

                  not insider ownership %age in this case though...imo

                  Whatever any insider tells anyone here or o/wise, it can not be of a material nature w/o general publication to the markets. taking talk with a Grain of salt helps. "If i told u i'd have to shoot" etc.

                  Teck are tight lipped in principal so, in other words, we will know 3rd in line....first tck then mgt. then sh. & the markets.

                  sb

                  1. Replying to @sydneyb

                    Not the case here SB. You can't do a PP without diluting the shares. Look at how many we have outstanding.

                    When an "insider" like the ceo tells me something I tend to believe him until he fails his own deadline multiple times and makes a fool of himself. Then I tend to blame myself for actually listening in the first place....

                    By the way... You don't really like being third in line do you?

                      1. Replying to @sydneyb

                        "also, imo, what someone thinks will happen is still not fact - til it occurs."

                        That's the problem Syd. We have been told so much BS that nobody can figure out if it actually happened or not. We were all told when the BFS would be out but it didn't happen then when it did the share price sunk below the toilet. The successful drill program where most of it didn't really take place?

                        In CUU Land believe nothing that you hear and only half of what you actually see.

                        Ever wonder why every time the head guy opens his mouth, the share price drops? Check out the news releases.

                        Heck, even vette and webglugs are gone...

                        1. Replying to @CanadaGrant

                          quote/endquote "heck, even vette and webglugs are gone..."

                          I was surprised to see that Vette has removed Copper Fox from his blog site. I wonder if he still believes in the project. I suppose if he's done promoting it on his blog, we should remove the links to his blog.

                          1. Replying to @HayzToo

                            Vette's been into some extra activities lately, been fluffing us with v.BG

                            Think Vette is dicating most of his time to other holdings, CUU is no longer his priority.

                            Vette can respond to this forum and state his take on CUU.

                                1. Replying to @SweetCrystal

                                  hahahha 3 now....

                                  My original message was this. Weird it showed blank. I wanted to show Vette's last post on what he thought of SC.

                                  ''Other Copper Projects

                                  A small technical work program at Galore Creek is planned for 2014 to incorporate the results of recent drilling activity and engineering studies, with no significant field activity planned. No significant work was done in the fourth quarter at Schaft Creek. Some engineering studies will continue, but no drilling activities are planned for 2014.''

                                  This is a typical Teck Q4 hush hush on spending, it's a forward statement on 2014 for their shareholders. Teck won't come out and say it out loud (not yet).

                                  The official JV meeting is in March, that's when the actual program will be announced.

                                  BTW Elmer has already met with Teck and SC is heading exactly where he wants it.

                                  The Teck AGM is in April.

                                  No drilling = they've seen enough. (we have 2 Billion tonnes)

                                  Engineering studies = moving forward

                                  I'm sure Hole 435 convinced Teck. Hole 435 hit 0.44%CuEq in the inferred block. Higher grades in the inferred block than in the average M&I block.

                                  http://www.copperfoxmetals.com/i/maps/2013_X_sect_6360500.jpg

                                  Schaft Creek is the only project Teck is spending money on. Engineering work is the next step toward a production decision, CUU won't be around for a production decision.

                                  Elmer will probably have Teck squeeze in 3-4 very strategic drill holes as the engineering work is ongoing. You just won't see that in a Teck Q4 forward statement....

                                  You want to see metallurgical work, bump up copper recoveries just 1%..how about 2% and WOW.

                                  This was in the Feasibility enhancement and they are doing it:

                                  Project Enhancements

                                  The Feasibility Study makes recommendations for further development of the project that could enhance the economics of Schaft Creek including:

                                  1. Copper Fox undertakes a diamond drilling program at Schaft Creek with a goal to determine the extent to which the 171.16 million tonnes of inferred resource, that lie within the pit shell, can be upgraded to a Measured or Indicated Resource. To the degree such a program is successful it will remove the affected material from being categorized as a rock removal expense to an ore bearing material and as such, a revenue generator; and
                                  2. Additional metallurgical testwork to pursue opportunities to increase metal recoveries and reduce processing costs.
                                  3. Shorten the project development execution timeline.

                                  Elmer is going to sell this, internal work is being done. Schaft Creek is moving forward.

                                  Arizona looking very very promissing...make sure to sell me all your shares free shares the second Desert Fox is spun...

                                  BTW, this is useful:

                                  https://www.minewiki.org/index.php/The_stages_of_mine_design

                                  Total project design sequence


                                  Project studies and design fit into the total project design sequence as follows:

                                  1. Pre-evaluation study - Exploration drilling, preliminary orebody identification, and venture studies.
                                  2. Concept or Scoping study – This study will present a number of possible options (including “outside the box” options) and provide a very high level review of these options. A conventional (minimal risk) option will be outlined in more detail and an order-of-magnitude cost/schedule developed to a scoping study level of accuracy in order to determine if the site is or has the potential to become a viable project. A successful scoping study will lead to additional work in several areas, including additional diamond drilling for geological resource upgrade, initial geotechnical studies, initial hydrogeological studies, initial metallurgical studies, a start of environmental baseline data collection, and the start of a pre-feasibility study.
                                  3. Pre-feasibility study – Based on the possible options presented in the scoping study, a number of trade-offs will be completed and a preferred Base Case option will be identified. The preferred Base Case option will be developed to a pre-feasibility study level of accuracy to provide some level of confidence in the production capacity/ore grades/metal recovery, capital and operating costs, project schedule, and project risks/opportunities. A financial analysis will be completed in order to assess the economic viability of the project. A successful pre-feasibility study will lead to additional work including detailed geotechnical and hydrogeological studies, detailed metallurgical testwork and initial process studies (process flowsheet defined), the start of a formal community consultation process, the start of Environmental Impact Assessment and permitting processes, and the start of a feasibility study.
                                  4. Feasibility study – The pre-feasibility study selects a Base Case option and provides a mid-level accuracy capital/operating cost, schedule, etc. The feasibility study includes the collection of more detailed information, additional designs, collection of additional project-specific cost information (including vendor quotes for major items) in order to refine the project cost and schedule. The study will also address any information gaps, issues of concern, risks, and opportunities identified in the prefeasibility study. This document must provide the level of confidence for senior management to support the commitment of funds and other resources (often hundreds of millions of dollars) for the detailed project design, project construction, and operation/closure of the facility. A successful feasibility study will permit other parallel activities to continue, including procurement of major (long-lead) plant equipment and materials, finalization of permit applications and submissions for permits, and planning for construction, training programs, safety programs, etc.
                                  5. Detailed engineering – This stage includes completion of detailed designs based on the project scope and concept designs approved in the feasibility study, and the issuing of “for construction” designs, provision of construction and equipment specifications, scope of work packages for contract documents, definition of and procedures for construction quality control, etc. The purchase of key plant equipment often occurs prior to or in parallel with this stage of design, as vendor drawings for equipment are required in order to complete the detailed engineering designs.
                                  6. Site Construction – During the course of construction, “home office” and field engineering will address construction change and drawing/specification clarification issues which arise during the course of construction, carry out inspections to confirm that construction is as per the design, and confirm adherence to appropriate quality control practices. Site engineers may also be required to confirm appropriate as-built records are kept, assemble records of vendor documents (installation instructions, operating manuals, maintenance manuals), and other construction control activities.
                                  7. Commissioning and turn-over to operations – Vendor representatives and field engineering personnel take part in the formal completion of the project including proof of operability testing and acceptance by the Owner that the project construction and performance is as per the design and that it meets the required plant performance and safety requirements. In parallel, the final operating control programs are completed, installed, and tested. All final project information including final design packages, as-built drawings, contract packages and contract close-out documents, operations and maintenance manuals for equipment, quality assurance/quality control records, commissioning records, etc are assembled and formally turned over to the Owner.
      2. I guess if you think that 1.5 million is not much money. Teck investing it in a company to buy shares that they have no control over. This past year donating millions of dollars to charity etc...not much money. Thats fine, we all have our own opinions. No harm in that.

        But when I look at Teck spending all this money, yet trying to cut spending and a possible 600 job cut from Teck, hummm

        Then Teck only spent a small amount of money on Shaft Creek this year. Tells me that they are not in a hurry with us.

        hmmm... you said this Dogger.


        I dont see Teck jumping on this anytime soon. Heck they just spent a bunch on money and another company buying shares ....AGM or something like that?

        You said a bunch of money. What you're saying to me and you can correct me if I perceived your post incorrectly is that SC is not #1 priority on Teck's list. They much rather use their money on another company such as AQM. $1.5 million on AQM instead of Schaft Creek.

        So how much is Teck spending on Schaft Creek? Optimization studies...how much can they cost?

        Schaft Creek Joint Venture:

        Teck Resources Limited ("Teck") as operator of the Schaft Creek Joint Venture has recommended a comprehensive series of studies to review all aspects (including metallurgical, pit slope design, geological modelling and environmental) of the Schaft Creek project. The objective is to review all data collected on the Schaft Creek project to the end of 2013 to update and optimize various parameters of the project. The studies will be conducted internally by Teck and outside consultants will be retained if and when necessary.

        The 2014 program also has a field program planned of mapping and re-logging core to obtain a better structural understanding of the Schaft Creek deposit for pit slope design purposes. Environmental monitoring studies will continue through 2014. The 2014 program is estimated to cost approximately $2.5 million.

        http://copperfoxmetals.mwnewsroom.com/press-releases/copper-fox-commences-drilling-program-at-van-dyke-and-announces-the-2014-schaft--tsx-venture-cuu-201403190934311001


        So I guess in your view...Teck has spent a "bunch" of money on SC this year..

        So if this is the case? Then would the old contract or JV agreement that I and others invested in .....would that not have been better? Taken the chance of battling over the agreement which I might add.....was the agreement that Teck put in place.

        Getting the Laird shares back and not have someone hold on to them....reguardless of supposedly tax purposes. Really you think we are in the best place we are now?

        Teck would have been on a timeline with the old agreement. Im sure our SP would not be where it is.

        Everytime I phone the office and spoke with Elmer before and after we dropped the BFS, Elmer has told me many times.....Teck could jump on this at anytime.

        All I know ... the original agreement....Teck had 4 years to jump (period).....now ....the new agreement, they bought themselves years and years if need be, to invest in other companies and possibly jump on some other new possible mine up and comming. So now we sit and wait.

        I do agree with certain points especially with the 4 years to jump (period). However, I've learned that forcing a large miner to act or spend money within 4 years or within any time period does not make good business sense. Junior explorers objective is to monetize the asset they have and sell it to a miner or at least be a part of the process in bringing it into production.

        If CUU does forces Teck's hand and they see the risk of not fulfilling the obligations and lose the project all together, you're basically asking Teck not to back into this project.

        CUU got the most important part of the agreement and that is the financing aspect. Teck will take us 100% into production. CUU will not get diluted by going to market for money in order to fulfill their capex obligations. I don't think I've seen any other juniors that has this financing agreement. Even Augusta had to sell off their gold and silver streams.

        Yes this agreement allows Teck to "mothball" this project right? I talked to Elmer and he said within Liard Copper, there are other parties and certain criteria prevents Teck from mothballing it.

        That being said, I don't see any difference in a 4 year strict timeline or Teck mothballing it. IF Schaft Creek is that ugly duckling and it's not economically feasible, Teck doesn't need 4 years to decide if they want to bring this into production. They will know if they want it or not, they are not going to waste time on this project. A good example is Catalyst Copper. Teck decided not to back into it.

        1. Without the old contract in place, Teck has no timeline to be held to. Im not saying that will dump us. What im saying is the old contract had a timeline. Now we have NO timeline just the clause where Teck MUST spend (XX) amount of dollars a year on the Schaft Creek project yearly. Thus far the money Teck spent this year I think is peanuts. Teck is cutting back spending ----yet giving money to charities and buying shares into other company`s.

          Teck has been involved with the Schaft Creek project for decades. They were the ones who originally drilled it and then sat back and offered it to other company`s to drill, Like Salizar. Elmer himself said, Now that Teck has it......it shouldn't take long?????

          I guess when I see that I will believe that.

          Yes this agreement allows Teck to "mothball" this project right? I talked to Elmer and he said within Liard Copper, there are other parties and certain criteria prevents Teck from mothballing it.

          If at all possible, can you get this info and share it?

          Unless this is part of the agreement that Teck only needs to spend (XX) amount of dollars a year to keep the agreement alive?

          1. yes there is no 4 year clause, but I did bring this up at the AGM. The Laird partners would prevent a mothballing, it is not in the spirit of the JV. Take a look who the Laird partners are.

            1. Replying to @bigbuck

              The Liard Partners? That would be a common term forTeck who at last count, still hold most of the shares including ours.... You might want to have another look.

          2. Without the old contract in place, Teck has no timeline to be held to. Im not saying that will dump us. What im saying is the old contract had a timeline. Now we have NO timeline just the clause where Teck MUST spend (XX) amount of dollars a year on the Schaft Creek project yearly. Thus far the money Teck spent this year I think is peanuts. Teck is cutting back spending ----yet giving money to charities and buying shares into other company`s.

            Teck has been involved with the Schaft Creek project for decades. They were the ones who originally drilled it and then sat back and offered it to other company`s to drill, Like Salizar. Elmer himself said, Now that Teck has it......it shouldn't take long????

            I guess when I see that I will believe that.

            Dogger, at first you said Teck spent a "bunch" of money on thing such as AQM and not on Schaft Creek. I replied saying how is it AQM a bunch of money? It's just $1.5 million when they earned $80 million in their last quarter. You then said that`s ok if I don`t think $ 1.5 million is a lot. I replied showing you that Teck is spending $2.5 million in the JV this year and you think is peanuts? That`s ok too. If you look back in the FS and see what the recommendations are in improving the values, Teck is going by it actually. Drill the waste (slope of the pit), and now optimization studies. With Canadian $ going lower, it helps the project economics as well.

            I do agree that I like the old timeline in the old agreement. It was very advantageous to us as shareholders as it puts a timer on Teck to act.

            What I learned is that if you were to do something like that and say there are other projects out there, would Don Lindsay like to be forced into paying for a mining asset?

            As I said before, if we all see the potential in SC and that it will become a mine, whether it`s 4 years or not, the pay day will come. And if it`s that economical, Teck will want it to be in production soon.

            I actually look at our situation this way. I`ll imagine that the 4 year clause is still there, so far only 1 year has passed. We have 3 more years left.

            1. Replying to @calvin123456789

              calvin123456789 said:

              " if we all see the potential in SC and that it will become a mine, whether it`s 4 years or not, the pay day will come. And if it`s that economical, Teck will want it to be in production soon".

              correct imo, and between pit design optimization, net of precious metals credits, and waste conversion, i'm pretty sure we will be seen as a prospect with aro. $1/lb.resource cost not too shabby! - when a new owner can get + $3.10/ lb they will get right to work on it!

              sb

  2. "Money back" is so vague it's meaningless.

    Some investors will be getting their money back at 70 cents, some at $1.20, some at $1.85.

    If we make it to $2 when it's all said and done. then those with an ACB of 70 cents did pretty well for themselves.

    I'm going to place this rumour in the "disregard" file.

    1. "Money back" is so vague it's meaningless.

      Some investors will be getting their money back at 70 cents, some at $1.20, some at $1.85.

      If we make it to $2 when it's all said and done. then those with an ACB of 70 cents did pretty well for themselves.

      I'm going to place this rumour in the "disregard" file.

      I guess if this is vague and meaningless that your going to put it in the "disregard" file. Then why would you waste the time to even respond to it?

      1. I guess if this is vague and meaningless that your going to put it in the "disregard" file. Then why would you waste the time to even respond to it?

        Jeez, I don't know, Dogger. Maybe because it's a discussion board where forum members express their thoughts???

        1. Ya, I guess you can express your thoughts the way you want to.

          Heck just take all my posts and file them.

          They are all vague and meaningless in your eyes anyways.

          I just thought instead of be littleing someone......thats what the recommendation button was for.

          after all you have President statues. But hey what do I know

          1. Whoa! You're overstepping.

            Someone claims a CUU director said investors would get their money back. I say it doesn't make much sense so I won't believe it.

            Then you say I view all your posts at vague and meaningless.

            How you draw that line I don't have the foggiest idea.

            Anyway, have a good weekend Dogger. No hard feelings, really!

            1. Replying to @yournadir

              I don't think the statement had anything to do with investors or who invested 20 cents or 2 bucks a share.

              I think it had to do with the fact that Copper Fox spent 90 million dollars and the statement is that in the best case, they might get most of it back.

              It has nothing to do with what you or I invested but looking at it, it's a really stupid statement and I doubt very much he actually said it. If he did, I wish I had heard it before I plunked down my cash.

        2. Agreed, YN. At this point, I run my radar on a "just the facts" basis. Let's hope for the endgame in the nearer term. GLTA.

  3. Don't get me wrong here Dogger. I'm not saying this is true. I'm saying that IF Mike did actually say this, it's the dumbest statement I have ever heard from anyone at Copper Fox and there have been some real qualifiers on that one....

    I also understand what Prospekt is saying but unless Teck moves, we get nothing more than the 24 mil that has already been given out and spent on claims like the ones under some town.

    At this point I would be a pretty happy camper if I got almost all my money back.....

    Hopfully Mike was not being overly optomistic!