Questions on Van Dyke

Interesting news release.

Did the acid consumption seem high? I have no idea what the expected consumption rate is.

  • Is 7.72 lb acid/lb copper excellent, good, fair, marginal or non-economic?
  • Same for the 63% recovery rate - excellent, good, fair, marginal or non-economic?
  • Was the acid consumption stated taking into consideration any possible re-use of the acid?

I did some googling trying to find sulfuric acid prices and they are not easy to pin down, especially current prices in North America. Prices I have found (2010 - present) have ranged between $65 and $350/ton ( $.03 to $.18/lb).

So acid costs (with admittedly questionable source) could be expected to be in the $0.25 - $1.35 range per pound of copper extracted. This is certainly only one aspect of the mining process, doesn't take into consideration shipping, reuse/regeneration factors or disposal costs - but does show that the actual cost of the acid can really effect the viability of the process. If anyone knows actual current pricing please chime in...

The in-situ process is new to me, I found some info about it on the Excelsior Mining website about the process ( http://www.excelsiormining.com/index.php/in-situ-recovery ) also pasted below if anyone is interested. I found the 18 month permitting and only 1 year to be producing pretty interesting. That is pretty nimble.

I guess what I'm trying to find out is do these preliminary results indicate reason to spend more now because they are very promising or suggest putting on hold till the market is better for raising funds or spinning off (ie: higher copper prices, money looking to get back into the Venture).

The additional testing suggested in the report - is this a significant cost or not an issue?

=================================

What is In-Situ Recovery (ISR)?
ISR is an environmentally-friendly process by which copper can be extracted from the ground with minimal disturbance to the surface environment. ISR mining has a long history, starting with uranium mining in the 1960s. Arizona now has 9 of the 14 historical and current global copper ISR projects and has a positive track record for ISR permitting. The San Manuel copper mine, owned by BHP Billiton, was a successful operation that integrated ISR methods with open pit and underground mining and produced approximately 3.25 billion pounds of copper in 14 years of production. Two additional projects owned by BHP Billiton, Pinot Valley and the Miami Unit, also used ISR to extract copper (combined with SX-EW in the case of the Miami Unit). The Florence Copper Project, owned by Curis Resources Ltd., is located roughly 150km to the northwest of Gunnison and is host to a resource of 2.84 billion pounds of oxide copper. The project, which took only 18 months to fully permit, is set to commence production in 2012.

Advantages to In-Situ Recovery Mining:

- Lower capital and operating costs
- No waste or ore moved
- No creation of open holes, waste dumps, leach pads or tailings
- Minimal visual disturbance
- Minimal noise, dust and greenhouse gas impact
- Fewer permits are required compared to other mining processes
- More cost-effective than most other conventional mining techniques, and thus doesn't require as many "pounds in the ground" to make the mine economically viable

These advantages allow access to copper deposits not amenable to conventional mining.

How soon can an ISR mine go into production?
An ISR mine can take as little as 18 months to permit and an a year to build, while it can take at least 3 to 7 years for a conventional mine to be permitted and built. This is because there is less disturbance of ground material and considerably less destructive to the surface and sub-surface material.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. More background on the copper mines in the area and who could be a buyer of the Van Dyke property. Herre's a map from a Capstone Mining slide:

    BHP does not seem to be active, KGHM Carlotta is closing down (http://www.kghminternational.com/our-operations/open-pit/carlota-mine/default.aspx ) but Freeport has plenty of sulphuric acid and may have capacity. CUU will probably have to finish the PEA , apply for permits and then call Freeport to play let's make a deal.

    http://www.fcx.com/operations/USA_Miami.htm

    1. Definitely a big plus to have a large Sulphuric Acid supply and a solution extraction/electrowinning (SX/EW) plant locally. Big transportation cost savings. Their SX/EW plant has a capacity of 200 million pounds of copper per year. I wonder how much spare capacity they have? It does make sense that Freeport would likely be interested in the project considering our close proximity to their facility. Excelsior looks like they have done a good job bringing their property to the PFS stage and their numbers look pretty good - 1.7 billion lbs of recoverable copper. From their website: "Based on an initial production rate of 110 million pounds per year and a US$2.75/lb copper price, the Prefeasibility Study indicates a pre-tax NPV7.5 of US$1.24 billion, pre-tax IRR of 59.7% and a payback period of 1.8 years. Total initial capital expenditures (including contingency) are estimated at US$284.84 million with sustaining capital (including an acid plant) of US$599 and an average life-of-mine direct operating cost of US$0.69/lb. These metrics are amongst the lowest per pound capital and operating costs for copper projects in North America." That being said, they only have a market cap of $31 million. We really are in a crappy market aren't we? Seemingly great project and conservative numbers used ($2.75 copper, 46% recovery) yet so little perceived value right now? Still at PFS stage so I guess that is an issue in this too... Lots of good information at Freeport and Excelsior sites regarding this type of mining. An interesting approach for sure. Some day these properties will be worth a lot of money, hopefully we are still holding them when the profit is to be made. I would imagine Excelsior is eyeing up Freeport too as a possible purchaser?
  2. Went to the excelsior mining site.

    http://www.excelsiormining.com/index.php/news/news-2013/413-excelsior-advances-prefeasibility-provides-positive-metallurgy-test-results-at-gunnison

    http://www.excelsiormining.com/index.php/news/news-2013/392-metallurgy-tests-return-favourable-results-for-in-situ-recovery-at-gunnison

    • Is 7.72 lb acid/lb copper excellent, good, fair, marginal or non-economic?
    • Same for the 63% recovery rate - excellent, good, fair, marginal or non-economic?

    To answer you question, it seems comparable to excelsior.

    I'm still trying to find out an answer if it's good or not but VD stands up to all the other in situ copper mines out there.