Skip to content
Sign in

Post

Copper Fox Metals Inc.

Replies

  1. I'm not a geologist.

    But I am a skeptic when it comes to today's market conditions. I'm going to guess with a fair degree of confidence that a 0.05% cut-off grade totalling 1.44 billion inferred pounds of copper at Van Dyke will not be a needle mover for CUU on the Venture Exchange, unfortunately.

    1. I don't think it is exactaly a straight forward cutoff grade of 0.05%.

      From the realease

      "Copper Fox has selected a 0.05% total copper ("TCu") cut-off for its base case resource estimate (see Table-1). Only acid soluble copper ("ASCu") grades were used in estimating the oxide copper contained within the resource estimate."

      Seems it only is the soluable copper contained. Meaning something could be 0.07% and the soluable part is 0.05%. I believe this is the case, anyone feel free to correct me or chime in on what that might actually mean.


      1. Expanding on this. If the resource estimate is 1.44billion pounds. This would be 1.44billion pounds of soluable copper? If so would the last RE have been done like that? Probably not as there was no acid testing? If so the RE wen't up quite a bit then?

  2. Re: dsikorsk post

    I'm not sure that I understand the mocking tone of your post. I was expecting all or almost all of the RE to be inferred - it is the first one. Why were to expecting anything else? Every mining project I have followed starts off with almost everything as inferred and gradually moves the estimates to proven. I'm pleased to see that the RE (1.4 billion pounds) higher than the historical estimate (1.2 billion pounds). The 43-101 estimates adds credibility (or certainty if you will) to the project. So it may or may not move the SP needle but my investment as another solid leg to stand on. I do agree that it will take a lot of money to make those resources to proven. But the next step is the PEA which doesn't take nearly as much money.

    Also, why based on this RE that you mocking the VD potential value? What were you expecting? Again this is a RE estimate not a valuation estimate - meaning that this news release neither validates or invalidates a valuation method based on pounds in the ground. The point of those valuation exercises is simply to state that our SP is way undervalued. At 1.4 billion pounds = $4.2 billion (using $3/lb copper price). Our market cap with the SP at $0.12 is about 48 million, means our value is only 1.1% of the resource amount - And this values SC at $0.

    However, I agree with your frustration with SC inferred resources. That after 2 years of recommending actions that we haven't seen this as a priority. I long to see what our IRR and NPV would be without this huge inferred handicap.

  3. They used the same cut-off grade as Excelsior's Gunnison project which uses a similar extraction process. Copper is more easily removed from the oxides than the sulphides.

    http://www.excelsiormining.com/images/Presentations/min_ppt.pdf

    It's unlikely the market will add value for Van Dyke until the following statement from the press release is answered:

    The Base Case results of the resource estimate and the recent results from the In-Situ Pressure Leach tests will be used to determine if completion of a Preliminary Economic Assessment ("PEA") of the project is warranted.

  4. Wow that was uneventful, what's next on the dock to be let down on ? The postponed JV till January or maybe we will get it on Groundhog Day. Sigh :(