Copper Fox Metals Inc.

Treasurer2.6 rating from 52 members947 ptsRate

This Week

Hi

Busy week for Elmer.

Meeting with Carmax today. On the agenda is metallurgy and assaying/re-assaying historical drill holes. There are a lot of holes that were never assayed and some only partially.

Tuesday is occupied with all things Van Dyke, what do they need to do to get the PEA done and out?

Wednesday is the JV meet with Teck. Theres basically three outcomes:

1. Teck walks away. Imo 0% chance of this happening.

2. More studies, basically the holding pattern continues.

3. They announce a production decision. They have been doing a 12 year LOM study but there is still the 21 year LOM plan on the table and it can't be ruled out if its to be option three.

I expect news next week.

ttfn

nopoo2

Rick M.

Aheadoftheherd

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Not sure how Teck shareholders would react to a positive production decision at SF at this particular time... Timing is not on our side imo

    1. Not sure how Teck shareholders would react to a positive production decision at SF at this particular time... Timing is not on our side

      Timing has been cruel to us all along.

      They aren't going to make a production decision when they won't even register the reserves until they've finished their optimization studies. They might not make a production decision until after the EA is approved, and it is not even applied for at this point.

      I think the best we can hope for is an update on optimization and a good work plan for this year. We're expecting a bit of further drilling, I believe, so maybe an idea about how the rest of the year is going to roll out.

      1. Timing has been cruel to us all along.

        They aren't going to make a production decision when they won't even register the reserves until they've finished their optimization studies. They might not make a production decision until after the EA is approved, and it is not even applied for at this point.

        I think the best we can hope for is an update on optimization and a good work plan for this year. We're expecting a bit of further drilling, I believe, so maybe an idea about how the rest of the year is going to roll out.

        True but they may not production decision but the work plan can always include road works. If that's the case, it gives us some sort of hint that they are moving forward with SC.

        I really question on why it is taking Teck so long to have this meeting. Originally, it was supposed to be in early December. So it's been almost 2 months (I'm including the short time off during Christmas) to just talk about business as usual on optimization studies?

        I know Elmer was away for vacation during the first two weeks of January so they decided on the JV meeting this week, but Elmer was back on the 14th and was in Vancouver for Cambridge House on the 18/19.

        I just find it strange that Teck is taking so long to just tell us that we are working on the optimization studies.

        Lets hope we get more information than that. Who knows? maybe at this point, Teck has seen enough and they are willing to offer us a number and EE and Elmer will have to see if it's good enough for us? Now I'm dreaming..

        1. True but they may not production decision but the work plan can always include road works.

          Yes, that's true. There is the cheap price of oil that might be taken advantage of at this point in time. I wonder if they could move the camp this year to the place where it is going once the mine is operating? I don't know where that falls under work that is permitted but they obviously were able to build the current camp so I don't see why not.

          Don Lindsay said he likes the cheap oil because it gives him a significant savings on their Fort Hill project but the same could be said of SC.

          I too question why these meetings are delayed if the end result is that things are progressing as planned. They are contractually obligated to meet every quarter but I guess they can both agree to a delay, however shareholders should expect quarterly updates.

          1. In all respect, Regarding the stage that we are at now, I doubt that rushing the camp on site cuz of the current low oil price is the right decision and priority for Teck by now. I am working myself in remoted camps for few years across Canada. And a 800 man's camp surely needs to be taking care of daily. You can't just let it sleep there alone for few years and wait for the opening of a mine. Even if they would have the permits to do so; They still have the electricity cost/propane/ a full time camp maintenance labors/ Shoveling the roof tops and access during winters...security&safety checks...vandalism, wild life...natives...fire issues....insurance....etc..etc.. They would definatly eat back the low oil price money saved in a finger clap! The camp probably won't be built before any infrastructures decisions finaly starts. (road news before) and normaly.. they will most likely go gradualy... starting with a 100 man's camp... then 300...500's....800's until they reach the full production. A working camp do cost millions, and that will definatly be a huge news with a clear message sent to the shareholders............. "in times"......... ;) I think; -EA first..... -then building Roads -setting up the Camp -BC Hydro comes -then Production starts regardless of the oil price! Just in my humble opinion. As per an other similar EA subject: We got stoped once in B-C building an access bridge in Harrisson Lake for a Hydro-Electricity project (Cloudworks) in Port Douglas. Cuz of an Enviromental issue.... There were few rare frogs (species in dangers) randomly founded on our ways. They don't just ram in those lands who have the wills to do so in Canada without enviromental permits. Wishing happy safe day to all ;)
            1. Replying to @fr33man

              Thank you for the interesting information.

              I heard talk when Teck first entered into the JV that they were thinking of building the camp. In a way that doesn't make sense because they might change the location in their optiimization studies, but they might have done that by now.

              The FS states that the current camp which can accommodate 70 people will initially be upgrade to accommodate 100 people during the construction phase. The camp currently has fuel storage, bunk houses, kitchen and dining, shower and laundry, mechanic's shop, generator shop, core shack, log assay shack, recreation hall and an office. The local Tahltan are contracted to provide camp management, so they do the daily care and maintenance as well as providing cooking, etc.

              After the 100-man camp they are supposed to build a 1900 person facility for the construction phase. Presumably this won't happen until they have the EA permit.

              I was thinking they might build the exploration camp for 100 people and put it in the other location that I thought they were looking at.

              Regarding the road, the current permit for Galore Creek allows the road to continue for the 25 km that extend beyond the 40 km that GC already built. After that we need our own permit to take the road 40 km up Mess Creek and over the More Canyon Bridge.

              According to the FS the camp construction is to begin at the same time the Mess Creek Road is to begin. But that's the big exploration camp, not the 100-person upgraded camp.

              I don't think we have frogs, but we have moose.

              1. Replying to @Prospekt

                Thank you Prospekt for the complementary informations. A few interesting numbers that I haven't heard of yet. It does all make sense to me with the 100's -man camps and the further steps to production up to 1900 (a number that I forgot over the time) True, a % of natives are always called and trained to be a part of the working force and developpement of projets on their lands. Majority of them are effectively a part of camps facilities (Sodexo and others) Some are also trained for operators/labors and we even had one natives that we had to trained from scratch as a Heavy Duty Mechanic. Very good and happy people to be around with on work sites. They really appreciate to be around with us and feel very proud to be apart of our projects. A very different view from the tipycal people's judgment. I am expecting the same respectful connection with the Tahltan nations regarding the good communications that we kept with them over the years. ---------/ Mooses/deers/bears.... are much more easier to relocate than Frogs species/fishes. it was impossible for the environnemental team to relocate the frogs due to their specific echo system. So we had to change routes and cancel that bridge access short cut.(unexpected higher cost&delays) Enviromental issue can shot down any projects at anytime, so I'm glad that SC seems to have a good friendly enviromental area.... We all got shocked one morning during the safety meeting when Enviromentalist shut us down our 4 projects operations from 6h00am to 7h00am every morning due to the birds "reproduction season". They founded that birds were too stressed to have their "sexy time" in the mornings cuz of the noise. So NOT a single heavy equipment engine could of been heard by that time. Only a few of the many important issues that mines in B-C can face off at anytime. ( Even after the EA ) And that tells you how picky they are.
                1. Replying to @fr33man

                  ...I can just imagine a room full of tough, weatherbeaten construction crew types being told that the road/bridge/structure they are building has to stop for 1 hour so the local birds can mate..

                  must have been a chorus of guffaws and curses...

                  Nice to hear from a boots-on-the-ground type, welcome fr33man!

  2. They will release it right away. probably by tomorrow to reduce any insider conflict you never know who can hear what these days.

  3. The jv meet was scheduled for 11:30 alberta time and elmer back friday evening following roundup.

    Hi pikerel,

    Just curious, what do you mean by "roundup"

    TIA