Teck presentation deck from this morning

On page 23 they have slotted $105M for new mine development for 2015 in the copper space. Does anyone have any idea where they are spending this money?

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. I'm curious too. I wonder if the JV $4.5 milllion is part of this.

    Did you see that they expect deficits to be around 2017 onwards?

    They don't expect them to be this year or next but the following year.

    1. I found it interesting that the map which shows all their projects does not show Schaft Creek. However, they once again list Galore Creek and Schaft Creek together on page 24 "Growth Options." I don't know why they continually list them together since the ownership is different and the costs are separate.

      The list of growth options should give a hint towards where that $105M is to be spent. Besides us there is Relincho, Mesaba, Zafranal, and HVC.

      On a previous presentation for their copper division they showed Schaft Creek separately from Galore Creek on their map. Also, they colour-coded SC to include in the inferred category. This is likely because they have not yet completed their own 43-101 review and update. Still, for those who seem obsessed with having the resource included it is a step in the right direction.

      In that category of inferred they list 11.1 Mt including Schaft Creek.

      1. This could be something

        "However, they once again list Galore Creek and Schaft Creek together on page 24 Growth Options."

        Over the last few years i have always assumed that Galore Creek could be back in play for Teck by cutting costs with some of the infrastructure in place that schaft creek has... ie clean power, the port etc... They could start these projects up at the same time or start up Galore Creek and work on schaft creek in the backround "as a ghost project" or could be nothing to excited about.

      2. I tracked down that slide to see if Teck may have accidentally released some numbers that could be back calculated to SC from the other project numbers(slide 6 from here: http://www.teck.com/res/tc/documents/_ces_portal_meta/downloads/investors/ir%20presentations/2015%20investor%20day/06_copper.pdf ) . However, the colour coding on the map refers to brownfield(brown dots) versus greenfield (green dots including SC) projects. The resource/ reserves tables list 2P reserves and M,I and Inf resources for all projects and should give the same values as shown in slide 6. See here for the table: http://www.teck.com/Generic.aspx?PAGE=Teck+Site%2fDiversified+Mining+Pages%2fReserves+and+Resources&portalName=tc

        I can match the 2P reserve number easily but I calculate greater numbers for the M+I and inferred values. We'll have to wait for the results from the optimization studies to see if Teck will release some numbers. The project cannot proceed without them.

    2. We'll see, but Rio Tinto is betting on seeing the deficit by the end of this year and 2016. I think many have exaggerated the surplus and the number of new projects that would be coming online, so I think we're going to see increased demand and a big recovery before 2017. Then again, I've been wrong a hell of a lot too.