Copper Fox Provides Update of Activities
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Nov. 6, 2015) - Copper Fox Metals Inc. ("Copper Fox" or the "Company") (TSX VENTURE:CUU)(OTC PINK:CPFXF) and its wholly owned subsidiary Desert Fox Copper Inc. ("Desert Fox") and Northern Fox Copper Inc. ("Northern Fox") are pleased to provide an update on activities. Highlights are as follows:

Schaft Creek:

a.  The management committee meeting of the Schaft Creek Joint Venture was
    held in late October, 
b.  A total of 2,634 metres ('m') were completed in five diamond drill holes
    in the LaCasse zone, 
c.  Drilling in the LaCasse zone intersected numerous intervals of low grade
    copper mineralization. The mineralized intervals where present were
    intruded by a considerable number of late stage barren syenite and
    andesite dikes, 
d.  A study of the surficial geology of the proposed tailing impoundment
    area in the Skeeter Valley was completed, results pending, 
e.  100 samples were collected for geometallurgical testwork representing
    the variation of the lithologies and alteration across the Schaft Creek
    deposit, results pending, 
f.  The results of geotechnical, comminution and electrical optimization
    studies are similar to those presented in the feasibility study
    completed in 2012, and 
g.  An additional 11,800m of historical core has been logged and the data is
    being incorporated into the geological model. This work over the past
    several years has identified several targets located north and south of
    the Schaft Creek deposit that require additional evaluation.
Van Dyke:

a.  The results of the Preliminary Economic Assessment ('PEA') on the Van
    Dyke project are expected to be released on or before the end of
    November.
Eaglehead:

a.  The field program at Eaglehead consisted of two diamond drill holes
    (1,186m) and re-logging and sampling of nine historical drill holes, 
b.  The 2015 drilling and re-sampling has intersected and identified
    significant intervals of copper mineralization over a strike length of
    700m in the Pass Zone. The copper mineralization is open along strike,
    and 
c.  Trace element geochemical studies and updating of the geological model
    is ongoing.
Elmer B. Stewart, President and CEO of Copper Fox stated, "We are pleased with the results to date on all projects. Our current focus is to finalize the Van Dyke PEA and compilation and interpretation of the Eaglehead data. Those aspects of the optimization studies currently underway at Schaft Creek are confirming the previous findings and the balance of this work is expected to be completed by the end of 2015."

Schaft Creek Drill Program:

The drill program was completed to test the mineralization located in 2014 in the LaCasse zone and to test the intrusive/volcanic contact between the LaCasse zone and the Discovery zone located to the south.

The drilling intersected chalcopyrite and bornite mineralization hosted as disseminations and veinlets in granodiorite and quartz monzonite as well as hydrothermal and intrusive breccia. These mineralized intervals have been intruded by a number of late stage non-mineralized syenite and andesite dikes.

----------------------------------------------------------------------------
                  From        To   Interval    copper  molybdenum       gold
DDH #              (m)       (m)        (m)       (%)         (%)      (g/t)
----------------------------------------------------------------------------
SCK-15-440      120.50    167.60      47.10      0.13       0.004       0.20
includes(i)     121.50    134.30      12.80      0.21       0.007       0.69
includes        158.25    165.53       7.28      0.24       0.009       0.06
----------------------------------------------------------------------------
SCK-15-441      120.50    150.00      29.50      0.10       0.001       0.01
                178.50    205.50      27.00      0.09       0.016       0.06
----------------------------------------------------------------------------
SCK-15-442      439.70    454.10      14.40      0.13       0.004       0.01
----------------------------------------------------------------------------
SCK-15-443      354.60    369.00      14.40      0.16       0.002       0.02
                404.00    424.00      20.00      0.17       0.011       0.02
----------------------------------------------------------------------------
SCK-15-444      283.50    466.00     182.50      0.20       0.002       0.02
includes        283.50    313.50      30.00      0.40       0.005       0.05
includes        337.80    361.90      24.10      0.34       0.001       0.01
----------------------------------------------------------------------------
The core intervals in the above table do not represent true thickness. Numbers are rounded for presentation purposes.
Average gold grade of 0.69g/t commencing at 121.5m core interval in DDH SCK-15-440 mostly due to two assays of 1.1g/t and 6.7 g/t gold.

Diamond Drilling and Sampling Procedures:

The diamond drilling was completed using HQ and NQ core size. Overall core recovery was estimated to be greater than 96%. After cutting with a diamond saw, one half of the core is collected for sample preparation and analysis and the other half is retained for future reference. Sample intervals were selected based on lithology changes/alteration intensity/estimated mineral content and ranged from 0.5 to 3.0m. Sample preparation was completed by Bureau Veritas Minerals Laboratory located in Smithers, British Columbia and analyses were completed by Bureau Veritas Minerals Laboratory in Vancouver, British Columbia.

Base metals were assayed using the ACME's FA430 procedure for gold analysis and MA370 for copper and molybdenum. Lower detection limits for the analytical procedures used are: Cu: 0.001%, Mo: 0.001%, gold 0.005 g/t. ACME has an 9001:2008 International Standard Organization rating.

Elmer B. Stewart, MSc. P. Geol., President of Copper Fox, is the Company's nominated non-independent Qualified Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, has approved the scientific and technical information disclosed in this news release.

About Copper Fox

Copper Fox is a Tier 1 Canadian resource company listed on the TSX Venture Exchange (TSX VENTURE:CUU) focused on copper in Canada and the United States with offices in Calgary, Alberta and Miami, Arizona. Copper Fox has four primary assets with associated resources and reserves as noted below:

a.  25% interest in the Schaft Creek Joint Venture with Teck Resources
    Limited on the Schaft Creek copper-gold-molybdenum-silver project
    located in northwestern British Columbia. 
b.  100% ownership of the Van Dyke oxide copper project located in Miami,
    Arizona. 
c.  50.97% of the shares of Carmax Mining Corp. who in turn own 100% of the
    Eaglehead copper-molybdenum-gold project located in northwestern British
    Columbia. 
d.  100% ownership of the Sombrero Butte copper project located east of
    Mammoth, Arizona.

----------------------------------------------------------------------------
       Mineral Reserves                   Reserve Estimate Data             
----------------------------------------------------------------------------
                  Reserve                                                   
Project           Category   Tonnes (Mt)   Cu (%)   Mo (%) Au (g/t) Ag (g/t)
----------------------------------------------------------------------------
Schaft Creek (1)  Proven          135.40     0.31    0.018     0.25     1.81
----------------------------------------------------------------------------
                  Probable        805.41     0.27    0.018     0.19     1.70
----------------------------------------------------------------------------
                  P & P(i)        940.81     0.27    0.018     0.19     1.72
----------------------------------------------------------------------------
      Mineral Resources                   Resource Estimate Data            
----------------------------------------------------------------------------
                  Resource                                                  
Project           Category   Tonnes (Mt)   Cu (%)   Mo (%) Au (g/t) Ag (g/t)
----------------------------------------------------------------------------
Schaft Creek (2)  Measured        146.62     0.31    0.017     0.24     1.78
----------------------------------------------------------------------------
                  Indicated     1,081.94     0.26    0.017     0.18     1.68
----------------------------------------------------------------------------
                  M & I(ii)     1,228.56     0.26    0.017     0.19     1.69
----------------------------------------------------------------------------
Schaft Creek (2)  Inferred        597.19     0.22     0.02     0.17     1.65
----------------------------------------------------------------------------
Van Dyke (3)      Inferred        261.68     0.25     0.00     0.00     0.00
----------------------------------------------------------------------------
Eaglehead (4)     Inferred        102.50     0.29     0.01     0.08     0.00
----------------------------------------------------------------------------
Total             Inferred        961.37                                    
----------------------------------------------------------------------------

-----------------------------------------------------------------
       Mineral Reserves         Copper Fox Share Metal Holdings  
-----------------------------------------------------------------
                  Reserve                                        
Project           Category    Cu (Blb) Mo (Mlb) Au (Moz) Ag (Moz)
-----------------------------------------------------------------
Schaft Creek (1)  Proven          0.23    13.43     0.27     1.97
-----------------------------------------------------------------
                  Probable        1.18    79.88     1.24    11.01
-----------------------------------------------------------------
                  P & P(i)        1.41    93.31     1.51    12.98
-----------------------------------------------------------------
      Mineral Resources         Copper Fox Share Metal Holdings  
-----------------------------------------------------------------
                  Resource                                       
Project           Category    Cu (Blb) Mo (Mlb) Au (Moz) Ag (Moz)
-----------------------------------------------------------------
Schaft Creek (2)  Measured        0.25    13.73     0.29     2.10
-----------------------------------------------------------------
                  Indicated       1.53   101.35     1.56    14.58
-----------------------------------------------------------------
                  M & I(ii)       1.78   115.08     1.85    16.70
-----------------------------------------------------------------
Schaft Creek (2)  Inferred        0.72    50.73     0.84     7.90
-----------------------------------------------------------------
Van Dyke (3)      Inferred        1.44     0.00     0.00     0.00
-----------------------------------------------------------------
Eaglehead (4)     Inferred        0.33    11.52     0.13     0.00
-----------------------------------------------------------------
Total             Inferred        2.49    62.25     0.97     7.90
-----------------------------------------------------------------
Copper in billions of pounds, molybdenum in millions of pounds, gold and    
silver in millions of ounces.                                               
Numbers rounded to reflect best practise principles.                        
(i)Proven & Probable                                                        
(ii)Measured & Indicated                                                    
                                                                            
(1) & (2) Technical Report "Feasibility Study on the Schaft Creek Project,  
BC, Canada", dated January 23, 2013, prepared by Tetra Tech, A. Farah, P.   
Eng.; et al as Qualified Persons; at 0.15% CuEq cutoff. Reserves reported at
$6.60/tonne net smelter return (NSR) cutoff.                                
(3) "Technical Report and Resource Estimation for the Van Dyke Copper       
Project", dated January 30, 2015 prepared by Moose Mountain Technical       
Services, S. Bird, P.Eng and R. Lane, P. Geo as Qualified Persons; at 0.05% 
TCu cutoff.                                                                 
(4) "Technical Report on the Eaglehead Cu-Mo-Au Project, British Columbia,  
Canada", dated June 29, 2012, prepared by Roscoe Postle Associates Inc., B. 
Donough, P.Geo and D. Rennie, P.Eng as Qualified Persons; at 0.16% CuEq     
cutoff.
Note: Above stated Proven and Probable reserves are included in the Measured and Indicated resources reported for the Schaft Creek Project. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

For further information please refer to the Company's website at www.copperfoxmetals.com.

On behalf of the Board of Directors

Elmer B. Stewart

President and Chief Executive Officer

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release contains forward-looking statements within the meaning of the Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934, and forward-looking information within the meaning of the Canadian securities laws (collectively, "forward-looking information"). Forward-looking information is based on management's current expectations and beliefs and is subject to a number of risks and uncertainties that could cause actual results to differ materially from those described in the forward-looking statements. Forward-looking information in this news release includes statements about finalizing the Van Dyke project PEA with results expected to be released on or before the end of November; compiling and interpreting the Eaglehead data; and completing the balance of the Schaft Creek optimization studies by the end of 2015. Information concerning mineral resource and mineral reserve estimates also may be deemed to be forward-looking information in that it reflects a prediction of the mineralization that would be encountered if a mineral deposit were developed and mined. In connection with the forward-looking information contained in this news release, Copper Fox and its subsidiaries have made numerous assumptions regarding, among other things: the geological, metallurgical, engineering, financial and economic advice that Copper Fox has received is reliable and is based upon practices and methodologies which are consistent with industry standards. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently subject to significant business, economic, competitive, market and social uncertainties and contingencies. Additionally, there are known and unknown risk factors which could cause Copper Fox's actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein. Known risk factors include: studies and assessments on the project may take longer than expected to produce results, if at all; the need to obtain additional financing to develop properties and uncertainty as to the availability and terms of future financing; the possibility of delay in exploration; the uncertainty of meeting anticipated program milestones; uncertainty as to timely availability of permits and other governmental approvals; and conditions in the financial markets and the overall economy may deteriorate.

A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's continuous disclosure filings with Canadian securities regulatory authorities at www.sedar.com. All forward-looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events or developments, except as required by law.

CONTACT INFORMATION:
Copper Fox Metals Inc.
Investor line
1-844-464-2820

or

Copper Fox Metals Inc.
Lynn Ball
1-403-264-2820

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. I agree with your interpretation GY, that just those aspects of the optimization work will be completed by year end. I think Radagast posted the other day that the metallurgical component of the optimzation studies would be completed by the end of the month with the report by January. This is a big one, as any change in recoveries would affect the NPV significantly.

    My question is, what is left to complete? Off the top of my head, I think we are winding up what they said they would do for the optimization, including the new LaCasse zone drilling, which wasn't part of the original schedule of work.

    If we are close to winding things up then let's see the new value of the deposit please. And soon.

    K

  2. Here's the full quote with my inserted comment:

    "Those aspects of the optimization studies currently underway at Schaft Creek are confirming the previous findings and the balance of this work *(i.e. only those aspects of the optimization referenced) is expected to be completed by the end of 2015."

    ======================

    I agree with Golf, they are not saying optimization will be complete. I didn't like the part about more targets to explore - that is adding time to completing the study.

    The results for the drilling were not great IMHO, low grades and under at least 100m of overburden. Add to that a relatively short strike length, and I'm sure this isn't what Teck was hoping to find, or it would be good enough to mine that area.

    It will be intersting to see what they have come up with regarding the inferred-only VD PEA in the coming months.

    1. More than likely we as minority shareholders in SC will never see the optimization results,we will be gone never knowing what we truely had in the SC deposit. It all comes down now on what price they both mutually can agree appon. Just the way I see it I know you don't.
    1. My thoughts are as usual with their NR's:

      Vauge, muddy, along with a complete lack of direction.

      I really don't think they have any idea of what sucess looks like. If they do, they certainly don't know how to communicate it to the shareholder.

      f.  The results of geotechnical, comminution and electrical optimization
          studies are similar to those presented in the feasibility study
          completed in 2012
       What about optimization of the waste rock, forex, capex?  All have significantly changed.
      Construction equipment is significantly cheaper,
      Labour is more available,
      Construction material is cheaper,
      Fuel is cheaper,
       
      If my team ever lacked this direction on what needs to be done to complete a project, they would all be fired.
      On a positive, the optimization studies will be complete by Jan 1, 2016 with the PEA for VD targeted by Nov. 30.
        1. First and foremost I want CUU to succeed just as much as everybody here.

          The 5 gold mines he brought to production has weight, but not much, maybe 10%.

          Being in construction, we define a successful project by:

          Cost: What is my ROI. So far we have invested a lot more into it that what we have made as shareholders

          Scope: They have not clearly communicated what needs to be done between now and the liquidation event. After the optimization is complete will we then sell to Teck? When are we putting our 25% up for sale?

          Schedule: Prior to the JV how many target dates were met? Let's leave it at that.

          Quality: Communication to Shareholders is sub par, the presentations are quite well done imo, but in the end they have not marketed themselves well in generating attention to other investors.

          Just because the Leafs have won cups in the past does that account for anything? Yes, but very little as the market changes. If you can't change with it then success is very hard to achieve.

          There is a ton of potential here. I don't argue that one bit. It is how we are executing what needs to be done between now and the end.

          GLTA

      1. You have to realize that this is basically a Teck NR,they having a 75% stake and doing all the work and money spent at SC they have to ok every NR regarding SC that CF releases so you can't fault management for any NR since the formation of the JV before that a different story.
  3. I read ' the balance of the work is to be completed by the end of 2015' to me it means whatever is left to do. I guess we can blame the vaguity of the NR that everyone reads something else.
    1. it's an open ended news release... lot of ways out for Elmer in case we hold him up to something concrete... At least we are moving forward. Hopefully we can sell VD after the PEA.

  4. Ok,but like I said in my previous post this is a Teck approved NR so you have to look at it at that angle. I sure Elmer would want to elaborate more if he could. Just my take.