As mentioned, the NPV is in part based on the amount of money in and out of a business.  In our case, there’s two businesses involved (Teck and Copper Fox).  Based on the SCJV, both have different financial obligations.  Teck needs to fund the project and the money they have to invest does in theory lose value in time.  Therefore, each entity doesn’t necessarily have a NPV based on their share of the project.  I’ll try to better explain this with numbers.

For Teck (75%), see below the approximate stream of net cash flows (in millions) based on the 2013 FS.

Year -5: -100

Year 1: -225

Year 6: 543.75

Year 11: 37.5

Year 16: 18.75

Year -4: -300

Year 2: 600

Year 7: 468.75

Year 12: 150

Year 17: 300

Year -3: -1000

Year 3: 487.5

Year 8: 393.75

Year 13: 318.75

Year 18: 506.25

Year -2: -1000

Year 4: 356.25

Year 9: 318.75

Year 14: 431.25

Year 19: 600

Year -1: -825

Year 5: 431.25

Year 10: 187.5

Year 15: 168.75

Year 20: 675

 

 

 

 

Year 21: 243.75

Entering all these values in the calculator should give you a negative NPV (8%) around (251M). 

 

For Schaft Creek (25%), see below the approximate stream of net cash flows (in millions) based on the 2013 FS.

Year -5: 0

Year 1: 0

Year 6: 181.25

Year 11: 12.5

Year 16: 6.25

Year -4: 0

Year 2: 200

Year 7: 156.25

Year 12: 50

Year 17: 100

Year -3: 0

Year 3: 162.5

Year 8: 131.25

Year 13: 106.25

Year 18: 168.75

Year -2: 0

Year 4: 118.75

Year 9: 106.25

Year 14: 143.75

Year 19: 200

Year -1: 0

Year 5: 143.75

Year 10: 62.5

Year 15: 56.25

Year 20: 225

 

 

 

 

Year 21: 81.25

Entering all these values in the calculator should give you a positive NPV (8%) around 771M. 

 

Conclusion:  The sum of each individual NPV does equal 520M, but we can clearly see that the business case for each company is completely different.  For Teck, the project is not profitable and for Copper Fox its way better than the 128M they are taking credit for today.

IMO.

MoneyK

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Your conclusion doesn't make sense and your whole thesis is more confusing than enlightening.  Total up the years 1-21, and I get $9.425 BILLION.  What's the build and maintence cost, $3 Billion?  Seems profitable to me.

    You can play with NPV calculations all you want, but Schaft Creek is profitable to TECK, in a big way!

        TECK COPPER FOX  
    Year 1 -$225.00 $0.00  
    Year 2 $600.00 $200.00  
    Year 3 $487.50 $162.50  
    Year 4 $356.25 $118.75  
    Year 5 $431.25 $143.75  
    Year 6 $543.75 $181.25  
    Year 7 $468.75 $156.25  
    Year 8 $393.75 $131.25  
    Year 9 $318.75 $106.25  
    Year 10 $187.50 $62.50  
    Year 11 $37.50 $12.50  
    Year 12 $150.00 $50.00  
    Year 13 $318.75 $106.25  
    Year 14 $431.25 $143.75  
    Year 15 $168.75 $56.25  
    Year 16 $18.75 $6.25  
    Year 17 $300.00 $100.00  
    Year 18 $506.25 $168.75  
    Year 19 $600.00 $200.00  
    Year 20 $675.00 $225.00  
    Year 21 $243.75 $81.25  
        $7,012.50 $2,412.50 $9,425.00
    1. Guys it's pointless using old numbers anyways. None of us will give the economics right. Too many variables. 

      Outdated numbers from several years ago. Capex probably below 2 billion now with all the improvements to date.

      1. YM, I've mentionned this before, but the work done in the last 7 years was mostly to improve Teck's business case.  Our value, in therory, is already 771M based on the 2013 FS numbers.  Teck's value was negative, so they had to improve their business case significantly and they will.  We will get to that later with numbers.

        IMO.

        MoneyK

    2. Unfortunately, you can't calculate it like that.  If Teck spends 3B now, the cash flow they will recuperate in the next 21 years are worth less every year as they are discounted 8% per year.  Therefore, you need to bring back all the future cash flows in today's dollars.  That's how you compare projects together.

      MoneyK

  2. Need to correct my assumptions for the post-SCJV scenario as Teck would get all the cash flow until payback is completed.

    For Teck (75%), see below the approximate stream of net cash flows (in millions) based on the 2013 FS.

    Year -5: -100

    Year 1: -225

    Year 6: 725

    Year 11: 37.5

    Year 16: 18.75

    Year -4: -300

    Year 2: 800

    Year 7: 468.75

    Year 12: 150

    Year 17: 300

    Year -3: -1000

    Year 3: 650

    Year 8: 393.75

    Year 13: 318.75

    Year 18: 506.25

    Year -2: -1000

    Year 4: 475

    Year 9: 318.75

    Year 14: 431.25

    Year 19: 600

    Year -1: -825

    Year 5: 575

    Year 10: 187.5

    Year 15: 168.75

    Year 20: 675

     

     

     

     

    Year 21: 243.75

    Entering all these values in the calculator should give you a positive NPV (8%) around 151M. 

     

    For Schaft Creek (25%), see below the approximate stream of net cash flows (in millions) based on the 2013 FS.

    Year -5: 0

    Year 1: 0

    Year 6: 0

    Year 11: 12.5

    Year 16: 6.25

    Year -4: 0

    Year 2: 0

    Year 7: 156.25

    Year 12: 50

    Year 17: 100

    Year -3: 0

    Year 3: 0

    Year 8: 131.25

    Year 13: 106.25

    Year 18: 168.75

    Year -2: 0

    Year 4: 0

    Year 9: 106.25

    Year 14: 143.75

    Year 19: 200

    Year -1: 0

    Year 5: 0

    Year 10: 62.5

    Year 15: 56.25

    Year 20: 225

     

     

     

     

    Year 21: 81.25

    Entering all these values in the calculator should give you a positive NPV (8%) around 369M. 

     

    Conclusion:  The sum of each individual NPV does equal 520M, but we can clearly see that the business case for each company is completely different.  For Teck, the projects profitability was reduced by 239M (from 390M to 151M) and for Copper Fox it increased 239M (from 130M to 369M).

    IMO.

    MoneyK

    1. Ok, now that the NPV concept is well understood, let’s calculate the NPV (8%) with the below assumptions.

      -      Capex at 2.7B and 4 year construction with below cash out.

      o    Y1: -400M

      o    Y2-3: -800M

      o    Y4: -700M

      Net cash flows:

      o    Y1-7: 900M

      o    Y8-21: 600M

      Entering all these values in the calculator should give you a positive NPV (8%) around 3.2B for 100% of the project.

      The interesting portion is to look at the change for each company.  Let’s remember that the NPV (8%) values were 151M for Teck and 369M for Copper Fox.

       

      For Teck (75%), see below the approximate new stream of net cash flows (in millions) based on the above assumptions.

      Year -4: -400

      Year 1: 900

      Year 6: 675

      Year 11: 450

      Year 16: 450

      Year -3: -800

      Year 2: 900

      Year 7: 450

      Year 12: 450

      Year 17: 450

      Year -2: -800

      Year 3: 900

      Year 8: 450

      Year 13: 450

      Year 18: 450

      Year -1: -700

      Year 4: 675

      Year 9: 450

      Year 14: 450

      Year 19: 450

       

      Year 5: 675

      Year 10: 450

      Year 15: 450

      Year 20: 450

       

       

       

       

      Year 21: 450

      Entering all these values in the calculator should give you a positive NPV (8%) around 2.3B

       

      For Schaft Creek (25%), see below the approximate stream of net cash flows (in millions) based on the above assumptions.

      Year -4: 0

      Year 1: 0

      Year 6: 225

      Year 11: 150

      Year 16: 150

      Year -3: 0

      Year 2: 0

      Year 7: 150

      Year 12: 150

      Year 17: 150

      Year -2: 0

      Year 3: 0

      Year 8: 150

      Year 13: 150

      Year 18: 150

      Year -1: 0

      Year 4: 225

      Year 9: 150

      Year 14: 150

      Year 19: 150

       

      Year 5: 225

      Year 10: 150

      Year 15: 150

      Year 20: 150

       

       

       

       

      Year 21: 150

      Entering all these values in the calculator should give you a positive NPV (8%) around 900M

       

      Conclusion:  Teck would move from 151M to 2.3B (15x the initial value) and Copper Fox would move from 369M to 900M (2.5x the initial value).

      IMO.

      MoneyK

      1. good for them, now what do I get out of it?

        Thanks for all the hard work, but we still don't know any more than before.

  3. Here’s the split before the SCJV was formed.

    For Teck (75%), see below the approximate stream of net cash flows (in millions) based on the 2013 FS.

    Year -5: -75

    Year 1: -168.75

    Year 6: 543.75

    Year 11: 37.5

    Year 16: 18.75

    Year -4: -225

    Year 2: 600

    Year 7: 468.75

    Year 12: 150

    Year 17: 300

    Year -3: -750

    Year 3: 487.5

    Year 8: 393.75

    Year 13: 318.75

    Year 18: 506.25

    Year -2: -750

    Year 4: 356.25

    Year 9: 318.75

    Year 14: 431.25

    Year 19: 600

    Year -1: -618.75

    Year 5: 431.25

    Year 10: 187.5

    Year 15: 168.75

    Year 20: 675

     

     

     

     

    Year 21: 243.75

    Entering all these values in the calculator should give you a positive NPV (8%) around 390M. 

     

    For Schaft Creek (25%), see below the approximate stream of net cash flows (in millions) based on the 2013 FS.

    Year -5: -25

    Year 1: -56.25

    Year 6: 181.25

    Year 11: 12.5

    Year 16: 6.25

    Year -4: -75

    Year 2: 200

    Year 7: 156.25

    Year 12: 50

    Year 17: 100

    Year -3: -250

    Year 3: 162.5

    Year 8: 131.25

    Year 13: 106.25

    Year 18: 168.75

    Year -2: -250

    Year 4: 118.75

    Year 9: 106.25

    Year 14: 143.75

    Year 19: 200

    Year -1: -206.25

    Year 5: 143.75

    Year 10: 62.5

    Year 15: 56.25

    Year 20: 225

     

     

     

     

    Year 21: 81.25

    Entering all these values in the calculator should give you a positive NPV (8%) around 130M. 

     

    Conclusion:  By not having to finance 25% of the capex, Copper Fox increased its NPV (8%) from around 130M to 771M when signing the SCJV, an increase of 641M.  Teck's portion was therefore reduced proportionally.

    Note: This calculation does not include any milestone payments.

    IMO.

    MoneyK

    1. Using your numbers and assuming them to be correct, the joint venture can make $6.2 billion over 21 years.  Again, very profitable to TECK!!!

      Everything else you're spewing is intellectual VOMIT.

          TECK COPPER FOX   Year 1-5
      Year 1 -$225.00 $0.00   -$100.00
      Year 2 $600.00 $200.00   -$300.00
      Year 3 $487.50 $162.50   -$1,000.00
      Year 4 $356.25 $118.75   -$1,000.00
      Year 5 $431.25 $143.75   -$825.00
      Year 6 $543.75 $181.25   -$3,225.00
      Year 7 $468.75 $156.25    
      Year 8 $393.75 $131.25    
      Year 9 $318.75 $106.25    
      Year 10 $187.50 $62.50    
      Year 11 $37.50 $12.50    
      Year 12 $150.00 $50.00    
      Year 13 $318.75 $106.25    
      Year 14 $431.25 $143.75    
      Year 15 $168.75 $56.25    
      Year 16 $18.75 $6.25    
      Year 17 $300.00 $100.00    
      Year 18 $506.25 $168.75    
      Year 19 $600.00 $200.00    
      Year 20 $675.00 $225.00    
      Year 21 $243.75 $81.25    
          $7,012.50 $2,412.50 $9,425.00  
              -$3,225.00  
              $6,200.00