News out. So Desktop study completed?

Last steps to a decision in VD is regulatory discussions & meetings? 

"currently working on scheduling meetings with the EPA and ADEQ to obtain preliminary comments to further define the scope of work and other concerns, all fundamental to establishing next steps for the project"

Anyone else feel like this is taking too long? Seems like stalling tactics and games.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. I don't get the sense of stalling here. They are laying out the process of obtaining permits from state and federal levels of govt, as recommended in the PEA. This is the process, and where they are on it. So, their consultant has scoped out what is needed to get things going and costed it out, looks like they've gone down this road before. Standard stuff, IMHO. I work for Canadian fed govt env dept so nothing out of the ordinary to me.

    Big question is, at what point do we unload VD? A potential buyer would have questions about this whole process, which they can now answer. Their biggest question would probably be, what is the risk associated with in situ leaching at this site? Given the other operations close by, things look promising but need to be verified for VD.

    I am presuming the rights of the Miami residents question has been addressed already...can't recall. Anyone know where the town of Miami gets its water from? This would also be a concern I would have, the potential for contamination of the drinking water supply for the town directly above. Can't recall anything on that either...

    K

      1. Thanks for confirming. Not surprising, as it is Arizona. So, the in situ leaching method for the mine needs to be done in such a way that the goundwater source of water for the town of Miami is not affected. This is such an obvious dealbreaker that it must have been looked into at the outset and the hydrogeological modelling requirement will demonstrate it is a non-issue. That's an assumption on my part though as I haven't talked to the office myself about this.

        K

        1. Should we have looked into the extent of the clay layer before purchasing this property.

          Is this property saleable at this point?

          1. By my recolection, they had looked into it and I assumed it was concidered a risk worth taking. But it was mentioned at one point in time, that the mine was shut down because of ground water contamination. But I can't say if this is fact or not. 

            1. Replying to @abullion

              Last time I spoke with ES regarding this property was a while ago but he was very positive about the municipality's acceptance of mining & it's beneficial employment associated. I believe the water issue had been addressed. There are major players in the area and this property could be a diamond in the rough for how cheap we obtained it for. A major can always fast track time lines so I don't think that's a factor for us at this point. Let's put it under the tree for an Xmas gift instead of coal this year!!

              LS 

               

                1. Replying to @abullion

                  I believe the VD property previously was mined using in situ methodology so there should be no surprises. The geology is not like the Excelsior  Gunnison disaster and Taseko Florence has already run a long test  in situ mine. 
                  We should sell VD to distribute a small dividend ($.30 a share) and cash up the company. 

                    1. Replying to @youngmoney

                      100% NAV for VD, that's 5-10 years away and still risky is not going to happen in my opinion.  If they can get 50%, that would make my day.

                      MoneyK

                        1. Replying to @accountant007

                          I'd take that anytime and maybe purchase more shares for the next asset (or company) sale.  Could be good leverage and would support the SP.

                          MoneyK

                          1. Replying to @moneyk

                            How come everything looks great with 2 advanced assets and others that look promising. Why are we trading at .23 cents anf up to .60 cents. We are trading with thin volume, little selling pressure could see us slip further, no support? Why?

                            I am always afraid of what we dont KNOW. WE better start asking ourselves what is it we are missing, Is the agreement with teck not as it appears? Always thought partnering with a major would be a positive for share price.

                            Hoping to get a quick turnaround in shr price to alleviate those Fears.

                             

                        2. Replying to @accountant007

                          WAY TOO LOW!! No chance.

                          If you watch Elmers recent public interview- he confirms the company's NAV IS 840 million- at that date representing 16% of nav when looking at trading price! He stated this is way too low.

                          840 million nav includes SC & VD After tax economics! This means the company wants full nav in a buyout at minimum (starting point in buyout discussions).

                          25-30% of nav is not correct. Contact the office and report back if the 30% is accurate- they might laugh at you

                            1. Replying to @remedy

                              We have to listen to him lol! He's the guy we are trusting to sell our projects!

                              We haven't been invested here for 12 years for 25% of nav! These are very advanced assets in the industry. Full nav is warranted.

                                1. Replying to @remedy

                                  We are trading at this miserable low because those out there who know about us don't believe in management and the the rest of investors don't know about our assets. Drilling for new "gold" is more exciting than desktop studies. 

                                  1. Replying to @accountant007

                                    We are at these levels because we have no institutional support and our stock is mostly driven by the flavour of the moment.  When copper prices start to move towards $5, investors should get back in the sector.

                                    IMO.

                                    MoneyK

                                    1. Replying to @moneyk

                                      Our price is so low because management is so lazy, on VD they knew we needed these permits years ago to advance the project but are only "talking" about it now.  On SC they cannot even convince Teck to respond (from a price point whose word would you rely on Teck or Elmer).

                                      Yes we are relying on 5$ copper definitely not management.

                                       

                                       

                                       

                                    2. Replying to @moneyk

                                      Hey - guys and gals SP is UP a bit over yesterday ON A DOWN DAY!!!

                                      I spent 1 hr Last Nite Listenning too this NICKEL stock PROMO to get us to SPEND $49.00 to get the name so I seached NICKEL and bot 22 small Nickel stocks instead one 3 KN east of STEWART BC in the golden triangle

                                      Go
                                       
                                       
                                       

                                       
                                       
                                       
                                       
                                       
                                       
                                       
                                       
                                      Status  Action  Quantity 
                                       
                                      Symbol  Type  Price 
                                       
                                      Act. Price 
                                       
                                      Time-in-Force  Reported 
                                       
                                       
                                       
                                       
                                          Filled Buy 600   CMETF Limit 0.1367   --   -- 11:27:25 11/30/21
                                       
                                       
                                       
                                       
                                       
                                          Filled Buy 200   TTSRF Limit 0.3489
                                      1. Replying to @chuckalau2

                                        Continued

                                         in the golden triangle But listen 30  miins into presentaion what they say about COPPER and COBALT:::

                                        COhuckauu

                                         

                                        and so:

                                        Cover margin call View balances

                                        Potential maint call: -$43.84
                                         
                                        A potential maintenance call means action may be required if your account goes into a call. Your account will go into a maintenance call if its value drops below our maintenance requirements due to changes in the market value of a security or when you exceed your buying power. If your account goes into a maintenance call, you can meet it by depositing funds, selling stock, or depositing securities. In a call, TD Ameritrade may forcibly liquidate all or part of your account without prior notice, regardless of your intent to satisfy a margin call, in order to protect your interests or ours.
                                  2. Replying to @accountant007

                                    I get it, but why are we not under Everyones radar all these years. That is a big problem. We need stronger and more vocal management during this EV revolution. Our timing is now. Another opportunity missed

                                    1. Replying to @remedy

                                      I think everyone keeps forgetting we are basically a private company.  Considering only a few people own over 50% of the company.

                                       

                                       

                          1. Replying to @youngmoney

                            They can easily play with words and sell the entire company for 840M without anyone really knowing where the value is coming from.

                            E.G. 500M from SC, 200M from VD and 140M from the rest

                            That would give the impression they sold the company for 100% of the NAV, as other properties have no established value supported by a 43-101.

                            MoneyK

  2. Not bad we (or Buyer ) spends under $4 miillion to get about a half billion in asset value..My GUESS on VD...value

    ORIGINAL: Copper Fox Provides Update on Van Dyke Project

     

    2021-11-29 06:01 ET - News Release

     

    Calgary, Alberta--(Newsfile Corp. - November 29, 2021) - Copper Fox Metals Inc. (TSXV: CUU) (OTCQX: CPFXF) ('Copper Fox' or the 'Company'), through its wholly owned subsidiary Desert Fox Copper Inc., are pleased to provide an update on its 100% owned Van Dyke in-situ copper recovery ("ISCR") project located in the Globe-Miami Mining District, Arizona. Montgomery & Associates ("Montgomery"), a water resource consulting firm headquartered in Tucson, AZ, completed an Order of Magnitude (+/-30%) estimate of the timeline, costs and data/surveys required to complete the hydrogeological portion of the pre-application and formal permitting process for the Van Dyke project.

    Highlights

    • The Underground Injection Control Permit and Aquifer Protection Permit are the primary permits to be obtained.
    • The pre-application phase is estimated to take between 2-3 years, this will be followed by a 1.5-2 year permitting process after the applications are submitted.
    • Engineering costs are estimated at $US3.9 million for the pre-application phase and $US1 million for the post-submittal phase.
    • Logging the drill core from the Azurite target indicates that sampling of the last 40m of core from DDH AZ-3 should be completed.

    Elmer B. Stewart, President and CEO of Copper Fox stated, "Copper Fox, in conjunction with Montgomery, is currently working on scheduling meetings with the EPA and ADEQ to obtain preliminary comments to further define the scope of work and other concerns, all fundamental to establishing next steps for the project. The drill holes required for the hydrogeological investigation can also be used to obtain additional analytical results and samples to better inform the metallurgical and geotechnical variability within the deposit and to advance the project to the pre-feasibility stage. The 40m interval of secondary copper at the bottom of DDH AZ-3 is encouraging and supports the expansion potential of the Van Dyke deposit to the southwest."

    Background to the Data Gap Study
    The Preliminary Economic Assessment ("PEA"), announced in early 2021, demonstrated robust project economics and concluded that the Van Dyke deposit has the potential of becoming a mid-tier copper project. The PEA recommended advancing the project to the pre-feasibility stage with an estimated budget of $US15.5 million including permitting and wellfield pilot testing.

    Permitting Considerations
    Permitting of a resource project in the United States includes investigating the current and long-term effects of the proposed project on surface water, groundwater, cultural and biological resources and air.

    In the pre-application phase, Hydrogeological/Water Quality/Air/Biological/Cultural data are collected to support the formal application and other requirements of the EPA/ADEQ. On submission of the formal permitting application, the EPA/ADEQ completes an in-depth review of the technical data presented in the permitting application followed by a public comment period. An overview of the two primary permits to be obtained is described below:

    Underground Injection Control ("UIC") Permit issued by the United States Environmental Protection Agency ("EPA") addresses the design, construction, integrity, and closure of injection/recovery wells to protect underground sources of drinking water from injection fluid migration. The UIC permitting process requires details of aquifer characteristics, groundwater flow, geochemistry (including baseline) demonstration of fluid injection hydrodynamics control, operations, monitoring, closure, and post closure monitoring.

    Aquifer Protection Permit ("APP") issued by the Arizona Department of Environmental Quality ("ADEQ") covers mining related discharge (or potential discharge) from mine facilities with potential to discharge to groundwater.

    Montgomery OOM
    Montgomery completed an Order of Magnitude (+/-30%) estimate of the timeline and engineering costs to complete hydrogeologic studies to support the UIC and APP permits for the Van Dyke project. The study outlined the status of the project and recommends a seven-stage approach as set out below;

    Stage Description Tasks and Required Expertise OOM Cost (±30%)
    1 Desktop Review Identify data gaps, outline regional hydrogeology of Miami area, conceptual model development $100K
    2 Field Program1 Regional geology and hydrogeology, geophysical interpretation, , state-level drilling/well permitting, drilling contractors, ADEQ and EPA monitoring well design, construction, and sampling $2M
    3/4 Hydrogeologic and Geochemical Studies/Models Advanced modeling in complex hydrogeologic settings, advanced geochemical interpretation and modeling and materials characterization, integration of groundwater and geochemical models $1M
    5 Engineering Coordination2 Familiarity with surface and subsurface mining facilities and ISCR well design $150K
    6 Prepare Application Experience compiling APP and UIC permit applications $300K
    7 Post-Submittal Support3 Experience with addressing deficiencies and enquiries from ADEQ and EPA $350K
      20% Contingency   $780K
      ADEQ APP Review4   Up to $200K
      TOTAL OOM COST   $4.9M

     

    1. Estimated cost for a field program does not include lab costs, drilling contractor, equipping wells, etc.
    2. Engineering design cost estimates assumed to be included in pilot program and operational design cost estimates and not specific to permitting, costs include engineering coordination activities specific to APP and UIC permit applications
    3. Post-submittal support includes addressing minor reviewer inquiries and does not include substantial/additional studies or field work identified during regulatory review; estimated to be 10% of total costs for Stage 1-6
    4. ADEQ invoices applicant up to $200K for time to review APP application

    Stage-1 has been completed and the key findings are summarized below:

    • Hydraulic conductivity values for the Gila Conglomerate and Pinal Schist (based on regional data) are variable and site-specific data will be required to support permitting. The historical data suggest a low hydraulic connectivity in the Pinal Schist.
    • Understanding the hydraulic characteristics of the faults will be important in modelling the movement of groundwater at the site to better-understand and simulate dewatering and ISCR wellfield operations.
    • Groundwater quality data from existing monitoring wells sampled in 2015 near the Van Dyke Shaft do not indicate any exceedances of regulatory standards.

    Data gaps include lack of current water level measurements and background water quality data in the vicinity of the proposed ISCR wellfield and uncertainty regarding the extent and thickness of a clay layer at the base of the Gila Conglomerate. If laterally extensive, this clay layer could isolate the mineralized zone from the aquifer in the overlying Gila Conglomerate, which would be a positive feature for permitting the ISCR wellfield.

    Montgomery recommendations based on Stage 1 key findings:

    • Installation of Vibrating Wire Piezometers in future drillholes to monitor groundwater levels and vertical gradients.
    • Installation of datalogging transducers in existing wells and in the Van Dyke Shaft to monitor groundwater levels.
    • Downhole video surveys of existing wells and the Van Dyke Shaft to verify historical records and assess downhole conditions.
    • Obtaining pumping records (or estimates) for groundwater withdrawals by adjacent mining operations and other users to refine the conceptual hydrogeologic model of the site.

    Stage-2 of the Montgomery study recommends establishing a project wide system of monitoring wells as part of a comprehensive program to:

    • Monitor background groundwater quality and temporal changes in groundwater levels.
    • Conduct aquifer testing to establish site-specific hydraulic conductivity and storage values.
    • Conduct downhole geophysical logging to delineate the extent and thickness of the clay layer at the base of the Gila Conglomerate.

    The data obtained from the above activities would be used to develop a numerical groundwater flow and transport model to support permitting of the ISCR wellfield.

    Elmer B. Stewart, MSc. P. Geol., President and CEO of Copper Fox, is the Company's non-independent, nominated Qualified Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, and has reviewed and approves the scientific and technical information disclosed in this news release.

    About Copper Fox:

    Copper Fox is a Tier 1 Canadian resource company focused on copper exploration and development in Canada and the United States. The principal assets of Copper Fox and its wholly owned Canadian and United States subsidiaries, being Northern Fox Copper Inc. and Desert Fox Copper Inc., are the 25% interest in the Schaft Creek Joint Venture with Teck Resources Limited on the Schaft Creek copper-gold-molybdenum-silver project located in northwestern British Columbia and the 100% ownership of the Van Dyke oxide copper project located in Miami, Arizona. For more information on Copper Fox's other mineral properties and investments visit the Company's website at http://www.copperfoxmetals.com.

    On behalf of the Board of Directors

    Elmer B. Stewart
    President and Chief Executive Officer

    For additional information contact:
    Lynn Ball: [email protected]
    (844) 464-2820 or (403) 264-2820

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

    Cautionary Note Regarding Forward-Looking Information

    This news release contains forward-looking statements within the meaning of the Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934, and forward-looking information within the meaning of the Canadian securities laws (collectively, "forward-looking information"). Forward-looking information is generally identifiable by use of the words "believes," "may," "plans," "will," "anticipates," "intends," "budgets", "could", "estimates", "expects", "forecasts", "projects" and similar expressions, and the negative of such expressions. Forward-looking information in this news release includes statements regarding recommendations of the PEA; a data gap analysis to determine requirements to enter a formal permitting process; preliminary meetings with the EPA and ADEQ; obtaining an UIC and APP permits; an ISCR wellfield pilot test program; and opportunities to advance the project to the pre-feasibility stage.

    In connection with the forward-looking information contained in this news release, Copper Fox and its subsidiaries have made numerous assumptions regarding, among other things: the geological advice that Copper Fox has received is reliable and is based upon practices and methodologies which are consistent with industry standards and the reliability of historical reports. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies.

    Additionally, there are known and unknown risk factors which could cause Copper Fox's actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein. Known risk factors include, among others: the data gap analysis may not be completed as planned or at all; the recommendation of the PEA may not be completed as planned or at all; the UIC and APP permits may not be obtained; the ISCR wellfield pilot test program may not be undertaken as planned or at all; discussions with the EPA and ADEQ may be delayed or not scheduled; potential to enhance project value may not be achieved; the financial markets and the overall economy may deteriorate; the need to obtain additional financing and uncertainty of meeting anticipated program milestones; uncertainty as to timely availability of permits and other governmental approvals.

     

    A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's continuous disclosure filings with Canadian securities regulatory authorities at www.sedar.com. All forward-looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, eve

    1. Seems long to me. We are still looking at  Pre application is 2.5 to 3 years and permitting is 1.5 to 2 years according to highlights. Total is possibly 5 years? Not sure I've got this right. Or is this considered normal?