Skip to content
Sign in

Post

Copper Fox Metals Inc.

Treasurer2.3 rating from 64 members9.5K ptsRate

SC PEA Grades

PEA average grades first 5 years:

  • Copper: 0.288%
  • Gold: 0.203 g/t
  • Moly: 0.014 %
  • Silver: 1.225 g/t

Hole SCK-21-445 (from 47m to 130m)

  • Copper: 0.365%
  • Gold: 0.212 g/t
  • Moly: 0.015 %
  • Silver: 1.63 g/t
  • CuEq: 0.50%

Hole SCK-21-447 (7m to 116m)

  • Copper: 0.411%
  • Gold: 0.56 g/t
  • Moly: 0.004 %
  • Silver: 2.84 g/t
  • CuEq: 0.70%

These two holes showed higher grades near surface vs. what was used in the PEA.  If they can get more good results near surface, grades used in the PEA could possibly be revised upwards?

More grades = more $$$.  More recoveries = more $$$.  More throughtput = more $$$.

EBITDA first 5 years was $695M US.  I could see this increase by another $100M US per year with more aggresive grades, recoveries and thoughtput.

After, using $3.50 US copper would add another $100M US?  Even better, using $3.75 US copper would add $200M US?

From $695M US to possibly $1B US EBITDA per year?  That would make a nice difference on the NPV.

IMO.

MoneyK

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. It doesn't take much to boost SC's after-tax NPV (8%) above $2B US.

    • Reduce the construction timeline by 1 year
    • Increase only the first (5) years EBITDA by $100M US per year with better grades, recoveries and throughtput
    • Use copper at $3.75 US instead of $3.25 US

    Per my calculation, only the above would translate into possibly a $2.5B US after-tax NPV (8%) valuation?

    IMO.

    MoneyK

    1. Need to revise yesterday's post.  Something didn't make sense in my calculation.

      • Reduce the construction timeline by 1 year
      • Increase only the first (5) years EBITDA by $100M US per year with better grades, recoveries and throughtput
      • Use copper at $3.75 US instead of $3.25 US

      I'm thinking that:

      1. Reducing the construction timeline could increase NPV (8%) by around $100M US
      2. Optimizing the first (5) years could add maybe another $100M - $150M US?
      3. Copper at $3.75 US would increase it by another $500M.

      Therefore, $1.5B US could be a more reasonable target with these parameters.

      MoneyK

      1. Believe I figured out assumption 2.

        1. Reducing the construction timeline by 1 year could increase NPV (8%) by around $100M US
        2. Optimizing the first (5) years could add maybe another $250M US for every $100M US EBITDA increase.
        3. Copper at $3.75 US would increase it by another $500M.

        Therefore, $842M + $100M + $250M + $500M = $1.7B US.

        IMO.

        MoneyK

        1. Great stuff MK, while I don't understand all the gritty details that enter such calculations, seeing them and debating them here is one of the most valuable things I get from this board. Many thanks for doing this and keep 'em coming!

          You mentioned re-doing the PEA with the new numbers from this year's work, when they are in. I wonder if that will be a necessary step for CUU to trigger ROFO. I say this because CUU took great pains to have Teck review the PEA as it was developed, and for which CUU paid. This went beyond CUU having good faith as a JV partner IMHO. I think it was to establish a baseline value for SC, from which activities beyond it add value.

          Am I mistaken that the estimates you are making for value from reduced construction timeline, Cu price, etc. could not now be easily calculated by the SCJV to add to the 2021 PEA baseline to enable CUU to declare, "OK, we now calculate SC project value to be $1.7B, with 25% as $425M. Add on exploration potential, carried to production, Liard shares, etc. =$xxx". Such an assessment would not require an updated PEA (taking 6 months) for CUU to trigger ROFO, and Teck cannot dispute the 2021 PEA or the added valuations. Teck could then buy out CUU's proportion, add more value the following year in massive drilling, etc. and strike a new deal with a new partner and have it all look good for their shareholders and those of the new partner. Just a thought while we wait.

           

          K

          1. Kinte,

            You're welcome.  I try to the best of my knowledge.

            I'm sure Teck could easily figure this out, but for the best interest of shareholders, assuming Teck does not agree with our valuation and passes on ROFO (they passed for Galore), would Copper Fox need a revised PEA to back-up the number and shop around?

            Would some shareholders debate the valuation because there's no official document available?

            Knowing how conservative Copper Fox has been, would they risk not having it?

            MoneyK

            1. Replying to @moneyk

               Good points MK. Given that SC will be the 1st monetization event for CUU, and complete their corporate strategy cycle, I can see how they would want to maintain their conservative, methodical approach. This would be a long game mindset where they can point to this deal with a major as their biggest milestone, serving them well in future negotiations with their other projects, possibly to other majors.

              K

            2. Replying to @moneyk

              Updating pea takes 6 months (that's what VD took).  Q's is does Teck want CUU to go through with it?

               

              At what point does Teck feel like SC is their next project and they want to buy out the partner and consolidate SC? I do feel that it's better for Teck to act first vs using updated pea and rofo it. 

               

               

  2. As always....great post MK.

    What do you take from Elmer's interview where the question asked about the next 12-24 months? AKA 2 years timeline

    Elmer didn't calm our nerves by saying we shouldn't be here, hopefully sold.....he gives his response of lots of news flow!

    Is it possible we sit here unsold for another 24 months (2 years!!)??? 
    Does Elmer want to stay for a 2023 program?

    1. It will take minimum 6 to 12 months to get the drilling & metallurgical results.

      After, the PEA will most likely be updated to back up any sale... that's another 3 to 6 months?  Shouldn't take 6 months to update a well defined PEA, but it's Teck and Copper Fox... so who knows!

      Unless Teck comes for us with an offer above $500M US, we could still be around for 12-24 months.

      IMO.

      MoneyK

  3. I agree Jimmy.  This is how i see it.


    ROFO, price set and can't go higher unless somebody else offered higher price.  Teck has choice to say yes or no.  Risk of it lower too if we negotiate?

     

    If Teck wants us, they will prob present their base price and can negotiate higher.