ReplyI wanted a written version of Elmer's interview. I used a transcribe tool to convert it to text – I then lightly edited that text – sometimes adding my own bolding. I also rearranged that text back into per project. End results is kinda weird I admit. Take it or leave - there is nothing new below that wasn't in the video.
I find I am getting more interested in the other projects than just Schaft Creek. I have tended to gloss over non-SC news but now am looking forward to more news.
Van Dyke
Near term mid sized ISR Project - 40,000 tons /year project
I think Van Dyke was one of the one of the projects that really attracted me to the company, simply because it's spotlight hitting Arizona right now. Whether you look at developments coming from Tesco or Florence, which is another advanced stage, ISR copper project, which should be hitting production by the end of the year. But also if you look at other projects in the area in in in that in that state, whether it's Cactus from Arizona Sonoran, Gunnison, or even just recently, Santa Cruz of PFS. Yes. These are heap leach projects, but regardless, there's a lot of a lot a lot of positive things happening in Arizona.
How do you see the developments at Van Dyke shaping up, let's say in the next two years?
First and foremost, we get the execution plan completed, and then the board then has a clear understanding of what they would be asked to consider. Personally, I think because the Van Dyke has been classified as a near term midsize copper mine capable of producing approximately in the order of 40,000 tons of copper a year. It is, like I said earlier, it's an in situ copper recovery project. These are generally much more friendlier from greenhouse gas emission, water consumption, energy consumption type projects. And so I suspect that over the, hopefully, the next two years, we the company should but it has to make a decision whether it's going to do it.
But if it does make the decisions, whether hopefully within a couple of years, we'll finish the preliminary feasibility study off, and that will be able to allow us to change the base parameters we use in 2020 to take him into 2025 because as we all pretty well aware, the metal prices used in 2020 was $3.15 a pound. And the current long term metal prices used for copper is $4.25. And I believe I'm not wrong. I think 25¢ increase in pound price of a pound of copper actually added about $90,000,000 to the discounted after tax valuation. So clearly, we'd like to update the valuation of the project.
And just in terms of mechanics of ISR mining, I mean, there are a lot of projects in North America, especially on the uranium side, which utilizes ISR for extraction. Are there any projects using ISR for copper that you know of right now, or is Florence potentially the first one?
I believe in the current way they're doing ISR, probably Florence is probably the first one in Arizona that's been moving to production. Back in the late sixties and the 1970s, there were various methods where the mining companies were trying to recover copper without actually mining it, and it's like using heat bleach. But this is the first using the current technology, and the amount of work that's been done in ISCR projects in Arizona. And the understanding of them now by various engineering firms really could be is gonna be very beneficial to Copper Fox as we continue to work on moving the Van Dyke project
IMHO - More successful ISR project should help interest in the Van Dyke deposit
Project Team has been assembled to come up with Execution Plan for a PFS. Saying we have assembled a project team. And the purpose of doing that was to put together what they call an execution plan. That plan is to set out this the number of studies, the scale of the studies, the timeline, estimated cost to complete the studies so that we could get to a point in time where we could write a preliminary feasibility stage level report. The reason I wanna do it that way is because I want to have a pretty good idea of what we're walking into before we do it.
And the rationale for doing this is the 2020 PEA clearly indicated that the project had robust economics, and potential to substantially increase mine life through exploration.
Timelines - I think that decision first, we gotta get the execution plan, completed, and I that's in the works now. There is a timeline for delivery, and, my experience with engineering firms in the last couple of years about providing timelines, It's not worked out too well. (Me – we know that too well) They're usually a little bit later. So I am anticipating it fairly quickly. Once I receive it, then the board will have the opportunity to review it, sit down, and coming out of that, we should make a decision.
If I had to put a timeline to that, probably I would give you a two to three month timeline before that decision is made. More than likely two, but could take a little bit longer because it's the summertime. So that's would be probably the biggest catalyst coming out of the Van Dyke project.
Schaft Creek
Overview of the Shaft Creek project. You know, this is a billion plus resource copper resource deposits. JV with Teck, which is one of the much bigger mining companies out there, so not a bad partner to work with. Is nearing the PFS stage as well.
We actually completed Copper Fox, when I came onboard in 02/2009, the focus then was to complete the feasibility study at Shaft Creek. Two reasons: 1) was because the previous management had completed a preliminary feasibility study and evaluation. But the big driver for me was to do a pre feasibility study, which would then cause Teck to make a decision as to whether they were gonna exercise their back end right. Because when they originally optioned the property, they retained the back end right, which could be up to 75%.
And so the question was, is Teck gonna own 75%, or are they gonna have no interest in the property at all? Kinda hard to make plans when you're not sure what who how the interest is gonna lay out. So what we did, we did that, and within a few minutes of Teck receiving the study, they told us they're coming in for 75 percent. We negotiated the joint venture, and it's a very unique joint venture, and it's actually quite a good joint venture for a junior company. Essentially, Copper Fox is not required to put any cash. Into the JV up until production starts. Now that is so what that tells me is that we can't get diluted out. It doesn't matter what happens, can't get diluted out. And the only way Teck can recover the funds from the from anything they put up on behalf of Copper Fox they have to get that out of the funds out of coming from the project, I e, the free cash flow coming from the project, and the joint venture is structured specifically that way. Now Shaft Creek sits on one of the largest undeveloped porphyry copper systems in North America.
It's a four metal system. It's copper, molybdenum, gold, and silver, and all of which are recoverable and sold in concentrates, so copper concentrate and a molybdenum concentrate. And they're both very clean copper concentrates, very much what the current smelters would be looking for in today's market. Teck has taken the project from a over the last few years, and they the most recent study that was completed in 2021, the after tax valuation using, I believe, 8% discount rate and a 28% contingency on top of it. It shows that you have a low capital intensity, but the value is $842,000,000 using $3.25 a pound copper, a very conservative gold price and molybdenum price and silver price compared to where the long term metal prices are today.
Teck has been moving the project slowly along. (Me: I think we would agree with the slowly part) And in the last few years, they've been focusing on very project specific critical parameters that would help them move that project into the preliminary feasibility stage, being geometallurgical, geotechnical, the environmental aspects of it, the archeological aspects, and most importantly, working with the First Nations in and around the Shaft Creek area to, you know, to gain social support for the project. So they are planning and we have announced that the plan for 2025 is to try and transition the Shaft Creek project into the preliminary feasibility stage, and I hope that that decision will be made toward the end of 2025.
So just to emphasize I believe since you partnered up with Teck or formulated that 75/25 JV, I could spend nearly 100,000,000 in drilling on the property, and helping out put together the PEA. And I guess this will all culminate with a potential PFS decision towards the end of end of this year. That's correct. About right?
Yes. Teck have incurred to the end of 2024 approximately $98,000,000 of expenditures, of which $74 Million was spent on expiration expenditures on the ground and doing studies and various surveys and things like that. And then including that they gave us a $20,000,000 cash payment, at the time they signed the joint venture. So collectively, they're got a $24,000,000 cash payment.
So they're about $98,000,000 spent to date. We got a fifth $15,800,000 budget targeted for 2025. Again, targeting two critical areas, the waste dump, the waste storage facility, the 10 new storage facility, and with only with the data that comes out of that, they'll be comfortable enough to make a decision to transfer the project toward the into the preliminary feasibility stage.
Eaglehead
An advanced stage exploration stage project in Northern British Columbia. It is a copper, gold, moly, silver system. There we printed a current 43101 resource on that in August 2023. We like it. We like the size of the target. We like the anomaly. We think it's got potential to grow substantially.
Third in the queue in terms of near term development - it obviously, it would be Eaglehead because we already have a resource there of approximately 340,000,000 tons. The project just got a really good NSR based on the resource estimate. And clearly there are four zones of mineralization. They're all open ended along strike, across strike, and at depth. We believe we are sitting at the very upper edges of the porphyry system.
And from a technical standpoint, to be able to move that to the preliminary feasibility stage, I believe that could be done with some more drilling. Not a lot. Very strategically located drill holes will help you get there quicker. And metallurgical test work to understand the variability across the thing because it's quite important to understand that. That's the one that could go fastest.
Mineral Mountain
Exploration stage projects
One is Mineral Mountain, which is we're hopefully at the final stages of permitting it for drilling it for the first time the project has ever been drilled as far as we can tell. And we're working hard to take this Riverview project, which is in the Copper Creek Mining District to the drill ready stage and then file a plan of operation.
But the exciting one is probably gonna be the Mineral Mountain because we've been in the permitting process now for about fifteen months, believe it or not, to get a to get a permit to drill four holes, and we were exceptionally careful where we spotted the holes. But that could lead to a discovery of a of a fairly significant leramide porphyry copper deposit. I'm not saying it will, but it could be just based on the size of the copper footprint on surface and the geophysics.
Timelines - And then the other thing is clearly we the next catalyst would be once we get the permit for drilling from the government, we're in the we're in the bond acclimation stage right now, which should lead to the final permit with any conditions, if any, attached. And once we get that, then the plan would be to go to drilling immediately.
Me: Does anybody have any idea what good drilling results would look like? How would know when they are published?
Sombrero Butte - Arizona, USA - Cu/Mo
We have a much better understanding. And the work we did in 2024 and early 2025 has substantially upgraded our appreciation for the porphyry potential of the Sombrero Butteproperty. So, yeah, three very exciting projects, all of which could provide some very significant news to the company.
And then following up, we're still working on some Sombrero Butte. It has a very large chargeability signature with it.
So potentially, we have news coming out from all five projects over the next, I guess, six months.