Skip to content
Sign in

Post

Copper Fox Metals Inc.

The post this replies to is no longer available.

VEEP3.2 rating from 221 members26.7K ptsRate

From the Office

Despite Teck's years and years of squawking about Galore with nary a word on Schaft Creek, what I see about Galore compared to Schaft Creek is:

Galore has higher CU and AU grades but is in extremely difficult to access, high-altitude and steep terrain.
Galore's weather up there is brutal in the winter, in stark contrast to the weather in SC's protected valley
Galore has no room for milling operations anywhere nearby which represents a major operational complexity.
Galore requires 3 separate kms-long tunnels through a mountain to access the site 
Galore started boring the first tunnel in 2010 and gave-up after one or two weeks iirc, with next to no progress.
Galore's capex at each updated report keeps climbing more steeply than its terrain.
Galore's capital cost intensity is double that of Schaft Creek's
Galore is several years overdue on a PFS promised to Newount.  Teck doesn't even give an ETA on it now. 
Galore is way further down-stream on the Stikine so has potential to be more environmentally damaging

That's why I think, certainly compared to Schaft Creek, why Galore Creek is a project worthy of the description of  "Pie in the Sky"



JMHO

Join the conversation about Copper Fox Metals Inc.

Reply