Skip to content
Sign in

Post

Copper Fox Metals Inc.

Treasurer2.9 rating from 110 members5.8K ptsRate

ChatGBT Rabbit Hole

So....I was bored last night and went down into this AI rabbit hole in figuring out our value.  I'm slowly digesting it but want to share to see what everyone's thoughts are on it.


Question: How much do you think Anglo teck will pay to buyout copper fox metals 25% interest in schaft creek?


If Anglo Teck ultimately decides it wants 100% of Schaft Creek, I think a reasonable buyout range for Copper Fox Metals’s 25% interest would be roughly C$400–700 million, with ~C$500–550 million as my current best estimate.

The key point is that I would not simply take 25% of the old 2021 PEA NPV. That PEA used only US$3.25/lb copper and produced an after-tax NPV8 of US$842 million for 100% of Schaft Creek. Copper Fox's own sensitivity table showed NPV rising to US$1.08 billion at only US$3.50 copper. (Copper Fox Metals) Copper prices and the strategic value of large, long-life copper deposits have changed considerably since that study.

There are also unusually valuable terms attached to Copper Fox's stake. Copper Fox owns 25%, while Teck owns 75% and operates the project. Teck funds Copper Fox's share of development under the JV structure, including financing Copper Fox's share of construction costs without dilution; Copper Fox also retains milestone-payment rights. (Copper Fox Metals) That makes the 25% interest more valuable than a normal minority interest where the junior has to independently raise billions to maintain its stake.

My rough valuation would look like this:

ScenarioBuyout of CUU's 25%
Low / early transactionC$250–350M
Reasonable negotiated dealC$400–550M
Strong PFS + Anglo Teck wants 100%C$550–700M
Excellent economics / competitive pressureC$700M+

And timing matters enormously. The 2026 Schaft Creek program is specifically addressing the work needed to move toward pre-feasibility, with another C$9.1 million planned. (Copper Fox Metals) If Anglo Teck waits until a PFS demonstrates materially improved economics, Copper Fox's negotiating position becomes considerably stronger.

If I had to put one number on it today: ~C$525 million.

That's for Copper Fox's Schaft Creek interest, not necessarily the exact takeover price for all of Copper Fox Metals. A corporate acquisition would also have to account for Copper Fox's other assets and liabilities.

If you want, I can go one step further and calculate what C$300M, C$500M, C$700M and C$1B takeover prices would equal per CUU share and which one I think Anglo Teck could realistically justify.

Continue exploring:

  • Calculate CUU share values at C$300M–C$1B

  • Estimate Anglo Teck’s justifiable maximum

______________________

Continuation on the chat: Estimate the maximum price Anglo Teck could reasonably justify for Copper Fox’s 25% Schaft Creek interest by modeling project value, development funding, milestone rights, and strategic control value.


Yes. I’d value this differently from a simple “25% × project NPV” calculation because Copper Fox’s interest has unusually favourable financing protections.

Based on the latest information available through August 2026, I think Anglo Teck could economically justify paying roughly C$800 million–C$1.0 billion for Copper Fox’s 25% Schaft Creek interest, with approximately C$900 million being my estimate of the upper end of a reasonable negotiated transaction. Getting much above C$1.1–1.2 billion would require Anglo Teck to underwrite substantially stronger PFS economics, higher long-term metal prices, resource expansion, or major strategic synergies.

1. Start with an updated Schaft Creek NPV

The 2021 PEA is badly dated for valuation purposes. It produced an after-tax NPV8 of US$842M, but assumed just US$3.25/lb copper, US$1,500 gold and US$10 molybdenum. Initial capital was US$2.65B and the mine produced about 5.0 billion lb copper plus substantial gold, molybdenum and silver over 21 years. (Copper Fox Metals)

Copper Fox gives some very useful sensitivities:

  • +US$0.25/lb Cu ≈ +US$250M NPV

  • +US$100/oz Au ≈ +US$89M NPV

  • +US$1/lb Mo ≈ +US$58M NPV (Copper Fox Metals)

So let's use a reasonably bullish-but-defensible long-term case:

Cu = US$4.00/lb
Au = US$2,000/oz
Mo = US$20/lb

Starting NPV:

US$842M

Copper adjustment:

$0.75 ÷ $0.25 × $250M = +$750M

Gold adjustment:

$500 ÷ $100 × $89M = +$445M

Moly adjustment:

$10 × $58M = +$580M

That gives approximately:

US$2.62 billion NPV8

before considering interactions among metal prices, updated capital costs, taxation and any PFS design changes. So I would round that down somewhat rather than pretend the sensitivities are perfectly additive.

My normalized project value

I'd use approximately:

US$2.3–2.6B after-tax NPV8

or roughly C$3.1–3.5B at ~C$1.35/US$.

Copper Fox's straight 25% share would therefore be:

C$775–875M.

That's already substantially higher than the C$200–300M implied by simply taking 25% of the old PEA.


2. But Copper Fox's 25% isn't an ordinary minority stake

This is the part I think the market tends to underestimate.

As of December 2025, roughly C$90M of pre-production costs had been incurred, of which the first C$60M was entirely Teck's responsibility. Copper Fox's share of the excess was approximately C$7.5M. (Copper Fox Metals)

More importantly, Copper Fox doesn't have to raise billions of dollars to maintain its 25%.

After a production decision, Teck must use reasonable commercial efforts to arrange project financing for at least 60% of construction capital, or whatever amount is commercially available. Teck must then offer to loan Copper Fox its share of capital not covered by project financing at prime + 2%, without dilution. (Copper Fox Metals)

That's extremely valuable.

Imagine updated construction capital eventually comes out around C$5 billion.

Copper Fox's nominal 25% share:

C$1.25B

But Copper Fox doesn't need C$1.25B sitting on its balance sheet.

Anglo Teck effectively provides the financing mechanism.

That means CUU shareholders retain the upside of a 25% ownership interest while avoiding the existential financing/dilution problem that normally destroys a junior miner's economics.

I would assign roughly C$75–150M of incremental transaction value to this financing structure relative to an ordinary unfunded 25% minority interest.


3. Remaining milestone payments

There were originally three C$20M payments.

The first C$20M was received.

The other two are associated with sanction and completion of construction, but Copper Fox's share of pre-production expenditures above C$60M reduces those payments. As of year-end 2025, about C$7.5M had accumulated against them. (Copper Fox Metals)

So the current theoretical remaining amount is approximately:

C$40M − C$7.5M = C$32.5M

before additional 2026+ offsets.

These shouldn't simply be added at face value because additional pre-production spending will reduce them.

I'd give them perhaps:

C$10–25M present transaction value.


4. Strategic-control premium

This is where Anglo Teck has a reason to pay more than financial NPV.

Anglo Teck already controls 75%.

Buying CUU's 25% gives it:

100% ownership.

That eliminates the minority JV partner permanently.

It means Anglo Teck could restructure financing, sell a project interest, bring in another major/mining partner, stream metals, alter development plans or package Schaft Creek strategically without having Copper Fox sitting beside it with a permanent 25%.

And something important changed recently.

As part of the Canadian approval of the Anglo American/Teck combination, Anglo Teck committed to advance Galore Creek and Schaft Creek, with up to C$750M of capital expenditures associated with advancing those projects. (Anglo American)

That significantly increases the strategic relevance of Schaft Creek.

The project is no longer just another dormant Teck option.

Furthermore, the 2026 program is specifically doing the work needed to determine readiness to transition toward PFS. (Copper Fox Metals)

I'd therefore assign a 10–20% strategic/control premium to the underlying economic value of CUU's interest.

If the underlying 25% is worth C$800M:

10% = C$80M
20% = C$160M


My Anglo Teck maximum-price model

ComponentEstimated value
25% of normalized Schaft Creek NPVC$775–875M
Value of financing/carried structure+C$75–150M
Remaining milestone rights+C$10–25M
100% ownership/control value+C$80–160M
Gross strategic valueC$940M–C$1.21B

But I wouldn't expect Anglo Teck to hand all of that value to Copper Fox.

A buyer needs some acquisition accretion for itself.

Consequently, my actual negotiating range would be:

C$700–800M

A very attractive acquisition for Anglo Teck.

C$800–900M

A fair price if Anglo Teck has increasing confidence that Schaft Creek will eventually be built.

~C$900M–C$1.0B

Maximum price I think Anglo Teck could reasonably justify today.

C$1.1B+

Possible, but I'd have difficulty justifying it today without a PFS demonstrating materially better economics than the 2021 PEA.


One enormous wildcard: the PFS

This is why I think Copper Fox has considerable incentive not to sell cheaply before PFS.

Only around 60% of the current resource was incorporated into the 2021 PEA mine plan. Schaft Creek has approximately 1.35 billion tonnes M&I containing about 7.76 billion lb copper, 6.97Moz gold and 511Mlb molybdenum, plus another 344Mt inferred. (Copper Fox Metals)

The JV has spent years investigating metallurgy, strip ratio, infrastructure, mine-plan alternatives and other improvements. (Copper Fox Metals)

If a future PFS produces something like:

After-tax NPV8 = US$3.0–3.5B

then 25% alone becomes approximately:

US$750–875M = ~C$1.0–1.18B.

At that point, a strategic/control premium could push a rational buyout toward:

C$1.1–1.3 billion

That is where I see the realistic eventual ceiling if the upcoming work substantially de-risks Schaft Creek.

So my numbers have moved upward from the C$500M area we discussed earlier:

Today: ~C$800–900M fair value

Maximum Anglo Teck could justify today: ~C$1.0B

After a strong PFS: ~C$1.1–1.3B could become defensible

And I would distinguish that from buying Copper Fox Metals itself, because CUU also owns Van Dyke and its other assets. A full-company takeover should theoretically command more than the Schaft Creek number alone.

If you want, I can next model the C$1 billion Schaft Creek buyout into an actual CUU takeover price per share, including CUU's current share count, Van Dyke value, other assets, cash and a takeover premium.

Continue exploring:

  • Model C$1B as a CUU takeover price

  • Stress-test the C$1B maximum

________________________

Continuing 

Model a C$1 billion buyout of Copper Fox’s 25% Schaft Creek interest into an actual CUU takeover price per share, including the current share count, Van Dyke value, other assets, cash, and a takeover premium.



Using ~590.5M shares, I'd... Need calc scenarios. Van Dyke value: don't add full NPV; acquisition value risk-adjusted perhaps 35-50% = C$300-440m assuming USD/CAD 1.37. Other 50-100m, cash ~2.7m from July less spend maybe 2m. Takeover premium? If asset NAV already sums values, "premium" shouldn't add 20% mechanically maybe corporate control premium to non-SC assets. User asks including premium. Model $1b Schaft + Van 350 + other 75 + cash 2 =1427; 10% whole company premium = 143m => 1.57b /590.5=2.66. But if $1b itself is negotiated buyout for SC and company takeover includes rest, premium perhaps 10-15%. Range.

Need cite share derivation. July PP 4.286m after AGM 586.2 maybe exact financial statement shares outstanding Apr 30? Search result can open/find. Could derive 581.6 + 4.615 + 4.286 =590.501. February 581.6, April financing 4.615, July 4.286. cite. Cash July gross financing 2.57 plus June cash 145k => ~2.7 before expenses/spend. Good.

Takeover price per share. Also premium relative current price maybe search current quote? User asks takeover premium perhaps transaction premium. Current share price fresh requires slow recency. Search.

__________________


Continuing:

Stress-test the C$1 billion maximum price for Copper Fox’s 25% Schaft Creek interest under lower copper, gold, and molybdenum prices, higher capital costs, and a delayed PFS.




Yes. After stress-testing it, I would not call C$1.0 billion a defensible “base-case” price today. I would call it the upper end of what Anglo Teck could justify if it has substantially more confidence in Schaft Creek than the public currently has.

The biggest risks to the C$1B thesis are capital-cost escalation and timing, rather than copper alone.

The starting point is the 2021 PEA: US$842M after-tax NPV8, 12.9% IRR and US$2.653B initial capex at US$3.25 Cu, US$1,500 Au and US$10 Mo. Importantly, that capital estimate is in constant 2021 dollars, based largely on Q4 2020 pricing, and is only a Class 5 estimate with ±30% accuracy. (Copper Fox Metals)

Copper Fox's published sensitivities give us a useful way to stress it. Roughly, every US$0.25/lb increase in copper adds about US$240M to after-tax NPV; US$100/oz of gold adds about US$80M; and US$1/lb of molybdenum adds about US$40M. (MarketScreener)

My stress test

These are my modeled estimates, not Copper Fox guidance. I apply the published metal sensitivities approximately, then haircut NPV for capex escalation and discount it further for PFS delay.

ScenarioCuAuMoCapex vs. 2021PFS delayEst. project NPV8CUU 25% economic value*Rational buyout range
Strong$4.25$2,200$20+10%None~US$2.55B~C$875MC$950M–1.10B
Moderate$4.00$2,000$18+15%1 yr~US$1.84B~C$630MC$775–900M
Bearish$3.75$1,800$15+20%2 yrs~US$1.17B~C$400MC$525–675M
Severe$3.50$1,700$12+30%3 yrs~US$0.58B~C$200MC$300–400M

*Approximate conversion at C$1.37/US$ before adding strategic/control value.

So the C$1B number survives—but only in the upper scenarios.

Why capex is the biggest problem

This deserves more attention than it usually gets.

The 2021 initial capex was:

US$2.653B / C$3.447B. (Copper Fox Metals)

But that was based on Q4 2020 costs.

A 20% escalation would put it around:

US$3.18B

A 30% escalation:

US$3.45B

And the old estimate itself carries ±30% accuracy.

That's precisely why the current work matters. The 2026 C$9.1M program is examining geology, metallurgy, tailings/waste management, mine-plan alternatives, infrastructure, road alternatives and power requirements before deciding whether Schaft Creek is ready to enter PFS. (Copper Fox Metals)

In other words, we don't yet know what the PFS capital number will be.

If Anglo Teck internally thinks the optimized project can still be built for roughly US$3.0B, C$1B for CUU becomes much easier to justify.

If it sees US$4B+ coming, the calculation changes dramatically.

Copper price matters enormously

The published PEA illustrates this beautifully.

At otherwise unchanged assumptions:

US$2.75 Cu → US$360M NPV
US$3.00 → US$600M
US$3.25 → US$840M
US$3.50 → US$1.08B
US$3.75 → US$1.32B

So every US$0.25/lb is worth roughly US$240M of project NPV. (MarketScreener)

That means moving from $3.75 long-term copper to $4.25 is worth roughly another:

US$480M NPV

And $3.75 → $4.50 is approximately:

+US$720M.

That's why Anglo Teck's internal long-term copper assumption is probably one of the most important unknowns in valuing CUU.


Gold provides a surprisingly large cushion

Schaft Creek isn't simply a copper mine.

The PEA's revenue distribution was approximately:

Copper 66.6%
Gold 22.7%
Molybdenum 9.3%
Silver 1.3%.
(Copper Fox Metals)

And the PEA sensitivity showed:

$1,300 gold → ~US$690M NPV
$1,500 → ~US$840M
$1,700 → ~US$1.00B. (Copper Fox Metals)

Therefore even if I deliberately use only US$2,000 gold, I'm already US$500 above the PEA assumption.

That's worth approximately:

+US$400M of project NPV.

So weaker copper can be partially offset by stronger gold.


Molybdenum helps too

The published sensitivity was approximately:

$8 Mo → US$760M NPV
$10 → US$840M
$12 → US$920M. (Copper Fox Metals)

Approximately:

US$40M NPV per $1/lb Mo.

So even my bearish US$15 assumption adds roughly US$200M relative to the old PEA.

That is meaningful.


The Copper Fox financing terms save the C$1B argument

This remains the strongest part of the CUU investment thesis.

If Copper Fox had to independently fund 25% of a C$5B–6B mine, I would dramatically reduce my valuation.

It doesn't.

The JV provides that Teck will use reasonable commercial efforts to arrange project financing for at least 60% of project capital, and can loan Copper Fox its share of capital not covered by project financing at Prime + 2%, without dilution of CUU's 25% interest. (Copper Fox Metals)

And the structure goes even further: Teck funds CUU's share of capital, then capital costs are recovered from 90% of free cash flow, while the remaining 10% is distributed 75/25. (Copper Fox Metals)

That is a valuable financing option.

So I wouldn't apply the normal huge minority/development-stage discount to CUU's 25%.


But a delayed PFS hurts

There's another subtle issue.

Copper Fox describes the 2026 program as determining whether the project is ready to transition to PFS, rather than saying a PFS is definitely being completed in 2026. (Copper Fox Metals)

That's important.

At an 8% discount rate:

1-year delay: value × 0.926
2-year delay: × 0.857
3-year delay: × 0.794
5-year delay: × 0.681

A three-year delay therefore destroys roughly 21% of present value, even if absolutely nothing else goes wrong.

And strategically, it reduces Anglo Teck's urgency to acquire the minority interest.


So does C$1 billion survive?

Here's where I land after stressing it.

C$500–650M

This is the range I would expect if Anglo Teck is internally using something around $3.50–3.75 long-term copper, sees meaningful capex inflation and believes PFS is still several years away.

I would consider a C$1B purchase difficult to defend under those assumptions.

C$750–900M

This is now my most defensible range under reasonably conservative assumptions:

~US$4.00 Cu
~US$2,000 Au
~US$18 Mo
15–20% capital escalation
PFS within roughly 1–2 years.

The financing terms and value of obtaining 100% ownership justify paying somewhat above CUU's pure pro-rata NPV.

C$1.0B

This is defensible but aggressive.

I'd want Anglo Teck to believe something approximately like:

US$4.25+ long-term Cu
US$2,000–2,200+ Au
US$18–20+ Mo
Capex escalation ≤10–15%
PFS relatively soon
No major metallurgical/infrastructure surprise

Under those circumstances, CUU's raw 25% economic interest gets close enough to C$800–900M that another C$100–200M for financing rights, elimination of the minority partner and complete strategic control makes C$1B rational.

C$1.2B+

I wouldn't defend this today.

I'd need to see the PFS—or compelling internal results pointing toward a much larger NPV.


One thing that makes me more comfortable with C$1B

Only about 60% of the identified resource went into the 2021 PEA mine plan. That mine plan still produced approximately 5.0 billion pounds copper, 3.7Moz gold and 226Mlb molybdenum over 21 years. (Copper Fox Metals)

The 2021 M&I resource contains approximately 7.76Blb copper, 6.97Moz gold and 511Mlb molybdenum, plus another 344Mt inferred. (Copper Fox Metals)

So Anglo Teck isn't necessarily purchasing just the 21-year PEA cash flow.

It's purchasing 25% of the entire Schaft Creek asset.

That optionality matters considerably to a major miner capable of owning it for 30–50 years.

My revised probability-weighted conclusion

If I were sitting on Anglo Teck's investment committee today, my internal ceiling would probably be around:

C$850–950 million

I'd seek to acquire it around C$650–800M.

I'd authorize going toward C$1.0B if internal 2025/26 engineering work was telling me that the PFS will materially improve the project and I genuinely intended to develop Schaft Creek.

And I would walk away rather than pay C$1B if the emerging capital estimate were moving toward US$4B+, the PFS were slipping several years, and my long-term copper assumption were below ~$4/lb.

So C$1B isn't crazy—but the stress test shows that it's a strategic ceiling, not conservative fair value.

The really interesting next calculation is the reverse one: what PFS NPV and IRR would Schaft Creek have to produce for Anglo Teck to comfortably pay C$1B for CUU's 25% and still earn an attractive return on the acquisition? That would tell us exactly what 2026/27 technical results CUU shareholders should be watching for.

Continue exploring:

  • Calculate the PFS NPV needed for a C$1B buyout

__________________

Continuing:

Calculate what C$300 million, C$500 million, C$700 million, and C$1 billion buyout prices for Copper Fox’s Schaft Creek interest would equal per CUU share, using the current share count and clearly stating the assumptions.

Using Copper Fox’s latest disclosed share count plus the July 28, 2026 financing, the calculation is straightforward.

Copper Fox reported 586,249,986 shares outstanding as of June 25, 2026. (Copper Fox Metals) On July 28 it issued another 4,286,000 shares at C$0.60, raising C$2.572 million. (Copper Fox Metals)

That gives an estimated current basic share count of:

586,249,986 + 4,286,000 = 590,535,986 shares

Schaft Creek buyout value per CUU share

Cash paid for CUU's 25% Schaft Creek interestValue per CUU share
C$300 millionC$0.51/share
C$500 millionC$0.85/share
C$700 millionC$1.19/share
C$1.0 billionC$1.69/share

The math for the C$1B case, for example, is:

C$1,000,000,000 ÷ 590,535,986 = C$1.693/share

Important assumption

Those numbers assume the entire buyout consideration ultimately belongs to CUU shareholders and simply divide the Schaft Creek sale value by current basic shares. They do not assign any value to Copper Fox's other assets.

That's important because after selling Schaft Creek, CUU would still own 100% of Van Dyke, Eaglehead, Mineral Mountain and Sombrero Butte. Copper Fox confirms those holdings, with Van Dyke being the most advanced of the wholly owned projects. (Copper Fox Metals)

So a C$1B Schaft Creek transaction does not necessarily mean CUU is worth only C$1.69/share.

For example, if we eventually assigned the remaining company a hypothetical:

C$200M value → +C$0.34/share

C$300M → +C$0.51/share

C$400M → +C$0.68/share

Then a C$1B Schaft Creek deal could imply total underlying value around C$2.03–C$2.37/share, before considering transaction structure, taxes, liabilities, future dilution, or any premium/discount investors apply to the remaining company.

One other positive: Copper Fox says Schaft Creek pre-production costs are fully carried by Teck, so the July financing proceeds are intended for CUU's wholly owned projects rather than funding its 25% share of Schaft Creek work. (Copper Fox Metals)

My key number: if Anglo Teck paid C$1 billion cash specifically for CUU's 25% Schaft Creek interest, that's approximately C$1.69 per current CUU share from Schaft Creek alone.

The more interesting calculation is a full Anglo Teck takeover of Copper Fox: C$1B for Schaft Creek + a risk-adjusted Van Dyke valuation + Eaglehead/Mineral Mountain/Sombrero Butte + cash. That could produce a materially higher takeover price than C$1.69.

Continue exploring:

  • Value CUU’s remaining assets after a C$1B Schaft Creek sale

________________

Continuing:

Estimate Copper Fox’s post-sale value per share after a C$1 billion Schaft Creek transaction by valuing Van Dyke, Eaglehead, Mineral Mountain, Sombrero Butte, and cash, while accounting for taxes, liabilities, and future dilution.


Yes. If Anglo Teck paid C$1.0 billion cash for Copper Fox’s 25% Schaft Creek interest, I estimate the remaining/post-sale Copper Fox could reasonably be worth about C$0.50–0.70 per share, in addition to whatever net Schaft Creek cash remains after tax. My midpoint is roughly C$0.59/share for the residual assets themselves.

The important wrinkle is tax: a C$1B sale does not necessarily leave C$1B of cash in Copper Fox. The exact tax outcome would depend heavily on whether Anglo Teck buys the partnership/JV interest, underlying assets, or Copper Fox itself, and on Copper Fox’s tax basis and resource pools. Canadian rules can treat dispositions of partnership interests differently depending on the nature of the partnership's assets, so I would not assume a simple capital-gains rate. (Canada)

My base-case post-sale NAV

I'm using approximately 590.54M basic CUU shares, incorporating the 4.286M shares issued July 28 at C$0.60 for C$2.572M. (Copper Fox Metals)

ComponentMy value
Van DykeC$300M
EagleheadC$35M
Mineral MountainC$15M
Sombrero ButteC$8M
Cash/investments excluding Schaft proceeds~C$3M
Other liabilities/closure obligations−C$1M
Residual NAV~C$360M
÷ 590.54M shares~C$0.61/share

I would then allow for some future dilution/exploration spending, bringing my practical residual value to approximately:

C$0.55–0.60 per CUU share

Here's how I get there.

Van Dyke: C$250–350M

Van Dyke is by far the most valuable asset remaining.

The existing 2020 PEA produced an after-tax NPV7.5 of US$644.7M, 43.4% IRR and 2.1-year payback at only US$3.15/lb copper. It envisioned 1.1 billion pounds of production over 17 years with US$290.5M initial capital. (Copper Fox Metals)

Even more interestingly, Copper Fox says every US$0.25/lb increase in copper adds approximately US$90M to after-tax NPV. (Copper Fox Metals)

And Copper Fox is currently preparing an updated 2026 PEA using US$4.40/lb copper, incorporating an updated resource estimate and work completed since 2020. (Copper Fox Metals)

If you mechanically applied the old sensitivity:

US$4.40 − US$3.15 = US$1.25

5 × US$90M = +US$450M

That could theoretically push an updated Van Dyke NPV toward:

~US$1.1B

before considering changed capex, operating costs, resource changes and updated engineering.

I absolutely would not value Van Dyke at C$1.5B today, though. It's still PEA-stage, ISCR carries technical/permitting/execution risk, and substantial development capital remains.

I'd use approximately 20–25% of a prospective ~C$1.3–1.5B project NPV as a risk-adjusted corporate valuation:

C$250–350M

Midpoint:

C$300M = C$0.51/share

That one asset could therefore be worth roughly fifty cents per CUU share after Schaft Creek disappears.


Eaglehead: C$25–50M

I'd give Eaglehead considerably more value than the other exploration properties because it already has a mineral resource.

Copper Fox describes Eaglehead as having moved into the resource-expansion stage. The four known deposits remain open, and the 2025 geophysical program identified an open-ended chargeability anomaly roughly 2.8 km × 2.4 km, suggesting potentially significant expansion beyond the existing resource. (Copper Fox Metals)

But there's no PEA yet.

So rather than trying to manufacture an NPV, I'd assign:

C$25–50M

Base case:

C$35M = ~C$0.06/share


Mineral Mountain: C$10–25M

This one has become more interesting.

Copper Fox reported in June that its maiden drilling program had confirmed the discovery of a large Laramide-age porphyry copper system, and it added claims covering potential extensions. (Copper Fox Metals)

But it's still discovery-stage.

I'd therefore use:

C$10–25M

Base:

C$15M = ~C$0.025/share

There's considerable upside if follow-up drilling establishes a meaningful resource, but I wouldn't pay for that success today.


Sombrero Butte: C$5–15M

Sombrero Butte remains essentially exploration optionality.

Copper Fox describes it as a drill-ready porphyry project in an established Arizona copper district, but unlike Van Dyke and Eaglehead it doesn't yet have the economic/resource definition necessary for a large valuation. (Copper Fox Metals)

I'd use:

C$5–15M

Base:

C$8M = ~C$0.014/share


Cash and liabilities

At April 30, Copper Fox reported approximately C$630K cash, C$88.9M total assets and only about C$967K total liabilities, including approximately C$421K of decommissioning liabilities. (Copper Fox Metals)

Then in July it raised another C$2.572M with no finder's fees. (Copper Fox Metals)

I wouldn't simply say cash is C$3.2M because Copper Fox continues spending money on Van Dyke and exploration. It spent approximately C$2.89M on project development/exploration during the first six months of fiscal 2026. (Copper Fox Metals)

So for valuation purposes I'd roughly net:

Cash/investments: +C$3M

against

corporate/closure/other liabilities: −C$1M

Net effect is basically negligible at about C$0.003/share.


Now add the C$1 billion Schaft Creek sale

This is where things get interesting.

The gross proceeds equal:

C$1.0B ÷ 590.536M = C$1.69/share

But taxes have to be considered.

Because we don't know the eventual transaction structure or Copper Fox's applicable tax basis at the time of sale, I'd model three tax outcomes rather than pretending we can know the exact bill today.

Tax/transaction leakage on C$1BNet Schaft cashSchaft value/shareResidual assets*Total NAV/share
10%C$900MC$1.52~C$0.59C$2.11
20%C$800MC$1.35~C$0.59C$1.95
25%C$750MC$1.27~C$0.59C$1.86
30%C$700MC$1.19~C$0.59C$1.78

*My risk-adjusted estimate for Van Dyke + Eaglehead + Mineral Mountain + Sombrero Butte + other net assets before additional dilution.

I think the 20–25% leakage cases are useful conservative modeling assumptions, but they are not predictions of the actual tax bill.


Future dilution

This is one place where a Schaft Creek sale fundamentally changes CUU.

Today Copper Fox has to continually finance Van Dyke and its exploration portfolio. In 2026 alone it has raised more than C$5.5M, including the July placement. (Copper Fox Metals)

If Copper Fox suddenly had C$700–900M of cash from Schaft Creek, equity dilution should essentially cease being necessary.

But let's deliberately assume another 5% dilution before/around the transaction.

590.5M shares × 1.05 =

~620M fully adjusted shares

Under my 20% tax case:

C$800M Schaft cash

  • C$300M Van Dyke

  • C$35M Eaglehead

  • C$15M Mineral Mountain

  • C$8M Sombrero Butte

  • ~C$2M other net assets

=

C$1.160B NAV

÷ 620M shares

=

C$1.87/share

With 10% dilution:

~650M shares →

C$1.78/share

So even fairly substantial dilution doesn't destroy the thesis.


My probability range

I'd think about the post-C$1B-sale company like this:

Conservative:
Heavy tax leakage + Van Dyke C$200M + modest exploration values + 10% dilution
→ ~C$1.50–1.65/share

Base case:
~20% transaction/tax reserve + Van Dyke C$300M + C$58M other projects + ~5% dilution
→ ~C$1.85–1.90/share

Bull case:
Tax-efficient transaction + Van Dyke C$400M+ after a strong 2026 PEA + higher exploration values + little dilution
→ ~C$2.20–2.40/share

My number: about C$1.85–1.90 per share

That's what I would use today as a risk-adjusted post-sale NAV if Anglo Teck handed Copper Fox C$1 billion for Schaft Creek.

And there's an important distinction: only about C$1.25–1.50/share of that would be Schaft Creek sale proceeds after assumed taxes/leakage. Roughly another C$0.50–0.65/share could remain in Van Dyke and the exploration portfolio.

That makes a C$1B Schaft transaction potentially much more valuable to CUU shareholders than simply saying “C$1B ÷ shares = C$1.69.”

The biggest catalyst for changing this estimate is actually the 2026 Van Dyke PEA. Copper Fox is updating the study at US$4.40 copper and updating the resource. (Copper Fox Metals) If that study produces an after-tax NPV around US$1B or higher while maintaining a strong IRR, I could see my risk-adjusted Van Dyke value moving from ~C$300M toward C$400–500M, which alone would add roughly another C$0.17–0.34 per CUU share to this model.

I can monitor the Van Dyke PEA and recalculate this valuation when Copper Fox releases it.



Sorry it's a bit of long read but I do find that if AT does go ahead with the PFS, it'll continue to add value to our share.

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. Big Unknown.  3rd party comes in to purchase us (newmont or the like) Then the pricing scenarios can pretty much get set aside, and we pull out the fireworks.

    1. When comparing with Surge Copper, I think a SC PFS would:


      - produce more CuEq per year

      - have a lower opex


      Assuming similar capex cost, I think it's fair to hope for a PFS around NPV (8%) 5B to 6B CA, using similar LT pricing.


      Buyout between 0.3x (bear case), 0.5x (normal) and 0.8x (bull case) .


      With the current context, 0.5x to 0.8x NAV would be my range.


      MoneyK


      1. And the big unknown with SC is whether some of our 'waste rock' gets added back into the the resource estimate, with the lt copper price increasing.

        1. All drilling to date should resolve this issue, quite an old issue to add!


          Teck to blame! They used inferred resources and called it waste! Golf can educate further on this big issue!


          I doubt those resources are inferred now with all the drilling to date! So they can't call it waste. It was a negative double-edged debacle! 

  2. C$2.11
    C$1.95
    C$1.86
    C$1.78


    ^ Book ANY of those tomorrow. I'm happy and RELIEVED!

    Sorry it's a bit of long read but I do find that if AT does go ahead with the PFS, it'll continue to add value to our share.

    That's only if market stability is maintained for what, another year or two? I don't trust that will happen. SELL NOW!!!

  3. Holy Moly Calvin, and I thought Lord of the Rings was a long read!! = Thx for taking the time, a lot of this is out of my depth but it looks good to me.  Can't wait for VD news, that has got to get us another bounce....

  4. Rabbit hole ? More like a journey to the centre of the earth. It took me 3 minutes just to scroll down to the end so I could make this reply. 
    So about $1.70-$2.10 is your range. Earlier i prognosticated $1.50 -$2.00. Let's hope AT and ES are on the same page. 

    FWIW I think the Arizona assets can, in a year or (ugh) two , be worth close to the same amounts IF they get a financially beneficial JV AND MM gets drilled next year with good to very good results.