Building the mine

I have been wondering for a while now, about the timeline for building the mine...two years has always been mentioned. That was before the JV with China.

Now that there will basically be no limit in terms of funds, does anyone see the possibility/probability, of the mine being built faster, and the mine opening sooner.

CRRC will be building the railroad, and therefor have a constant supply of materials being brought in by freighters. There will be a plethora of Chinese engineers, and others with a wide variety of expertise. As many specialists in mine building needed, will be available. Skilled workers may very well be brought from China as well, as I doubt that there are many in VZ who have had much experience building top of the line mines. If CREC wanted to have the mine up and running in 18 months or so, does anyone think that would be possible?

Pen

Join the conversation about Crystallex International.

Reply

Replies

  1. ""If CREC wanted to have the mine up and running in 18 months or so, does anyone think that would be possible?""

    The Crystallex website has always had it listed as an 18-24 month undertaking, so I doubt that would be much of a problem. More interesting still, could they now make the leap to a 12 month timetable considering the financial and construction power they will now have behind them. I think we only sold CAT's and earth moving equipment that is probably easily replaceable as opposed to long delivery, custom built, process equipment. It will be interesting to see how quickly they can manufacture additional crushers and other equipment that will be needed to increase the production capacity of the mine. I would assume they would just increase the size of the concrete pads immediately to allow for almost plug and play equipment installation to increase the capacity of the mine, as the additional equipment becomes available. We shall soon find out, which is something we've been looking forward to for a long, long, time.

    EZ

    1. What about electric power for the mine? I'm guessing this will be part of the necessary infrastructure build-out. Not sure whether the previously announced "enhancements" to the power grid (post electric shortage) will help power the mine and\or whether we need to pray for rain to fill the dam.

      1. ""What about electric power for the mine?""

        Lots of it in the area, there is a substation very close to the mining area and there is virtually no demand in that area. I don't imagine they'll have to do anything in that regard. Cheap electrical power at our finger tips, that and the .05 cent/liter fuel for trucks and diesel locomotives, add to what should be one of the cheapest operating costs for a gold mine in the world. Huh,.... who would have thunk it....one of the lowest cost, largest gold mines in the world, Las Crisitnas.

        EZ

  2. I've got a question as well with this no limit of funds...I can't see us with a prblem now we got the funds to mine it.

    Do guys think that this will now turn in to an underground mine instead of an openpit mine? This was an issue for them before.

    Crystallex's Planned Mine Won't Get Venezuela Permit (Update2)

    By Matthew Walter and Stewart Bailey - May 15, 2008 17:43 EDT

    May 15 (Bloomberg) -- Crystallex International Corp. won't receive approval for an open-pit gold mine in Bolivar state because the project may cause deforestation, Environment Minister Yubiri Ortega said.

    Venezuela won't allow any open-pit mines for gold, diamonds or coal, Ortega told reporters today in Caracas. Crystallex and Gold Reserve Inc., which owns a copper and gold mine in Venezuela, said on April 30 that they were told Ortega's ministry planned to reject or revoke their permits.

    ``If it can only be mined from underground, it'll be unlikely anything will be economic as an underground mine,'' Kerry Smith, a mining analyst at Haywood Securities Inc. in Toronto, said in a telephone interview.

    President Hugo Chavez's government has nationalized parts of the country's oil, steel and cement industries to gain control over strategic parts of the economy. Crystallex has waited four years for permits to develop an open-pit mine to tap the country's largest gold deposit. Gold Reserve also planned a pit at its nearby Brisas site.

    Neither Richard Marshall, a spokesman for Crystallex, nor A. Douglas Belanger, Gold Reserve's chief executive officer, responded to messages seeking comment. Both companies have said in past weeks that they will contest permit denials.

    Crystallex fell 17 cents, or 17 percent, to 83 cents as of 4:15 p.m. in Toronto Stock Exchange trading. The stock has tumbled 81 percent in the past year.

    Gold Reserve dropped 22 cents, or 10 percent, to $1.95 in American Stock Exchange composite trading. The shares have fallen 66 percent in the past year.

    ``We have a policy of doing all we can to stop global warming,'' Ortega told reporters awaiting a press conference with Chavez. ``Imagine the damage that would do to our forests.''

    1. I don't think there is any way this becomes an underground mine. That was just more uninformed bolivarian revolutionary rhetoric from Gorilla Face before they canned her incompetent @$$.

    2. Joe,

      Yubiri Ortega is full of sh!t. This was something from 2008 when she was probably looking for a suitcase deal. Considering the mess the illegal miners have done in that area Crystallexs' participation can only improve the area. The size of an open pit mine would have absolutely no bearing on global warming but the improvements that Crystallex can make in that area can. Marshall and Belanger aren't foolish, they are not going to start commenting on area that would be stepping on Venezuelan government toes, not now. I actually doubt whether China Railway would even let them comment at this stage in the developments. I truly expect this to be an open pit mine at some stage in it's life span......................

      EZ