  1. Is this 100%? I was told drilling to resume on Jan 14 or Jan 15. Have things changed?

    Anyone else can confirm?

        1. It has been -40C in Red Lake, the drillers may be on site on Monday the 12 th but it may take to the 14th or 15th before the drills start turning, everthing has to be thawed out, water circulating, etc etc etc

          Norm

          1. Good day all.

            Spoke to Don Myers today. The crews will arrive on site early next week. It will take a fews days to prepare the rigs and drilling WILL commence on Wed or Thur of next week.

            It has been confirmed that the drill from Hole #2 has entered onto CYP/SYH ground, therefore the last core sample retrieved has been sent to the lab.

            IMO next week and beyond will be VERY interesting times for us share holders.

            GOOD LUCK. GOOD LUCK.