Skip to content
Sign in

Post

Cypress Development Corp.

Treasurer3.2 rating from 10 members554 ptsRate

Undervalued Stock

Worst case senario, the physical property because of its strategic position will be bought by G at a price higher than today's share price.... My opinion.

Join the conversation about Cypress Development Corp.

Reply

Replies

  1. Red Lake wedge Drill hole BR09-02-1 is at 2005 metres this morning having successfully drilled passed wedge.


    The azimuth is 84.7 degrees and the dip is 73.0 degrees. Will continue with 5 foot core barrel to see if hole continues to flatten and pull left before putting another wedge to deflect up.


    The goal of this 1st w...edge hole is to re-enter the footwall of the NS Shear at approx. 100 metres higher and also have the new hole end approx. 100 metres further to the north from the mother hole

    1. Update

      "Cypress Development & Skyharbour Resources have now completed themother hole #BR09-2 to a depth of 2937 metres on their Broulan ReefRed Lakegold project.

      The hole was collared with an azimuth of at 120 degrees and a dip of 78degrees. The hole ended with an azimuth of 81.7 degrees and a dip of 65.2degrees. This hole encountered Balmer Assemblage a 1586 metres and continued insame until the end of the hole.

      At 2663.8 metres down hole, the companies encountered a major North / SouthShear Zone that is also evident on the Goldcorp Inc. Bruce Channel property immediately to the North of the companies Broulan Reef property. This structure continued to a depth of 2862 metres in the hole.

      The footwall of this structure is a large breccia zone with extensive andpervasive calcite alteration and carbonate vein material. Biotite alterationand patches of magnetite alteration are also pronounced. Bands of fine greysulfides and arsenopyrite are noted. Several zones of ultramafic material areevident within the breccia.

      Cypress & Skyharbour have established a wedge hole off of the main hole inan attempt to obtain a second section through this structure. The firstdeflection wedge was set at a depth of 2000 metres in the mother hole."

      Description of core has changed some what.

      Must of liked what they saw too continue IMHO.

      TH

    2. Red Lake wedge Drill hole BR09-02-1 is at 2022 metres this morning.

      Dip is 72.9 degrees.

      Chibougamau will be reaming hole before putting down another wedge to deflect hole up.