Cypress Development Corp. is a Canadian gold and base metal exploration company developing projects in Red Lake, Ontario, Canada, and in Nevada, U.S.A.
hi, wytsox. I had to get rid of Silverlight as it wasn't working well with my system...kept repeating....almost like stuttering.... Anyway, to wytsox or anyone that has watched it(Only for silverlight), is there anything new in it for us long-suffering longs(we pretty much know…
Drilling is now reported at 1282 metres ,,The dip is 75.8 degrees ...And still in the Iron Formation
IMHO.... There is no time .LIKE THE PRESENT ..to " TRANSFER IN KIND " SOME OF THOSE CYP AND SYH SHARES.....FROM YOUR REGULAR HOLDING Accounts ....TO YOUR TAX FREE SAVINGS ACCOUNT. . ESPECIALLY AT THESE PRICES.. LET'S NOT FORGET... ABOUT THOSE TAX ADVANTAGES ....
The nice thing about a new hole is a good understanding of the geology from the last one. The original orientation of this hole has allowed for the natural drift of the bit, and so far no need for wedges, which are a big factor, timewise, and less complications. K
As per Eric. Closing up shop after tomorrow nights shift until the new year. Mid Jan 2010. TH
Drill hole is at 1506 metres Azimuth is 101 degrees Dip is 75 degrees
Well at least they are almost at 1000m on this hole at this pace they may reach 1800 or 1900 metres before the holiday shutdown.
Hi, chip. No I don't remember it but will have to go back and find it. It wouldn't surprise me.......unfortunately. Maybe I blocked it out in some kind weird way..... for therapeutic reasons. ;) .......new hole progressing well.....for G anyway, lol....lets see if the hole or…
Sanborn-Barrie et al (2001), describe three hundred million years of tectonic history in the Red Lake greenstone belt. The Red Lake belt records a long history of episodic magmatism, sedimentation and tectonothermal activity along the south margin of the 3 Ga North Caribou…
Looks like Red Lake is getting some of that arctic air mass thats freezing western Canada. -27 °C Observed at: Red Lake AirportDate: 5:00 AM CST Monday 14 December 2009 Condition:Clear Pressure:102.0 kPa Tendency:steady Visibility:24 km Temperature:-26.7°C Dewpoint:-31.3°C…
Hole BR09-2 Hole is at 1222 metres Az 107.83 Dip 76.6 Changed bit again Still in the Iron Formation of Bruce Channel sediments. All in all the hole looks to be in good shape... Progress a bit slow due to the hardness of the Iron Formation, and makes bit changes necessary.
very similar ihs pattern http://i47.tinypic.com/vghbf4.png
Drill hole BR09-2 is at 1104 metres this morning. Azimuth is @ 115 degrees The dip is @ 76.9 degrees We are in the Rhyolite above the Iron Formation in Bruce Channel sediments Have a great , safe weekend
Hi, Hammer. I hope you are right and I am not but I thought IR indicated that they didn't get the free 1500 meters drilling and that the financing was the only thing cyp got back. Maybe I am wrong.....did you definitely hear we rec'd 1500 meters of free drilling? That would ease…
from facebook today. Drill hole is at 1032 metres Azimuth is 113 degrees Dip is 76 degrees
Hi Chipshot - agree with everything you are saying. I am in deeper than I would like but I am going to hold on and continue the ride. I have only one other investment but it is performing well right now, offsetting much of my recent CYP losses. Exall lives on still! Those who…
Bru Remember the pictures that were published after the last hole drilled from the east. The hole ends with the gold drawn into the picture just out of our reach. Fast forward to the last hole which ends and once again we get a published picture which shows the end of the hole…
Hammer If you are referring to the hole that was collared on the east side and drilled to about 500 meters into what we think is the nosefold, I think CYP sees this as another "needle in the haystack" hole. Don and crew believe that the current drilling is where to be for now.…
VERY well said Chipshot. Now, with the added $1.25million through private placements and the free 1500m on this hole from drilling company because of the major screw up, my question to management is why don't they get a second drill over to hole #3? Forget about this "BURN RATE"…