Skip to content
Sign in

Post

Donner Metals Ltd.

Replies

  1. Hole 92-09 16.3m (ETW) of 14.14% Zn and 1.5% Cu ($465/t rock)

    150-09: 14.82m of 23.8% Zn and .97% Cu ($645/t)

    159-09: 7.96m of 18.35% Zn and 2.07% Cu ($580/t)

    160A-09: 22.78m of 10.41% Zn and 1.15% Cu ($349/t)