Skip to content
Sign in

Post

Electrovaya

Mail RoomNew, not rated yet101 ptsRate

Time line

The plan is to remodel the current lines on our technology gradually, so that the production of Litarion is completely converted by the end of 2016," says Sankar the Gupta, CEO of Electrovaya.

http://www.photovoltaik.eu/Kanadisch-deutsche-Zusammenarbeit-bei-Batterieherstellung,QUlEPTY2MDkzMSZNSUQ9MzAwMjE.html

Some the info seems a bit off. Also lost in translation. They seem confident their price will be competitive

Join the conversation about Electrovaya.

Reply

Replies

  1. Strange article part as electrovaya do not use toxic NMP for electrode coating but they use liquid electrolyte, a bit confusing, seems journalist mix up some stuff but nice to see visibility bring through Litarion acquisition.

    Claim plant operate at 25-33% of capacity meaning 145 MWh (mean value), as Leclanché contract represent around 8MWh (Ferry + Storage in spain) still substantial production for Daimler before phasing out and revenue in accordance for at least part of 2015.

    Quite reasonable to plan full shifting to non NMP process en 2016, confuse part also letting think that electrovaya will use NMP coating from Litarion prior to shift end 2016 ????

    Would be nice to have German speaking on board to confirm !

    1. I think that making the plant NMP free by the end of 2016 is great news.... I know they said 12 month's a couple of months ago, but that to me is a little too quick....from experience with this type of work....If they want to do it right, which the Germans are known for doing a great job....it would take about 4 weeks just for the QA/QC and the Commissioning of each line....and about 2 months for dismantling and construction of each line. The first line will take the longest....but they will be catch up with the time line with the remaining lines. So don't get frustrated with the little news on how they are doing with the first line conversion.

      1. http://evbud.com/news/641/

        Swiss battery manufacturer Leclanche and a maker of ceramic separators and electrodes Litarion owned by Canadian company Electrovaya have signed an agreement for scaling up their mutual efforts in the lithium-ion battery space.

        1. Good to see that they are aiming for broader collaboration. In terms of EFL though, this appears to be just another Litarion deal and has little to do with Electrovaya's own battery chemistry or cell format. EFL (through Litarion) provides the electrodes, Leclanche builds the cells.

          1. Good to see that they are aiming for broader collaboration. In terms of EFL though, this appears to be just another Litarion deal and has little to do with Electrovaya's own battery chemistry or cell format. EFL (through Litarion) provides the electrodes, Leclanche builds the cells.

            I think that is the way it will be for at least 18 months. Sanker said it is profitable and he needs income to epand. The end of 2016 is not only when the German production lines will be fully converted, but is also when the LG contract for cells expires. This tells me that Electrovaya will have cell production capabilities by then. 2017 may see cells being sold to automitive customer.

            If you have paid attention to the job postings, you will have noticed they are still hiring engineers to finish the design of the power box. What I mean is instead of tieing other manufacturers module together with software that has to be loaded, tuned, ect. They have a box you mount, wire input & output and turn it on. It then auto boots and runs. That is still in the works.

            1. Replying to @prosserp

              Thanks Prosser. I think I am having trouble with the (perceived) lack of communication from EFL. 18 months is not a long time-line in the grand scheme, but an upfront discussion by EFL of their plans/next steps would be useful for shareholders. Maybe I really have just not been paying close enough attention however and it is all right there - in between the lines....

            2. Replying to @prosserp

              "I think that is the way it will be for at least 18 months. Sanker said it is profitable and he needs income to epand. The end of 2016 is not only when the German production lines will be fully converted, but is also when the LG contract for cells expires. This tells me that Electrovaya will have cell production capabilities by then. 2017 may see cells being sold to automitive customer."

              LG contract for cells expires ????

              Daimler just shift to LG but kept a commitment with EFL for a few months, why bet on LG/Electrovaya story ?. 2016 is full conversion of plant but first line of non NMP will come sooner (1-2 NMP coating line strip out at first).

              May Seeking alpha CC transcript provide many info on EFL expectation and sales expectation are not in 18 months

              "And I’m going to go one-by-one. We’re expecting significant revenue growth in the utility energy storage market and currently have established a sales pipeline to some of the leading utilities and independent power producers in North America. This current pipeline includes a potential of delivering over CAD 45 million in the utility energy storage sector alone in the next 12 months."

              Remain same hurdle with electrovaya, can they generate commercial sales or not, bet yes (hope) but reply on at least win contract in 2015.

              1. Replying to @nickto

                Yes Nick. They are working hard toward Industrial sales and storage sales as they are on a more imediate time line.

                I was only adressing the German factory output of cells to the auto plant next door.

                I am sure that as the electrode lines are converted to the environmentally friendly process, Electrovaya will also install or modify existing cell filling/sealing machinery. That will allow them to sell into the Industrial and storage market a lot sooner than 18 months..

                OK?

              2. Replying to @nickto

                Daimler just shift to LG but kept a commitment with EFL for a few months, why bet on LG/Electrovaya story ?. 2016 is full conversion of plant but first line of non NMP will come sooner (1-2 NMP coating line strip out at first).

                I am not betting on an LG/Electrovaya story. What I am betting on is that Electrovaya will build a battery cell next door to the battery pack assembly plant that:

                is more energy dense

                is less expensive

                has 9000 full charge/discharge cycles

                and is safer.

                I am betting the LG cells will go away!!