Skip to content
Sign in

Post

Electrovaya

VEEP3.0 rating from 4 members2.7K ptsRate

Dec 2012 article

Never heard again of storage unit ownership by Electrovaya, shortly before PR on MOU with Asian Partner (Mahindra ?). Could come back on table or just a dead "PR pipeline" ? http://www.enbala.com/contents/subs/IN_THE_NEWS/Articles/2012/2012-12-19-Infrastructure%20Journal%20-%20Developments%20in%20Power%20Storage%20Could%20Provide%20Alternative%20to%20Peaker%20Power.pdf Battery Solutions Electrovaya’s storage solutions, battery units installed at project sites, are currently owned and operated by utilities; however DasGupta said that the company is “looking into owner- ship with new partnerships possible around early 2013.”

Join the conversation about Electrovaya.

Reply

Replies

  1. Never heard again of storage unit ownership by Electrovaya, shortly before PR on MOU with Asian Partner (Mahindra ?). Could come back on table or just a dead "PR pipeline" ?

    I am sure that did not fly. Those were the original version batteries and were just not ready for prime time. The Version 2 battery was much better and could compete with all. Now with the improved version 2 battery I think the competiotion will have to compete with a better battery that is produced at a lower cost. I am now wating on results of testing as most here are. Testing takes a while. The current economic outlook may be having a dampening effect on the firm ordering process. No one want to get caught over extended.