Scottish Storage - SDRC 9.8a 4 Evidence Report - Energy Storage

As for Toronto storage unit, they got reserve of PR

http://www.thamesvalleyvision.co.uk/?wpdmdl=1797

Scottish & Southern Energy Power Distribution (SSEPD) confirms that the results of the targeted Energy Storage and Management Unit (ESMU) trials, along with the installation information, safety considerations and benchmarking of the ESMU devices presented within this document are in line with the evidence criteria specified for the SDRC. It is confirmed that the SDRC criteria has been met.

8. Conclusions

The results of the trials presented in Section 6 confirm that the ESMUs have been tested, with manual control, and that they meet the functional criteria as outlined in the problem statement, hypothesis and test deployment programme [Ref. 04]. The trial results provide evidence that the ESMUs can be utilised on the LV network to:

  • Balance load between phases (with and without storage);

  • Provide storage to balance peaks and troughs;

  • Provide reactive voltage support (with and without storage); and

  • Improve power quality and harmonics.

    In addition, this report has provided: an overview of the ESMU technology, an overview of the installation procedure, outlined the key safety considerations for deployment and benchmarked the ESMU devices. It is therefore confirmed that the SDRC, as defined in the NTVV full bid submission [Ref. 01] and associated change control [Ref. 02 and Ref. 03] has been met.

    The overall learning from the deployment of the ESMUs and an assessment of the hypothesis delivered as part of SDRC 9.4a [Ref. 04] will be provided in SDRC 9.4d, which will be delivered in November 2015.

Join the conversation about Electrovaya.

Reply

Replies

  1. This is great news. Finally.

    All is functioning as advertised. A very large project for EFL. Using the next generation batteries going forward should make it even more interesting.

    1. Next report publish in december will be even more interesting with "smart control" evaluation and more in depth testing, right now test in "manual" mode.

      • Manual: In manual mode the ESMU is controlled directly by the Control Engineer via the Distribution Management System (DMS). In this mode of operation the control engineer uses network data from the Pi database to understand the current status of the network and issues commands accordingly.

      • Smart Control: In this mode a forecasting engine uses network data from the Pi database to produce short term forecasts of network demand, and smart control algorithms then use these forecasts to send out commands to individual ESMUs to manage a particular network constraint or requirement. These individual components are defined as Active Distribution Device Management (ADDM).

      1. Yes, ... but EFL is mostly responsible for storage, not the sophisticated software control.

        Is that correct?

        If so, my point is that their product is doing its job. The software and algorithms that do the controlling are managed by another group. Egg on their face, not EFL's product.

        Yes/No?

        1. Yes, smart control system create by University of Reading, but showing that Electrovaya ESMU's perform well in real life test a big plus and more detailed on performance in next report, right now only 3 units tests, next time full 25.

          Smart Control

          (Core learning outcome: Supporting)
          The NTVV project is creating a new software system to manage the ESMU devices in the field using the smart control algorithms derived and developed by the University of Reading. The smart control system is known as ADDM. The finalised architecture and code design for the ADDM is complete. The build of the Pre-Production and Production systems is underway and the necessary server and communications network hardware are in place. The ESMU Gateway code has been completed and the Instruction checks system has been implemented.

          The project team are now moving onto the forecasting agents that will initially schedule the day ahead schedule for the ESMU. The team have delivered a deterministic forecast that will run and provide a rolling two day forecast of the loads on the feeder where each ESMU is installed.

          The NTVV project has also been simulating the optimal running of the units by using CIM data exported from the NME to understand how to optimally schedule the ESMU both individually and aggregated by using substation loading and voltage measurements.