Beetaloo pipeline

The Falcon presentation mentions existing pipelines that run through the Beetaloo Basin. That is correct. One line runs North-South. This is the Amadeus-Darwin mainline.

"In the Northern Territory, ~550 km north of Marla, is the 1500 km Amadeus Basin–Darwin gas pipeline, completed in 1986 and operated by NT Gas Pty Ltd. This has a maximum daily capacity of 2.5 million m3 (87 mmcf)"


The Amadeus Basin to Darwin gas pipeline supplies Darwin's Channel Island and other power stations with natural gas produced near Alice Springs in Central Australia. This pipeline receives approximately 36 percent of its supply from the Palm Valley gas field and 64 percent from the Mereenie oil and gas field. Construction, begun in July 1985, was completed in November 1986 (commissioned in December 1986). With the exception of the maximum 10,150 kPa pressure maintained in the 116km section from Mereenie to Tylers Pass where the two gas streams are mixed, the pipeline is operated at a maximum 9,650 kPa pressure.

Protection against corrosion is effected by a factory-applied high density polyethylene coating in conjunction with an impressed current cathodic protection system. A state-of-the-art supervisory control and data acquisition (SCADA) remote control and monitoring system facilitates control of the pipeline. Operators in Darwin continuously monitor key aspects of the pipeline over its entire length and can effect instantaneous control including shutdown at seventeen locations along the line. Manually-operated valves provide further control at 12 additional sites, enabling the pipeline to be isolated into segments ranging from 10 to 70km. The design life of the pipeline is 50 years. During that time demand is expected to at least triple to around 1.9 million cubic metres per day. The licensee and operator is NT Gas Pty Ltd.

-------------

Within PetroHunters lease area, this main line branches off to the East, this is the McArthur River spur.

This pipeline is a spur line branching from the Amadeus Basin to Darwin gas pipeline at Daly Waters and stretching to the power station at McArthur River Mine. Pipeline construction began in July 1994 and was completed in January 1995. Gas was introduced in March 1995. The pipeline has an outside diameter of 168.3mm, is 330km in length and has a maximum allowable operating pressure of 10,200kPa. Protection is afforded by an impressed current cathodic protection system and high density polyethylene coating. The pipeline is licensed and operated by NT Gas Pty Ltd.


Join the conversation about Falcon Oil and Gas Ltd.

Reply

Replies

  1. Here is the company that supplies most of the gas for the pipeline:

    http://www.santos.com

    They have a short pipeline for their oil to transport it to Alice Springs, but from their it has to be trucked to the southern coast

    "Oil and condensate is transported from the CTP via a 270 kilometre pipeline to the Brewer Estate facility at Alice Springs where it is stored and loaded onto trucks for shipment to Port Bonython and sale to customers."

    The Beetaloo Basin is much closer to the North Coast, so any oil from there would probably go in that direction using the new rail line mentioned by Central Petroleum



    "The drilling programme is, of course, subject to various operational contingencies and exploration results. Only one well (apart from the attempted drilling of a well in the Beetaloo Basin by Sweetpea Petroleum) has been drilled in the last fifteen years in this region due to the previous lack of infrastructure and relatively low oil prices until 2004 when both the oil price reached new highs and the Alice Springs to Darwin rail link was completed. There are significant logistical problems to overcome in relation to long range desert operations but the Group has found ways to reach solutions to any problems encountered thus far.

    So in short, the infrastructure of the Beetaloo is somewhat less than desireable.

    On the other hand, the infrastructure in Hungary is fantastic, and Hungary is the reason most of us are here.



















    1. >So in short, the infrastructure of the Beetaloo is somewhat less than desireable.



      Sorry, I spoke too soon. The Amadeus-Darwin mainline might not be of much use today, since it's being used by Santos to supply all of the gas to run the generating station for Northern Terrritories Power and Water, as well as the mine in McArthur River. But......

      (From NT Power and water)

      "After supplying the fuel to generate electricity in the major power stations of Darwin, Katherine, Pine Creek, Tennant Creek and Alice Springs over the past 25 years, the Amadeus Basin gas fields of Palm Valley and, in particular, Mereenie, are now experiencing rapid production declines."

      So this would mean that at some point in the near future, the pipeline running through the Beetaloo could be empty. So where is NT Power going to get their gas?

      Gas supply from the Blacktip field will commence in 2009 and provide approximately 95 per cent of the fuel to generate electricity over the next
      25 years. The 286km Bonaparte Gas Pipeline (BGP), which will haul Blacktip gas from the onshore gas plant near Wadeye to the Amadeus Basin to
      Darwin pipeline at Ban Ban Springs is progressing on schedule.

      So I guess NT Power won't need any Beetaloo gas, so where would it go?

      "In case there is any disruption to Blacktip gas, agreement has been reached for the supply of emergency gas from the Darwin Liquefied Natural Gas (DLNG) plant. If this gas is required, it will be obtained via a pipeline that will link the
      DLNG facilities at Wickham Point to the Amadeus Basin to Darwin pipeline.
      "

      So that's good, it appears there is another pipeline being built to connect the Amadeus to Darwin Pipeline to the LNG terminal at Darwin.

      If you want to know where the gas goes from there, and have 16 minutes to spare:

      http://media.conocophillips.com/2006...

      So the prospect of a BCGA in the Northern Territories seems a little more promising to me now than it did this morning, although I don't think any of this can happen any time soon.















      1. >So the prospect of a BCGA in the Northern Territories seems a little more promising to me now than it did this morning, although I don't think any of this can happen any time soon.

        Maybe they are going to do some changes in that regard :)

        The Gas Pipeline & Infrastructure Developments Conference


        16 - 18 February 2009
        Stamford Plaza, Brisbane, Qld, Australia



        16 - 18 February 2009
        Stamford Plaza, Brisbane, Qld, Australia


        Demand for CSM-CMM is at an unprecedented level and LNG is continuing to be a significant focus for oil and gas majors worldwide, while many companies are exploring “tight gas” opportunities and addressing the technological gap to develop previously uneconomic gas fields.

        With this increase in demand, and the evolution of the Federal Government’s carbon pollution reduction scheme, comes the need to plan, build, and develop adequate gas pipeline infrastructure to secure gas supply security now and into the future.

        H ow is your organisation contributing to upgrades in gas pipeline infrastructure across Australia?

        The Gas Pipeline & Infrastructure Developments Conference will be an event not to be missed for those in the Australian oil and gas industry, book your place as a delegate today!


        ...click here for more information on this conference. ... for more information, visit the conference website

        1. >Maybe they are going to do some changes in that regard

          What I meant was that there is no great need for infrastructure in the Beetaloo in the near future (as in 2,3,4 years). They still have a lot of work to do. If at some point in the future they did need some major pipelines, I don't see that being a problem either. If someone in Australia needs a pipeline, APA seems to take care of it.

          APA Group (APA), comprising Australian Pipeline Trust and APT Investment Trust, is a major ASX-listed gas transportation business with interests in gas infrastructure across Australia, including 12,000 km of natural gas pipelines, over 2,300 km of gas distribution networks and gas storage facilities. APA is Australia's largest transporter of natural gas, delivering more than half of Australia's annual gas use through its infrastructure.

          APA also has investments in other energy infrastructure through its minority interest in companies, including Envestra, the Ethane Pipeline Fund, and Energy Infrastructure Investments. APA’s involvement also extends to the provision of Commercial, Accounting, Corporate operations and maintenance services to these companies.

          APA has an internalised management structure with direct operational control over its assets and no fee leakage. APA employs over 1,000 people, who perform all commercial, regulatory, government and stakeholder-related functions, as well as the day-to-day operations and maintenance for both APA assets.

          APA generates strong and secure cash flow from contractual and regulatory arrangements on its assets.

          1. >What I meant was that there is no great need for infrastructure in the Beetaloo in the near future (as in 2,3,4 years).

            I agree. That would make common sense, first need to prove the existence of the gas reserve, and then build the pipeline. Still, the Australians are taking a long look at unconventional energy plays, and are planning ahead with their infrustructure.

            1. Replying to @solyomtwo

              That would make common sense, first need to prove the existence of the gas reserve, and then build the pipeline

              ...remember if mab involved this commodity aka common sense goes out the window...but maybe with location of the beetles layer they will follow protocol...gofo and g'day

            2. Replying to @solyomtwo

              >I agree. That would make common sense, first need to prove the existence of the gas reserve, and then build the pipeline.

              Well after spending a lot of time on the Beetaloo over the last few days, it became quite obvious that this is a very large oil play. Ben Law thinks there is a BCGA at the center, but that's probably not the reason Falcon bought into it.

              There were 11 wells drilled back in the late 80's by Pacific Oil & Gas, with very promising oil shows. The general theory is that the free flowing oil has migrated, and now it needs to be found. Modern seismic should help with that. Not much info can be found on Pacific, other than the article citation below. The "innovative methods" they refer to are now quite popular.....horizontal drilling and fracing!

              Oil and Gas Journal ; Vol/Issue: 92:26 June 1994

              A previously unexplored sub-basin of the Precambrian McArthur basin in northern Australia is developing into an exciting new petroleum province. Exploration by Pacific Oil Gas Pty. Ltd. the past 7 years has indicated that vast amounts of hydrocarbon have been generated from thick, highly organic rich shales present throughout the Beetaloo sub-basin. Several potential sandstone reservoirs are conveniently situated to be charged from the source units. Pacific has recovered oil and gas from these sandstones in several exploration wells demonstrating that maturation, migration, and preservation of hydrocarbons have been effective within the sub-basin. With only a few poorly defined targets drilled to date, more exploration is required to assess fully the hydrocarbon potential of the Beetaloo sub-basin. In addition to exploration for conventionally trapped oil and gas, Pacific has also been evaluating innovative methods to recover the immense resource of unmigrated live oil present within the source units. The paper discusses regional geology, Pacific`s exploration, source and maturity, the reservoir, structure, and the potential for this area.



              1. Replying to @lanman1

                > Not much info can be found on Pacific, other than the article citation below.


                You are not kidding, after more search, I could only come up with this bit of information.


                O&G Journal Volume:89 Issue:32 Aug 12. 1990


                AUSTRALIAN PROTEROZOIC OIL SEARCH TO RESUME
                Pacific Oil & Gas Pty. Ltd.,
                Box Hill, Victoria, Australia, plans to shoot additional seismic lines and drill more wells this dry season in the McArthur basin of far northern Australia, says the Bureau of Mineral Resources, Canberra. Pacific's 1 Jamison stratigraphic test encountered a minor flow of good quality oil and gas late last year. Well site is at 16 27' 10" S. Lat and 133 46' 45" E. Long. The well flowed gas at the rate of 16 Mcfd on a drillstem test at 2,841-3,053 ft.

                1. Replying to @solyomtwo

                  >You are not kidding, after more search, I could only come up with this bit of information.



                  According to Texalta, who are doing similar exploration close to the Beetaloo, Pacific is a subsidiary of Rio Tinto



                  CALGARY, ALBERTA--(Marketwire - Feb. 11, 2008) - TEXALTA PETROLEUM LTD. (TSX VENTURE:TEX.A) is pleased to announce that an initial 200 kilometre seismic program on Permits 103 and 104 in the Georgina Basin, N.T., Australia has been mapped out and that work should commence in May 2008 subject to crew availability. The company has instructed its representative based in Darwin, N.T., to obtain the necessary clearances for sacred sites and the environment.

                  Since the Permits were granted in November 2006 Texalta's team of geophysical consultants has been reprocessing and interpreting the existing 750 kilometres of seismic data which was shot over the period 1988 to 1992 by Pacific Oil & Gas Pty Ltd., the oil and gas arm of the mining company Rio Tinto PLC.

                  It's a dead end after that. Rio Tinto is a huge corporation. They probably just bought them out.



                  On November 8, 2007, rival mining company BHP Billiton announced it was seeking to purchase Rio Tinto Group in an all share deal. This offer was rejected by the board of Rio Tinto as it "significantly undervalues" the company. Another attempt by BHP Billiton for a hostile takeover valuing it at US$147 billion was rejected on the same grounds.





                2. Replying to @solyomtwo

                  ...we have to ask...will you continue to follow mab after fo has taken it course...it seems so many of the little investors believe they have been wrung through the wringer...do you think anyone will give mab time or day for any further plays like the beetaloo basin...it really is funny how over the years the little guys have b and m about being taken advantage of by mab but yet there are still the big boyz who continue to hold onto this dog...and it was very much reassuring that real investors entered into a pp before the exxon deal...sure there are probably trading of weekends at chalets and use of exotic cars for the weekend...but in the end the people that really get to see and hear the numbers are still around in full force...so the question will be...if this falcon play...mind you it is strongly supported by Exxon and MOL...witnessed by their physical and monetary presence in the trough during a time that many say are nearing doomsday proportion...if this falcon play does pan out after tweeking and twisting the straws in the rock...what next for mab and the good dr's bcga theory...we thinks that if this stroke of genius finds paydirt...that many will be begging to get into the pp that will fund the double gulp of high grade oil liquid that lies beneath the outback...maybe walzing matilda will ring in our ears once again...and you can bet we will be toasting with a meat pie, tim tams, and a pancake or two with lemon lightly sprinkled with sugar...until then we wait on test results...ones that should be very very very interesting...cant help but think that igor and his clan...having been in the trenches...remember he was on the board...a board that was obviously privied to insider information...gosh...need we say that if he left the board...and then on the outside market started accumulating shares...boat loads of shares...he and his are most likely not idiots...but then again maybe they are just locking in losses to cover gains from all their other winners...hmmmmm...a true insider buying millions and millions and millions of shares...time will tell whether they made a good investment after seeing what exxon and boyz have seen...it wont be long now...gofo and g'day

                  1. Replying to @pipedreimr

                    >.we thinks that if this stroke of genius finds paydirt...that many will be begging to get into the pp that will fund the double gulp of high grade oil liquid that lies beneath the outback.

                    me thinks that too...but if no paydirt the genius does find...then the stroke will become strike....strike three that is...









                    1. Replying to @lanman1

                      me thinks that too...but if no paydirt the genius does find...then the stroke will become strike....strike three that is...

                      ...at least we wont be charged of using steroids...or will we...exxon is awfully large and they swing a big rod...funny how it all comes down to the testing...the one thing we have been waiting for since day one...glad to the know the tests are being done by the best...gofo and g'day

                  2. Replying to @pipedreimr

                    >...a true insider buying millions and millions and millions of shares...time will tell whether they made a good investment after seeing what exxon and boyz have seen...


                    They have already seen enough... they are planning the next step...

                    Mol's 2009 Presentation.


                    1. Replying to @solyomtwo

                      >They have already seen enough... they are planning the next step...

                      Mol's 2009 Presentation.



                      That same map was in their Apr 2008 presentation as well though. I would imagine they will hold of on the Bekes until they have more data from the Mako.









                3. Replying to @solyomtwo

                  >Well site is at 16 27' 10" S. Lat and 133 46' 45" E. Long.

                  John, do you happen to have the co-ordinates of Petrohunters well? They seem to be having trouble locating it :)



                  From PetroHunters 10K



                  Beetaloo Basin Project. Sweetpea also has four exploration permits in the Northern Territory, comprising the Beetaloo Basin Project. In September 2007, Sweetpea drilled and cased one well the Shenandoah #1 to a total depth of 1,555 meters (4,740 feet) in the area covered by Exploration Permit (“EP”) 98 in the Beetaloo Basin. The test was a twin (50 meter distance) from the Balmain #1 well and was designed to test the Bessie Creek Formation at a depth of approximately 3,000 meters. The well was completed to the drilled depth of 1,555 meters and cased, in anticipation of later completing the well to the targeted total depth.



                  From Falcons prospectus:

                  The exploration permits that form the legal basis for the Beetaloo Basin Project require the drilling of eight new wells (one of which has already been drilled by Sweetpea, even though the well was lost before reaching its objective depth) and the acquisition of 800 kilometres of new seismic by December 31, 2009.















                  1. Replying to @lanman1

                    >John, do you happen to have the co-ordinates of Petrohunters well? They seem to be having trouble locating it



                    Yes, I do have it Lanman. I'm afraid I can't post it, Big Brother is watching :)

    2. >On the other hand, the infrastructure in Hungary is fantastic, and Hungary is the reason most of us are here.


      I culdn't agree with you more Lanman. Below are the numbers of that infrastructure.