Skip to content
Sign in

Post

Falcon Oil and Gas Ltd.

Replies

  1. >What are the options for Mako 6 now that it has been repaired?

    I think it's highly unlikely they will ever do any more work on that well.

    "In June 2008, the Makó 6 well intervention was completed. The intervention included removal of the 3 ½ inch tubing down to 2,250 meters and the cementing of the well down to about 2,818 meters. A drillable plug was set above the cement in the 5 ½ inch casing, thereby concluding the Makó 6 well repair."







    1. I think it's highly unlikely they will ever do any more work on that well (Mako-6).

      So, what was the purpose of repairing it?



      db

      1. Repairing the well is a laymens description of the work that was being done. Here is a clip from the SLB glossary that describes the P&A process and why it's done.

        http://www.glossary.oilfield.slb.com...

        plug and abandon
        1. vb. [Drilling] ID: 1527

        To prepare a well to be closed permanently, usually after either logs determine there is insufficient hydrocarbon potential to complete the well, or after production operations have drained the reservoir. Different regulatory bodies have their own requirements for plugging operations. Most require that cement plugs be placed and tested across any open hydrocarbon-bearing formations, across all casing shoes, across freshwater aquifers, and perhaps several other areas near the surface, including the top 20 to 50 ft [6 to 15 m] of the wellbore. The well designer may choose to set bridge plugs in conjunction with cement slurries to ensure that higher density cement does not fall in the wellbore. In that case, the bridge plug would be set and cement pumped on top of the plug through drillpipe, and then the drillpipe withdrawn before the slurry thickened.

        Alternate Form: P&A

        See: bridge plug, casing shoe, cement, cementing, operator
        2. vb. [Well Completions] ID: 2758

        To prepare a wellbore to be shut in and permanently isolated. There are typically regulatory requirements associated with the P&A process to ensure that strata, particularly freshwater aquifers, are adequately isolated. In most cases, a series of cement plugs is set in the wellbore, with an inflow or integrity test made at each stage to confirm hydraulic isolation.


        1. We don't really know what is the final status of Mako-6.

          According to the Production and Development Agreement, it is Exxon who will have the final say. I think the jury is still out on this one.

          1. I think the biggest problem with the Mako-6 was that the formation (permiability) was damaged by the fluids left in the well while they waited on the new tubulars.

            Plugging a well doesn't mean that they can't (or won't) go back into it though. It just seals it up so they don't have to worry about things like formation communication, corrosion, pressure, or H2S at surface.

            Maybe Falcon or EOM will have a representative at this SPE conference later this month: 8th European Formation Damage Conference

            http://www.spe.org/events/efdc/index...

            1. Replying to @Silverhound



              I agree with your assesments, and lets hope the formation damage is limited to the lower formations only, so then Exxon should be able to get back in Mako-6 to complete the Szolnok formation.

              >Maybe Falcon or EOM will have a representative at this SPE conference later this month: 8th European Formation Damage Conference

              I'm sure they would have an expensive story to tell :)