Australia work has commenced

Road work has started down under and drilling should begin within 30 days. Everyone keep your fingers crossed for good results. This could be a nice addition to the assets in Hungary.

TOM

Join the conversation about Falcon Oil and Gas Ltd.

Reply

Replies

  1. Great news TOM. Let me tell you, I got parts of my body crossed that I didn't even know existed.

    I do have one question. Does anyone out there know if Foldeak 1 well was drilled with the H2S resistant pipe?

    GOD BLESS,

    1. Great news TOM. Let me tell you, I got parts of my body crossed that I didn't even know existed.

      ...mrMarco that is funny you say this...when lilpipe was visiting papapipe not too long ago papapipe was going through the body crossing excercise...which is part of falcon oil and gas investing 101...and lilpipe asked pipe...should we sprinkler some salt on papapipe...pipe said no lil one...papa and pipe prefer choco syrup...as always lilpipe asked why...pipe responded...becuz papa and pipe believe that they believe...believe what lil repsponded...that there is oil in them hills lilpipe...and before long mrRex is goiong to sqeeze the bottle...lilpipe pipe said but we sure do like salt on our pretzel and not chocolate...one day it will all make cents...maybe...speaking of food...it is almost tee time...gofo and g'day

    2. >I do have one question. Does anyone out there know if Földeák 1 well was drilled with the H2S resistant pipe?

      I doubt that any of us know what types of pipes were used at the Földeák-1 well; after all, it is ExxonMobil we are dealing with. They are known for keeping operational details to themselves. I've heard of opinions, that the H2S resistant pipe may not be necessary. The early H2S findings were attributed to faulty test readings and chemical reaction of fluids used in the very high temperature environment.

      Once again, here is an extract from KissxOfxdeath's post:

      TMF

      "Some posters may not be aware that further studies appear to suggest that the hydrogen sulphide issue that caused such strife three years ago appears to have faded away as it became clear that the readings for H2S were actually due to faults in the equipment and the products used rather than being generated underground. This will significantly reduce the costs and difficulties for future development of the play if it is commercial. It only remains to wonder what might have been if the company hadnt been staffed by incompetent cowboys in the first place and it had been able to test the wells it drilled three years ago successfully."

      1. Marco:

        As KofD suggests, mistakes were make in drilling and attempted completion of M-6. I can't believe engineers would not have obtained confirming H2S readings on different equipment--even if they were "cowboys." Reading were probably also take by HAL or other service companies--not just FO "cowboys.

        As I recall, H2S was encounteredd when attempting to complete the deeper BC or lower Endrod. --H2S in those deeper formations does not mean that the Foldeak-1 would encounter H2S--but you can be sure EOM engineers were looking for it. They spend untolled hours of well pre-planning and simply would not drill or attempt completion of a well unprepared for H2S after being warned of its possible existence by FO's M-6 experience. If they did, they would immediately be working as real "cowboys."

        The "big" question is: When are they going to test these dam wells?? Snow falls in Hungary in 4 to 5 months !!

        Oldwine

        1. Well Phase 1 is scheduled to end Aug. 10. Rod Wallis was expecting to have actual reserves by year end last year. I guess no one really knows what's going on behind the scenes. That's why I love AUSTRALIA so much, success in the outback will keep SIR REXALOT in line and will keep MAB'S mouth out of the continent.

          GOD BLESS,

        2. >The "big" question is: When are they going to test these dam wells?? Snow falls in Hungary in 4 to 5 months !!

          Oldwine,

          Here is what Macquarie reported in their June update:

          "During May 2009, ExxonMobil reached total depth of 14,500ft (4,421m) on the drilling of the Földeák-1 well, which is currently being evaluated for testing. We expect that there will be well test results released from the Földeák-1 well in 4Q09 (October) which could be a major catalyst for the stock."

          Therefore testing will commence an earlier date. Like you, I wish the parties would be more forthcoming with their schedule, but as I said before, this is an ExxonMobil show and they are known for keeping operational details to themselves.

          As for snow in Hungary? There should not be a problem there; it is not as if you were working in Siberia or Northern Canada ;)

          Hod-1 well worksite in December 2008

          Földeák-1 well in winter 2009

          1. this is an ExxonMobil show

            ...words of wisdom mrSolymony...those who dont believe...dont understand this...hard to believe that some are still in denial that we have a production license, cash, and a stellar jv that could have parked camp anywher in the world...and just as a coincidence they stopped at our little trough...probably for the onions...gofo and g'day