If this natural fracture system in the Foldeak-1 well, which we now know is full of water, came as a complete surprise to Exxon, Falcon, and MOL, do you think Falcon would have said this:

"Falcon is currently evaluating the remainder of the Szolnok Formation to determine if it is possible to move away from this potential natural fracture system."

If you buy a bushel of apples, and the first one you bite into is bad, do you assume the entire bushel is bad, and then search through it to "see if it's possible" to find a good one?

Of course not. One would normally assume that the rest are still good, and it was just bad luck that you found a bad one on your first attempt.

That's why I find this sentence from the news release a little 'fishy'. It strongly suggests to me that they knew the fracture system was there, and that it exists throughout the Szolnok at the Foldeak-1 location. Natural fractures are a very good thing, unless they happen to contain water!

I don't have a whole lot of hope for frac #3 on the F1. If I'm right, it would explain why Exxon didn't want continue work on that well. I do however believe they plan on sticking around for a few more years, and think the money would be better spent on drilling in a different location.


Most of us also remember Bruner saying that the first few wells would be in production by the end of 2006. Obviously that didn't work out, but that is not all that he said:

"I mean, frankly, the chance of, the good news is we found, you know, a whole lot of gas-saturated sands. The chances, frankly, of finding the best place in 575,000 acres is probably very, very low, so the way you find the best places is you drill wells, okay?"

"Certainly by the end of the year they should all three be into full production, and we will continue to drill step-out wells to try to find the sweet spots. My best guess is the exploitation phase will start in the next year after we have drilled some of these exploration wells and found and identified the best places to drill the exploitation wells"

(If I'm not mistaken, the plan at the time was to drill 17 more wells)

Fracing of the F-1 started on or about Sept 17th. On Sept 29th, Falcon was saying this at a conference in Budapest:

"The most prolific parts, called sweet spots, possess a reservoir potential higher than the average. The identification of these sweet spots constitutes one of the most important, and quite possibly the most challenging task of the entire exploration project."

So I think it's quite obvious that they have yet to find the sweet spots, and it will probably take a lot more wells to do so.

Falcon has stated that they think frac 3 & 4 might be a 'sweet spot', but they are referring to a 'sweet spot' within a particular formation at a particular site. I think they still need to locate a 'sweet spot' within the Mako Trough itself.

As for the Hod-1 and Mindszent-1, I don't think those wells were drilled in order to find sweet spots, or for testing flows. I think they were strickly delineation wells, drilled solely for the purpose of obtaining a production licenses.

Join the conversation about Falcon Oil and Gas Ltd.

Reply

Replies

  1. >As for the Hod-1 and Mindszent-1, I don't think those wells were drilled in order to find sweet spots, or for testing flows. I think they were strictly delineation wells, drilled solely for the purpose of obtaining a production licenses.

    This article seems to prove your theory Lanman. This article appeared last Thursday in the PROMENAD.hu

    http://www.promenad.hu/modules.php?name=News&file=article&sid=59950

    Domestic News: Gas production could start within six years.

    On September 21 2009 at the Mindszent township meeting, Laszlo Párkányi township representative appealed to the Mayor’s Office and requested from the Mayor's Office to seek information from MOL Nyrt. about the company’s deep drilling research activities on the outskirts of the township.

    The Mindszent Development Office on September 30 2009 contacted MOL in writing. In the letter sent to György Volter MOL’s head of official and social relations, asking for information about the current state of research activities, results of the deep drilling and whether the hydrocarbon production is expected in the near future - said clerk Dr.Tamás Hevesi.

    On October 7th MOL sent its reply. In the letter, MOL reports that the deep drilling of the Mindszent well between August and November 2008 has been successfully completed, consequently non-traditional hydrocarbons were discovered. However, the research still continues in the Makó trough, therefore currently there are no definitive opinions pertaining to future research and possible extraction. Since then, the research permit in Mindszent area expired on July 27 2009, right now MOL, in accordance with the relevant legislations is preparing the final report of the research process to the Mining Bureau. After the acceptance of the report by the Mining Bureau, MOL planning to apply for a mining plot in area.

    In addition, György Volter reported in a phone conversation, the explorations have been successfully concluded, indeed the expected amount of non-conventional hydrocarbons, or natural gas is there under the earth more than 4300 meters deep. Even before the drillings has started, in a public forum held in Mindszent, the MOL's representative said, that it is clear that there is sufficient gas in the ground, but only after the completion of the test drillings can be determined what technology to be used and at what price can it be brought to the surface. So the question is can it be done economically. According to the information from György Volter, they have succeeded in finding the technology that could economically bring the gas to the surface. This proves that the MOL has a definitive plan to open a mining plot at the Mihási road site in July 2010. Under the existing mining laws, when a mining plot is granted, production must begin within 5 years. This means that between July 2010 and July 2015 the production probably will start.

    According to the clerk this is good news, since Mindszent’s local authorities can expect a significant business tax revenues, and employment impact from such a large scale investment.

    Peter Kokovai

    1. >This article seems to prove your theory Lanman.

      Thanks John. I have a theory that MOL will be applying for a mining plot on block 106 as well in the near future :)

      " According to the information from György Volter, they have succeeded in finding the technology that could economically bring the gas to the surface."

      That's interesting. I'm assuming what he means is that several frac jobs have been performed in the Mako trough, by both Falcon and Exxon, and all of them seemed to be successful in so far as breaking open the rocks, which is exactly what a frac job is supposed to do. They know the gas is there, they know they can frac the rocks, all they need to do now is figure out where to frac the rocks. I think what they have done so far is all part of the 'formation evaluation" process. Here's an explaination of that as it applies to shale gas:

      "Vertical wells are drilled in the Haynesville Shale to initially evaluate the play, test completions, and plan hydraulic fracturing strategies. The choice of perforation depth intervals is often based on limited geological knowledge because it is a relatively new field and there is uncertainty about the lithologies comprising the strata. A lack of knowledge about the complexity of the formation across the basin contributes to this uncertainty. Conventional log responses are at times difficult to interpret. There are effects due to relatively high clay content and organic matter in the rock matrix not usually present in other conventional reservoirs where conventional responses are less challenged. These effects make gas-rich sweet spots difficult to identify unless new technologies are incorporated for reference. The goal of formation evaluation in gas shales is to identify preferable zones for gas productivity from both a petrophysical and engineering standpoint."



  2. Exxon is certainly content paying for an additional frac on F-1 because it fulfills their financial obligations to the JV. Now they are free to walk, having spent the alloted monies for phase 1. It shouldn't be long now before we hear officially, what most of you already know - that Exxon is not proceeding any further with Bruner and Co.

    Just something else to think about.

    1. >Exxon is certainly content paying for an additional frac on F-1 because it fulfills their financial obligations to the JV.

      You seem to have missed the fact that IT WAS EXXON WHO DID NOT WANT TO DO THE FRAC!, meaning your logic has totally backfired.

      The contract states that they can't leave until they spent $50 million. By recommending that they don't do the 3rd frac, they were preventing themselves from leaving. The only reason they ended up doing it was because they were most likely outvoted by MOL and Falcon.

      1. I know Exxon didn't want to do the additional frac - they knew from almost the beginning of the test that F-1 was a complete failure because of the water. Most of the expertise in Mako resides on Exxon's side, so terminating the well was the right decision. Mol and Falcon's insistence to continue is irrelevant in the matter.

        Exxon's paid up, there is no carry over money, no refunds, nothing. A very clean and tidy ending if I may say so.

        1. >Exxon's paid up, there is no carry over money, no refunds, nothing. A very clean and tidy ending if I may say so.

          Yep...all the legal requirements to move onto Phase 2 :)

  3. lanman1:

    Good thoughts, and I thank you for posting them. Since you are in a "ruminating mood," three questions, if you please:

    Why do you think XOM avoids reentering M-4 and M-6 to test the Szolnok in these locations? It would seem to be much more economical to test existing wells to locate "sweet spots" and build cross sections than to drill new wells. I understand they are FO's wells, but surely FO wants them tested and would make a deal to do so.

    Who do you think made the "final" decision on the location of the F-1?

    Why do you think the high resolution seismic does not see the fracture systems? The source of the "fresh water" must be way up. Fractures would have to run through the horizontal stratifications in the Szolnok (I would think !)

    Thanks for your thoughts.

    FO-4

    1. >Why do you think XOM avoids reentering M-4 and M-6 to test the Szolnok in these locations? It would seem to be much more economical to test existing wells to locate "sweet spots" and build cross sections than to drill new wells. I understand they are FO's wells, but surely FO wants them tested and would make a deal to do so.

      I think they need to find sweet spots before they spend lots of money doing well testing. The sweet spots could be be in a completely different area. Perhaps Exxon does not think the M4 and M6 are worth testing.

      >Who do you think made the "final" decision on the location of the F-1?

      The F1 location was determined prior to the JV agreement.

      >Why do you think the high resolution seismic does not see the fracture systems?

      I don't think you got the point of my previous message. I think the seismic did show the fracture system, and that's why they drilled where they did. In other words "WOW, look at all those fractures, lets drill a well there!"

      >The source of the "fresh water" must be way up. Fractures would have to run through the horizontal stratifications in the Szolnok (I would think !)

      Don't forget the Mako Trough is in the Pannonian Basin. An area famous for it's geothermal energy! The Bekes basin is right next door to the Mako Trough:

      ----------

      The Nagyszénás area belongs to the southern belt of the
      Békés Basin i.e. to the Battonya-Pusztaföldvár Mesozoic
      Trough. The first exploratory wildcat oil well was completed
      in 1954 at a depth of 3009m. During 1978-1988 six more
      exploratory wells were drilled in the area with final depths of
      2800-4200m. These wells confirmed the existence of
      medium-high enthalpy overpressured geothermal resources
      below a depth of 3000m.
      The steam blow-out of
      Fábiánsebestyén 4 well and the flow test of well Nagyszénás
      3 (Nsz3) confirmed that geothermal overpressured resources
      occur in fractured Mesozoic formations in the area and may
      be suitable for power generation exist.

      Overpressuring in basement rocks, most of which are
      fractured, may be caused by:

      (i) aquathermal heating and

      (ii) thermally generated carbon dioxide in the basement rocks
      simultaneously with downward migration of fluids from
      overpressured Miocene and lower Pannonian basal marl and
      argillaceous marl.