Skip to content
Sign in

Post

Fancamp Exploration

Treasurer2.8 rating from 304 members11.6K ptsRate

Fancamp Amends Previous Disclosures

Fancamp Amends Previous Disclosures

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Sept. 5, 2012) - Fancamp Exploration Ltd. (TSX VENTURE:FNC) ("Fancamp" or the "Company") As a result of a review by the British Columbia Securities Commission we are issuing the following news release to clarify our disclosure standards and to emphasize the historic nature of reported reserves and the degree to which they can be relied on. These modifications have also been effected on the Company's website.

The Clinton Property: The Clinton Property is located in the Clinton volcano-sedimentary Belt, straddling the Maine border. It covers 20km of favorable stratigraphy and includes historical resources estimated at 1.52 million tons grading 2.08% Copper and 1.54% Zinc in five zones: A, C, E, F and O (Quebec government Fiche de Gite 21E07-0007). (In 1973, 122,251 tons of material grading 2.65% Copper, 2.43% Zinc, 0.46% Lead, 30.03 g/t Silver and 0.45 g/t Gold were mined from the "O Zone" (Groupe Minier Sullivan, 1973 Annual Report)). These historic resource estimates were completed prior to the implementation of National Instrument ("NI") 43-101 standards. Given the quality of the work prepared by the government of Quebec and the Groupe Minier Sullivan, the company believes the resource estimates to be both relevant and reliable. However, a qualified person has not completed sufficient work to classify the historic mineral resources as current mineral resources, and is not treating the historic resources as current. Hence, they should not be relied upon. Jean Lafleur, P.Geo., the company's qualified person and a director, has reviewed and approved the technical disclosure contained in this news release.

The Magpie Property: The Magpie Deposit, of which 46.7% is owned by Fancamp Exploration Ltd. is among the world's largest undeveloped titaniferous magnetite deposits with a historical non NI 43-101 compliant resource estimate for Deposits # 1, 2, 3 & 4 totalling 1.1 B Tons @43% Fe and 11%TiO2. These historic resource estimates were completed prior to the implementation of National Instrument ("NI") 43-101 standards. Given the quality of the work prepared by Stratmat Ltd in 1960, the Company believes the resource estimates to be both relevant and reliable. However, a qualified person has not completed sufficient work to classify the historic mineral resources as current mineral resources, and is not treating the historic resources as current. Hence, they should not be relied upon. A NI 43-101 resource for the Magpie #2 Deposit was published, by P &E Mining Consultants Inc. of Brampton Ontario in May 2012 and can be seen on the Company's website. Jean Lafleur, P.Geo., the company's qualified person and a director, has reviewed and approved the technical disclosure contained in this news release.

The Company's news releases of April 18, 2012 and June 1, 2012 used what appears to be overly promotional language by stating "the Magpie #2 occurrence will be upgraded to a higher quality Mineral Resource classification". What the Company meant by this statement was the upgrading of inferred mineral resources to indicated mineral resources through additional drilling. Any upgrade to the resource classification is contingent upon the success of ongoing and future exploration work.

Further revisions have also been made to the Company's website, including the removal of any non-compliant material and any other material that may be considered overly promotional.

Fancamp will also be amending the MD&A for the year ended April 30, 2012 by including the required cautionary language for any references to historical estimates made concerning the Clinton Property and deleting the referred to resource estimate on Cliffs Resources Inc. Lac Lamelee North Deposit.

ON BEHALF OF THE BOARD

Peter H. Smith, PhD, P. Eng., President

Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties.

S.E.C. Exemption: 12(g)3-2(b)

No stock exchange or securities regulatory authority has reviewed or accepted responsibility for the adequacy or accuracy of this release.

Join the conversation about Fancamp Exploration.

Reply

Replies

  1. The News Release, signed by Peter H. Smith (“ON BEHALF OF THE BOARD”) [caps in the original], omitted the most important numbers of all. Dr. Smith bungled the company’s explanation of how to make sense of the “historical” Magpie information he put in the News Release.

    Even though Dr. Smith speaks “ON BEHALF OF THE BOARD,” I doubt he consulted with many of the Board Directors, concerning his decision to refer to the NI 43-101 only by its rough May 2012 date. Of course, it was a terrible blunder to leave out the actual summary numbers of the NI 43-101 (compared to his having included the outdated “historical” findings).

    The British Columbia Securities Commission questioned the wording of the disclaimers associated with the company’s descriptions of its “historical” resources. To repeat giving the “historical” numbers (whose disclaimers are being reviewed), without giving the unquestioned NI 43-101 numbers, misses the most important point of all. Of course, the reported NI 43-101 numbers are very compelling (even more so than the “historical” numbers).

    I am not questioning Dr. Smith’s geophysical competence. On the contrary, he’s used his great geophysical expertise to back up each share of our stock with great geophysical resources.

    The problem is, this latest slip-up running our business affairs is on top of all his others. If I didn’t know better, I would say he’s put in extra hours of hard study to secure the company’s current appalling reputation in the financial marketplace. In this latest episode, we had the opportunity to turn adversity into advantage. Instead, Dr. Smith managed to turn adversity into worse adversity.

    When it comes to the price of our shares (maximizing shareholder values), every day he’s running the company’s business affairs is one more day we suffer the financial consequences of his failure at common sense. It’s one more day, on top of years’ worth of other days, of his slapdash un-businesslike failure to recognize simple business logic.

  2. Kind of ironic that many of us have continually claimed that Peter has been overstating what we have and these market experts say it is too much.

    Anyway no problem-just continue to piss off these annoying people and maybe we get some attention!!!

      1. Lethal,

        I am a bit puzzled about the NR as well with its wording (italics). Note that the inferred is about 1/2 od the indicated( 0.635 B tonnes). Also it's customary for the consultaing firm to say something similar to the wording in italics below anyway to protect their reputation. The question is why raise the fuss about the inferred amount to put doublt in people mind. WE know how to treat the iinferred amouunt anyway without the company reminding us again. The was a company (don't recall the name) that was taken over by another one and the deposit was all in the inferred category.

        Another example of being ultra-conservative. "If you have it, why not flaunt it".

        goldhunter

        ------------------------------

        Magpie – an Iron-Titanium-Vanadium-Chromium Deposit
        The 46.72% owned Magpie Iron-Titanium-Vanadium-Chrome Project hosts NI 43-101 Indicated Mineral Resources of 635.2 million tonnes grading 42.495 FeT (60.78% Fe2O3), 11.20% TiO2, 0.30% V2O5 and 2.61% Cr2O3 with additional Inferred Mineral Resources of 293.2 million tonnes of 42.29% FeT (60.49% Fe2O3), 11.21% TiO2, 0.32% V2O5 and 2.54% Cr2O3 (both based on a 15% FeT cut-off grade) (refer to the Fancamp news release dated April 18, 2012). The Mineral Resource estimates follow the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions. The quantity and grade of estimated Inferred Resource reported herein are uncertain and there has been insufficient exploration to categorize them as an Indicated or Measured Resource. It is uncertain if further exploration will result in reclassification of Inferred Mineral Resources to the Indicated or Measured Mineral Resource categories.

        1. http://howardgroupinsightnewsletter.blogspot.ca/2012/09/argex-successfully-boosts-titanium.html

          Argex successfully completes 3,000% pilot plant scale-up

          Thursday, September 06, 2012

          MONTREAL, Sept. 6, 2012 /CNW Telbec/ - Argex Titanium Inc. (TSXV: RGX) (FSE: ASV) (OTCBB: ARGEF) today announced it has

          successfully completed the production scale up of high purity titanium dioxide (TiO2) at its pilot plant.

          Production capacity has increased from 0.3 kg/day to 10kg/day, a 3,000% increase in production. As stated in earlier news releases,

          this was achieved in two stages. First, the 3 kg/day capacity plant was installed and tested. A new 10 kg/day capacity plant was then

          constructed in an adjacent building. The pilot plant is located at PRO in Mississauga, Ontario.

          "This successful scale-up provides another affirmation of our CTL chemical technology process. The primary purposes of the scale-up

          were to decrease pilot plant operating costs and increase TiO2 production volume, thus permitting end-user sampling on a much

          larger scale for use in their paint production. We can now produce more than three tonnes of TiO2 per year from our Mississauga

          plant," said Enrico Di Cesare, COO & VP Technology for Argex. "Scalability was never an issue. The delays experienced in the scale-up

          of the pilot plant were due to delivery delays and minor - but necessary - design changes to the building. This will not be a factor in

          the construction of our industrial plant."

          "This is a significant milestone for the company," said Roy Bonnell, President and CEO of Argex. "Our team is focused on actively

          pushing Argex to the next level and, with key and experienced personnel in place, I believe we will get there in short order."

          The CTL process is a proprietary mineral extraction process that allows for the production of high purity (99.8% pure) pigment grade

          TiO2 product, which can then be sold to the end-users in the paint, plastic and coating industries.

          The process is unique in that it produces high-purity TiO2 in a single location through a single process directly from the ore material.

          The equipment used in all parts of the process is known and readily available.

          The process is also environmentally friendly due to its high energy efficiency, low emissions and its closed-loop design, which uses

          relatively low concentrations of hydrochloric acid that is regenerated after use in the process.

          1. Good news! It sounds like they could scale it up to the initial 15,000 tpy. Depeding on their strategy this initial plant can be put to work without developing a mine at La Blache. They could use feeds with higher TiO2 contents from any other sources, e.g. Brule has approx twice the TiO2 and other mines even have much better grades.

            The PEA for La Blache has some estimates for Capex and Opex, but if RGX decides to buy the feed instead of digging up the ore themselves then cost of mining would be eliminated (of course, one has to pay for the feed, but there could be some net savings). Similarly, transportation could be reduced if the processing facility is located near the source of feed.

            As a first guess, the cost for a processing facility near the source of feed could be something like $2000/t and with a selling price in the range of $4500/t (RGX corp presentation) the net profit would be about $2500/t x 15,000tpy = $37M/yr which is not bad for a "demo plant".

            Kindly check my math.

            goldhunter