Skip to content
Sign in

Post

First Mexican Gold Corp.

VEEP3.3 rating from 109 members1.3K ptsRate

Summer Doldrums

Well...inaction all across the Venture, cash strapped companies, vacationing investors, European woes....not exactly a lively summer.

FMG at .075 is a steal in my opinion.

I have money tied up in some other juniors, if I see some favorable results soon I intend to start buying a larger portion here, in part because I can average down, in part because I believe this project is amazing thus far. You never really know until the "truth machines" do their work, but from what Ive seen so far I dont think theyll do anything but confirm suspicions.

  • Diamond Drill Hole H30-03-09

    9.7 metres of 3105 silver equivalent g/t comprised of 9.70 metres of 6.22 g/t gold, 1853 g/t silver & 12.62% copper

This was an intercept from their best hole which was actually 37m in length. Lets do some quick math.

A troy ounce = 31.1 grams.

Gold = 1590.50/oz currently x 6.51 g = $332.31

Silver = 27.27/oz currently x 1853 g = $1624.80

Copper = 3.49/lb currently x 12.62% (252.4lbs) = $880.88

In total it = $2837.99/tonne

Just as they say in Vancouvers Downtown Eastside....this is some serious rock.

Theres a good chance that costs to produce this rock will be far, far, far lower....in fact Ill say itll be $100 and that will still be high, but this leaves us $2737.99/tonne of profit.

If these grades are occuring on the property its not a freak accident, these are bonanza grades, and theres probably more of them in the vicinity. This makes it extremely economic to produce, and moreover an absolute ton of profit involved. A few more good holes like this and we will definately catch some eyes.

This one is going places.

Rogue,

Join the conversation about First Mexican Gold Corp.

Reply