Skip to content
Sign in

Post

First Mining Gold Corp

Prez3.7 rating from 385 members21.7K ptsRate

GCU: cantjustread

Holding us down was the warrant expiry date Jan. 26, 2012.

Resource estimate to be expected within the next 4 weeks (my timeline).

Potential between 2M-5M oz. NI 43-101 with long term potential of 7M-10M oz.

Analysts 12-months targets between $3.50-6.84.

Presentation: http://www.goldcanyon.ca/i/pdf/ppt/CorporatePresentation.pdf

FANTOMAS

Join the conversation about First Mining Gold Corp.

Reply

Replies

  1. Pardon what might be an extremely stupid question from a novice Fantomas, but is this open-pittable? i.e. what about the water in the lake? If it isnt open-pittable then we lose all that high grade ore just beneath the lake bed, dont we?

    Thanks in anticipation of your answer,

    BRGDS - BW.

    1. Another "Lakie". Lol /// This lake is more like a big pond (15m depth). And yes, there are plans in place to partially drain the lake to get to the ore. /// Will definitely be done with a potentially 10M+ deposit. If they can move whole towns (Osisko), than a little pond shouldn't be an issue. Besides that, there is only part of that deposit under parts of the lake. FANTOMAS