Sisson scoping study
Plenty of conservative figures built in to the report's conclusions - the price of moly at $21/lb, a 20% ($70M) contingency in the capital cost estimates, potential for increased grade and tonnage make for a good outlook for the deposit.
Join the conversation about Geodex Minerals.
Reply