Skip to content
Sign in

Post

Geodex Minerals

The post this replies to is no longer available.

Prez3.5 rating from 37 members1.5K ptsRate

Sisson

For those of you familiar with the Britannia mining museum outside Vancouver - there is a dump truck by the museum's front fence. Rated at 220 tonne, price tag $3.4million in 2004. Sisson's suggested production rate of 20,000 tonnes per day is equivalent to 91 truck loads per day. Geodex will probably need 7 or 8 of these trucks to maintain production - that's $27 million capital cost for trucking alone at 2004 prices. But with a 2.7 year pay back period we can afford it.

Join the conversation about Geodex Minerals.

Reply