latest pictures of mill out...a true 1st class operation...very professional....must only be weeks away fro production...plus NR ...more gold

FRANKFURT: GIH) is pleased to report continued high-grade gold and silver

mineralization from step-out drilling including .75 meters of 31.7 g/t (1.02 ounce/tonne)

gold and 2920 g/t (93.88 ounce/tonne) silver. This intercept expands the La Arista

deposit vein system as it remains open in both strike and depth. La Arista is one of

GRC’s three high-grade deposits discovered to date at its El Aguila project in the state of

Oaxaca, Mexico. GRC targets production at its El Aguila Project in 2009, subject to

obtaining the remaining permits, regulatory approvals, equipment deliveries and

construction schedules.

The Arista deposit vein system appears to be a series of parallel, en echelon veins,

including the Arista vein, the Baja vein and additional parallel veins. This high-grade

system now extends over 585 meters of strike length and 400 meters of vertical extent.

Hole #109003 expands the La Arista vein system approximately 85 meters to the south

east from the previously drilled high-grade intercepts in Hole #108042 and Hole#109001

(see longitudinal section below).

Recent Arista Deposit drill highlights include:

Join the conversation about Gold Resource Corp.

Reply

Replies

  1. Conf call with good details...mill cost $29m and in budget,,,recent shares by Hochschild brings FD to 46M....and Hothschild to 24%...mgmt also 24%...with Totville at 15%.....mgmt ok with Hochschild to 40% if necessary....no fear of takover and with float limited and sp should jump.....permits submitted...no exact time when approved...but all steps taken....2nd pit being dev ahead of schedule to keep locals employed...a good citizen.