I'm not sure anyone really answered the questions the way they were originally posed. I'm going to maybe over-answer here, as I think that you can't have too much information.
Step 1: Field work and geophysics/geochemistry to find prospective drill targets. Starting from rock outcrop, or exposed rock from roadcuts or stripping or whatever, or from soil sampling, you use geophysics like magnetics or IP, or a local grid sampling of soil as used in the soil gas hydrocarbon method, to choose collar locations (the actual pierce point for the drill), and the azimuth and dip (the orientation for the drill). This work is ongoing, but it can take years to get to this point if you're starting from scratch.
Step 2: The drilling. At Golden Hope, they're averaging 70-80 metres of drill core per twelve hour shift, using one drill. Setting up on a new collar can take anywhere from a little under 2 hours, to much longer, depending on how easy it is to get at the collar location from the road, and the accessibility of water (required to be pumped downhole to cool and lubricate the bit).
Step 3: Logging and splitting of the core. Paul Nichols, the geologist doing the core logging for GNH, is a very experienced and knowledgeable geologist. He takes notes of everything he sees, and then transcribes those notes into his computer every night. He is constantly producing maps (plan views, i.e. looking down on the drill site as if from a vantage point in the sky) and sections (looking sideways at the drills piercing the deposit in a cut-away view), to try and understand what's being learned from each drill hole. In some situations, this information feeds back to earlier steps, as new collar locations might be added to the drill program. "The next hole" is a fluid concept, evolving and changing as the information comes in. Paul also marks the core for splitting, and the regions to be included in an individual sample. Within the quartz veining and the surrounding diorite, those are generally 1 metre sections. Two fellows work full time, sawing the core in half, and filling the sample bags according to Paul's instructions. Individual samples are assigned code numbers, and from that point onwards, the true source of that sample is blinded. Samples are sealed into containers, and shipped by secure methods to Actlabs in Ancaster for assay. This process takes longer than the drilling (in the case of Golden Hope), so there is a backlog right now. One hole can be drilled in a day (if they're going well), but it might take 3 days to log and split that hole.
Step 4: Assays at Actlabs. Golden Hope has set up a custom assay procedure, to meet the requirements of Jim Tilsley, as best to control for the nuggetty nature of the gold particles. Each sample has a mass of about 2.5 kg (for the metre-long sections of quartz/diorite). The sample is crushed to a relatively fine powder, and then put through a mesh screen (80 mesh) to sieve out larger particles. That would tend to catch the larger gold nuggets, so the oversize is assayed separately. The remainder is split, and each split is assayed. So, every sample gets assayed three times. Sample blanks (known barren rock) and check assays (samples prepared by Tilsley based on one of the Ascot hammer drill samples, for which he has meticulously determined the grade) are mixed in with the new core samples, for quality control/quality assurance purposes. Assaying would likely take 3-6 weeks, depending on the number to be done, and how busy the alb is with other work.
Step 5: There's a specific word for this next process, and it just doesn't come to mind, but the assays are returned identified only by code number. They have to be entered into a database and unblinded, to show exactly where the sample came from (which hole, and at what depth). One hole might have 100 samples, and each sample has 3 assays. It takes a long time to collate and interpret the assays. Then a human mind has to select an interval of that core, and do statistical calculations to determine grades over specific intervals, and weighted averages over wider intervals still. You can't do any of the stats until all the assays are back for any specific hole. Computer software makes it pretty straight forward, though.
Step 6: Public reporting of assays. This is usually done in the form of a news release. A Qualified Person (Jim Tilsley in this instance) has to review all of the steps, the calculations, the derived statistics, and make some kind of an intelligible report out of them. The assays don't come back from the lab in a format suitable for news release. No, a lot of work is required to create a news release.
Step 7: 43-101 Technical Report? I put a question mark there because we have a bit of a logistical problem. A resource estimate is a relatively simple calculation: grade times tonnage gives you metal in the ground. The tonnage here is no problem. The mass of a cubic metre of pure diorite or pure quartz are easily found, and an estimate of the mass of a mixture of them is relatively straight forward. However, the grade of the gold (in this instance) is not reflected accurately by the assay grades being returned by the diamond drilling program. The sample (the core) is just too small to provide accurate grades. Let me try and explain that.
Consider any book written in the English language. You're going to sample the book, by piercing it from cover to cover, to try and determine how many of the letter "e" are in the book. We know that the letter "e" is the most common letter in the English language, so we should have no trouble with that, right? Let's do a thought experiment. We'll pierce the book with a hair-thin "drill", taking a core sample from each page, from cover to cover. What are the chances that you even hit an "e" on any specific page? With all those other letters, and all the white space, the odds are pretty low. In fact, you might have pierced the whole book, and not hit a single one. Would it be reasonable to conclude that this English-language book does not contain any "e"s, anywhere? Nope, not from that tiny sample.
Now let's do a second sampling, but this time let's imagine that we are taking a core sample 1" (2.5 cm) in diameter, right through the book. I'm going to suggest to you that this might be an adequate sample upon which to estimate the number of "e"s on each page. And then when you collect that page data, and do some statistics, you could calculate a pretty reasonable estimate of the number of "e"s contained in the entire book. I think this larger sample would be an adequate sample size to do that work.
Now, while we're still thinking about that book, what if the letter whose frequency you were seeking to estimate was rather uncommon in the English language. An "x" say, or a "w"? How large a sample would you need to take to estimate the true number in that book? It's conceivable that you might need to take a larger sample than even that 1" diameter core, to get an accurate estimate. Each letter would have a specific sample size requirement.
Now, back to the diamond drilling at Golden Hope. Because the quartz is erratically deposited in the diorite, and the gold is erratically distributed in the quartz (as dicrete particles), we're far more likely to miss the gold particles than to hit them, even if there are lots of particles present in the local zone we're sampling. Each metre of core returns about 5 kg of rock. Jim Tilsley has estimated that, to get an accurate grade estimate of the gold contained in a specific metre of rock, he'd need a sample of between roughly 450 kg to almost 7000 kg, depending on how much quartz was present in the specific sample. To get a sample 450 kg/metre, you'd need to be drilling roughly 20" (50 cm) diameter core. Even if there was such a rig in existence, I don't know how you'd manage the logistics of sub-sampling a sample of that size, to accurately obtain a grade for each metre of core. It's just beyond the scope of economic reality to even consider trying to do that.
At present, it's reasonable to assume a significant under-estimate of grade from core sampling, using diamond drilling of NQ diameter (about 2"). If we come in at 2 grams/tonne, we might really have 3-5 gpt, or perhaps more. However, if you calculate a resource estimate using 43-101 guidelines, you're stuck with the 2 gpt, because you are only allowed to use the assays that you got back from the lab. The diamond drilling method that is the standard method used for these things is simply inadequate to accurately report the gold grade in this deposit. A 43-101 technical report will label us permanently with a specific grade, even though we know it's better than that.
If we can't do much about the nugget effect/grade underestimation problem, we aren't facing the same limitation on the tonnage aspect. We're presently proving up tonnage at a massive clip, with this year's drill program.
Now, about 43-101. 43-101 is a reporting standard, rather than a type of report. 43-101 is often misused that way. Every public report by any mining-related company must be in compliance with 43-101 reporting guidelines. Every press release, everything. But within the 43-101 guidelines is a clause with respect to prohibited reporting. If you've ever read the guidelines, you'd know they were written by geeks because this particular clause is actually about an exception to the 43-101 standards, i.e. an exception to the prohibitions. We can legally step outside the stringent reporting rules of the 43-101 if we state certain things explicitly. We can report a resource estimate (i.e. ounces of gold in the ground) on a conceptual basis, if we then state that the estimate is not 43-101 compliant, and that a Qualified Person has sufficient reasons/data to support the conceptual estimate. We're hoping to see such a conceptual estimate some time soon, but I wouldn't hold your breath waiting for it.
Lar