Skip to content
Sign in

Post

Golden Minerals Company

Prez3.4 rating from 92 members6.2K ptsRate

News

The final short form prospectus has been posted on SEDAR. Let's hope for an interesting week next week.

Join the conversation about Golden Minerals Company.

Reply

Replies

    1. Hi gwr1,

      In response to your: "Everyone should go to Sedar and read the section on exploration plans page 6.", can you kindly identify the document type or the filing date of the document you were referring to?

      I have had no luck at all in locating it.

      Thank you.

      1. Look for the final short from prospectus posted Jan 22, 2010. If you can access Stockwatch the document is easily accessible. Page 6 outlines some breakdown on the exploration program. The broad strokes call for 12,000 metres of drilling plus drifting, plus some further ramp development, etc.

        Final short form prospectus - English
        metals and minerals - mining

      2. Can't post the document for 3 reasons: don't see it on Sedar yet, it is 27 pages long, it is a pdf that I have, The page gwr was referring to is:

        The Company intends to use the estimated net proceeds of the Private Placement principally as follows:

        Exploration and development
        Underground deep drilling at Santa Juana.....................................................$1,600,000
        Drilling contractor, or 5,000 meters at $200/m...............................................$1,000,000
        1,000 samples assays at $50/sample.................................................................$50,000
        200 meters of drifts at $2,000/m.......................................................................$400,000
        Supervision by geologist and assistant for 6 months at $15,000/month............$90,000
        Various supplies, transport, etc...........................................................................$60,000


        Underground drilling at Santa Juana for north-western extension of veins.....$850,000
        Drilling contractor, or 3,000 meters at $150/m.................................................$450,000
        2,000 samples assays at $50/sample..............................................................$100,000
        100 meters of drifts at $2,000/m......................................................................$200,000
        Supervision by geologist and assistant for 4 months at $15,000/month..........$60,000
        Various supplies, transport, etc........................................................................$40,000

        Surface drilling at Terneras.................................................................................$550,000
        Drilling contractor, or 4,000 meters at $100/m ...................................................$400,000
        1,000 samples assays at $50/sample....................................................................$50,000
        Supervision by geologist and assistant for 4 months at $15,000/month...............$60,000
        Various supplies, transport, etc.............................................................................$40,000

        Mining and Milling
        Santa Juana Mine Equipment...............................................................................$800,000
        Two scooptrams at $250,000 each......................................................................$500,000
        One underground haulage truck..........................................................................$300,000

        Santa Juana Mine Equipment:
        Ventilation equipment..........................................................................................$100,000

        Chicago Mine Equipment:
        One scooptram....................................................................................................$250,000

        San Mateo Ramp:
        500 meters at $1,200/m......................................................................................$600,000

        Cyanide Leach Mill:
        for flotation cells..................................................................................................$250,000

        General Working Capital...................................................................................$6,347,042

        Total ...............................................................................................................$11,347,042

        Excuse the formatting - best I could do.

        lb