Question for argoz

Argoz

Need your input, please.

Back in the 1960’s, I was part of the operation of one of the largest mines in Canada. One of the things we were quite proud of is that the recovery of the secondary metals (PM’s) covered all operating costs.

By my calculations, using measured and inferred, ECU has approx. U.S. $1.5 billion potential total recovery of Lead (using 50% recovery) and Zinc (using 40% recovery ),using today’s pricing.

Based on today’s pricing, assuming present operating costs double to approx $1 million per month for 5000tonne/day mill, can operating costs be covered by base metal recovery alone?

At 5000 tonnes/day (320days/year), the recovery costs would have to be about $75.00/tonne, for base metals alone.

Good Luck to all!

Join the conversation about Golden Minerals Company.

Reply

Replies

  1. According to the NI43-101, the lead grade for the inferred sulphides is1.74% and its recovery is about 55%. The same zinc grade is 2.11% and its recovery is 45%. Current lead price is $1.21/lb and zinc price is $1.06. Using these grades, recoveries and prices, the base metal sales would be $47.72/tonne. At 5,000 tpd and 30 days per month,sales would be $7.16 million per month from the base metals.

    1. So, if Iread correctly, at 1500 tonnes/day, base metals would generate in excess of $2million/month. i.e. $24million/year and all gold and silver sales could potentially add to the value of the company (Paying admin. paying down liabilities and adding to bottom line)

      Sounds like fun to me!

      Good Luck to all!