Skip to content
Sign in

Post

Goldstone Resources

Replies

  1. Question: How many metres of drilling planned in 2010 by “GRC”?

    March 8, 2010, “GRC” states: --“In addition to extensive data evaluation and surface exploration across the area, Goldstone plans to carry out drilling on targets currently being identified from a review of historic records and correlation of recent drilling with analysis of the 2009 aeromagnetic survey results. A significant portion of this first phase of drilling will be directed at targets identified on the Leitch-Sand River property.”---.

    More than 70,000 metres of drilling planned in 2010 on the Hardrock project, operated under a joint venture with Premier (70%), Goldstone (30%). Four drills are currently active at Hardrock, testing both open pit and underground type targets.

    In 2009, more than 90,000 metres of drilling were completed at Hardrock, successfully identifying multiple open-pit and underground-style gold zones---.

    1. Purely speculating here, but last I checked we had somewhere around $9M cash. Assuming an average cost of $100/m we could potentially drill 90,000m. I doubt they would would want to exhaust all of the cash, so a conservative guess would be 50,000-60,000m of drilling.