FSR continuous operation update
Bernard, congrats again on the UL 1642 milestone and on the progress you’ve outlined on the fumed silica side.
With the recent discussion around AI- and data-center-driven infrastructure, it’s becoming clearer why scalable, lower-cost fumed silica could matter at a systems level (thermal efficiency, insulation, energy intensity), where material cost is small relative to overall operating and capital savings. At the same time, there also appears to be a quieter but potentially very large opportunity in industries like cement, where commercial-grade fumed silica is already used sparingly today, but where economics and scale have historically limited broader adoption despite the potential for significant volumes.
That context brings me to my question. With commercial-grade material now demonstrated in Test #7, many of us see stable continuous operation as the final major technical proof point before moving decisively toward a first commercial pilot plant using the current grade.
Without asking for specific timelines, can you share when investors might expect to hear whether continuous operation has been successfully demonstrated, either from the most recent runs or from follow-on testing currently underway? In other words, is confirmation of continuous runtime expected to emerge from the current phase of work, or does it require a distinct upcoming test campaign?
Thanks,
Claude
Join the conversation about HPQ Silicon Inc.
Reply