Here's how Darcel explained his method in the analyst report from Nov.2007

The estimate methodology:

• use summarized data for each drill sample reported (L105-1 through L106-57)

• multiply core length (m) x 625 (assume each core represents an area of 25m x 25m)

• multiple volume above x 3.5 (tonnes per m3)

• multiply tonnes x 2204 to achieve lbs. of Ni containing rock

• multiply lbs. Ni containing rock x avg. Ni grade to obtain lbs. Ni per core sample

• add all lbs Ni. from all core data, to obtain total lbs.

Join the conversation about Inspiration Mining.

Reply

Replies

  1. Good idea Beer, however the problem is we have not seen any deep drill results at North Zone. Deeper drills usually produce higher grades. So the inferred tonnage could be all over the map. The shallow open pit potential has lots of 25m spacing which should prove up a high proven number.

    Problem with the Darcel report is that its simply ancient history now as there are twice as many or more drill results since last Sept. There were 25 more drill holes completed in Q1 at North Zone alone. Those are still to be released. But I believe Micon will have access to those in their calculation.

    Also the North Zone has been increased if not doubled in size since Darcel. Will Langmuir One include the newly discovered ore bodies or just the 118 holes in the East Zone. I do believe no drills touched the West or Central zones, if I have that right.

    Plus what credit will be given to the exploratory holes (9 todate) plus they are drilling out the (30?) anomolies currently. Whatever the case the number will surprise most. The truth machine wins in the end.

    1. good points Cad - I guess I was just trying to come up with some estimates to give my friend. Some estimates I am hearing from the LBE camp are that the 43-101 is going to be showing only 3 million tons max from L2 and maybe 1 million from L1, and at grades below .6%. I think we can beat those estimates.

      BEER

      1. Well since opinions are worthless at this stage, shall I dare share mine. Lets start this game shall we.

        Langmuir One - proven = 3,000,000 t proven @ 1.5% grade, inferred a further 3,000,000 t.

        Langmuir North - proven = 15,000,000 t proven @ .6% grade, inferred a further 20,000,000 t with a grade there at 1.25%

        Langmuir South and Explore Holes - say 5,000,000 t inferred.

        That total is 46,000,000 t combined proven & inferred. I'm on record.

        I expect Whaler to keep track of this number. I guess the press release did not include South Zone and explore holes.

        If Darcel calculated 351 m pounds, we must be close to a billion by now one would think. You don't punch 250 holes in one area for nothing.



      2. Beer What was your friend smoking? Three million tonnes?? Thats probably on just two of the better holes drilled on Langmuir Two alone. Don't they realize just how many holes were drilled since 2005? Point six percent grade on the high side? They might want to review the drill data more closely. There were some pretty nice intersections touching 1.5% alone. Dang the waste rock of overburden is probably worth a tiny fortune. Drill cut off was .2%. That doesn't mean the whole thing will average .2%. Thats just the starting point.

        The much smaller deposits in the Shaw Dome todate are keeping the blinders on most people. Even if the in-fill drilling is complete now, I do believe the North Zone is still unknown to depth and length IMO. Someone may want to confirm that.

        How about them Dallas Stars? Nice try against my Wings. But look out for those Pens. Dang they look good.



        1. Cad - I know - my reaction was quite similar to yours re the tonnage estimate that I was given. Opinions are like behinds, everyone has one. I don't know what these people are basing their opinion on, but I do not see the point of doing a 43-101 if the amount of tonnage is only 3 million. I think LBE has proven this point - that there is no point doing a 43-101 for small tonnage amounts, the market doesn't care. This was one of the reasons I am coming here, to get some other opinions on what our tonnage will be. Whaler seems absent today, maybe he is watching VMS closely like some of us are today.

          I will also give my estimates - L1 - 8 million tons - (inferred and proven) at 1.1% grade, L2 - 36 million tons (i&p) at .7%. I am thinking/hoping that I am on the low side.

          Cad - the other mantra I am being given is that anything below .6% Ni is uneconomic to mine - any thoughts on this theory?

          BEER

          1. Knew there was something missing in my life today. It was Whaler!! Where is oh mighty Hub Leader?

            Thanks for sharing your number. I see you are very good at picking hockey pools and friends (lol). What lost soul thinks that .6% grade is uneconomic?

            Yeah, .6% of 1 million tonnes 500m deep is probably not worth it. Give me 10million tonnes at 30m deep with .6% grade and we're in business.

            Really Beer, what kind of people are you hanging around with that come up with this stuff??? Do they wear turtle neck sweaters? Now come on, be honest.

            Any idea of how long it will take to complete the 43-101? Hopefully its not like those "Crackjack" issued ones we see in the area. Those seem to be a dime a dozen. And only worth a dime.

        2. I got wiped out in my pool - I went down with the ship when the Stars went out. Gave it a good try now. Now my only hope is that Hossa scores 12 goals unassisted.