Re: Help!! ............estimate methodology?..next question

When the company started to report using true width etc

Should the calculation be looking at true width instead?

Drill Hole

From (m)

To (m)

Core Length (m)

True Width (m)

Core Length (ft)

True Width (ft)

Weighted Average Ni (%)

LS07-2

313.75

378.05

64.30

41.33

210.96

135.60

0.820

and

313.75

354.00

40.25

25.87

132.05

84.88

0.224

and

354.00

366.00

12.00

7.71

39.37

25.30

0.328

and

366.00

377.00

11.00

7.07

36.09

23.20

3.596

and contains

366.95

372.40

5.45

3.50

17.88

11.48

6.453

with

366.95

368.00

1.05

0.67

3.44

2.20

4.380

368.00

369.10

1.10

0.71

3.61

2.33

3.865

369.10

370.20

1.10

0.71

3.61

2.33

4.635

370.20

371.30

1.10

0.71

3.61

2.33

9.070

371.30

372.40

1.10

0.71

3.61

2.33

10.220

and contains

372.40

373.20

0.80

0.51

2.62

1.67

1.085

and

373.20

373.90

0.70

0.45

2.30

1.48

1.995