Well there are some fare questions I think. I don’t pretend to know everything there is about mining so I guess the best answer is. It depends. That’s why a mineral resource calculation is so important because it gives you a total estimate of how much is actually there. From there you go to a feasibility study to determine if the ore body can be mined economically and how to go about it.
For open pit mining, I have heard low side numbers of 0.4 to 0.6% kicked around which sounds reasonable. For deeper mining methods like ramp or shaft its anyone’s guess and depends on so many factors, higher grade with low tonnage can be as attractive as low grade with high tonnage. Its all about economics.
The 5.89% grade in the drill cores around Langmuir 1 is very exciting for a couple reasons. First it is fairly shallow therefore cheaper to extract. Second and really important is the fact that there is already a mine there, therefore even cheaper to get at from existing works once it is dewatered.
Langmuir 2 is equally exiting because there is a shallow lower grade (around 0.6%) ore body sitting on top of a deeper higher grade ore body. This ore body is, as yet, open at width and depth therefore the potential is huge and we are starting to get a peak just how big with recent drill results.
The Darcel report of Oct 2007 identified 351M pounds. IMHO the combined ore bodies of L1 & L2N will exceed 500M pounds with potential for 1B. Now if you want to really get pie in the sky, but based on known anomalies, the area between L1 & L2N also hold good potential for a continuous system of smaller ore bodies. In that case the numbers get out to lunch real quick so there is no point making estimates until more drilling is done.