INSPIRATION CONTINUES TO PROVE OPEN PIT


FOR IMMEDIATE RELEASE
August 1, 2006 TSX Venture – ISM
Frankfurt—OI8

Toronto, Ontario - Inspiration Mining Corporation (the "Corporation") is pleased to announce the results of the continuation of their diamond drilling program on its Langmuir Project, located in Langmuir Township south of Timmins, Ontario. The Langmuir Property consists of 69 unpatented contiguous mining claim units covering approximately 1090 hectares in the north-central portion of Langmuir Township, Porcupine Mining Division, and District of Cochrane, Ontario. The property is approximately 25 km southeast of Timmins, Ontario, and hosts the past producing Langmuir No.1 Mine, and majority of the past producing Langmuir No. 2 Mine.

Inspiration continues drilling the Langmuir Project – Langmuir No.2 Mine North Zone, which is located from approximately 80m to 536m northeast of the mine shaft.

The following assay results are from drill holes LN06-28 and Ln06-31, inclusively that were drilled 7m south of the North Zone Section 38+00m North. Drill hole LN06-28 and LN06-29 were drilled approximately 32m and 19m, respectively, up-dip of previously released LN05-21, while LN06-30 and LN06-31 were drilled down-dip of LN05-22 approximately 12m and 36m, respectively. The following table indicates the drill information for these drill holes.

Drill Hole

Grid Northing

Grid Easting

Dip

Azimuth (ast)

Section Northing

Section Easting

Length (m)

LN06-28

3263.30

1934.40

-50.00

300.00

3793

43.6

47.00

LN06-29

3255.20

1948.40

-49.74

300.00

3793

59.8

64.78

LN06-30

3240.70

1972.50

-63.16

300.00

3793

87.6

127.86

LN06-31

3234.10

1984.90

-63.79

300.00

3793

101.9

151.90

Inspiration has received, compiled and condensed the assay results for LN06-28 to LN06-31 as following:

Drill Hole

From (m)

To (m)

Core Length (m)

True Width (m)

Core Length (ft)

True Width (ft)

Weighted Average Ni (%)

LN06-28

24.83

44.00

19.17

15.72

62.89

51.57

0.620

and contains

31.85

41.00

9.15

7.50

30.02

24.62

0.943

includes

33.45

37.10

3.65

2.99

11.98

9.82

1.445


Drill Hole

From (m)

To (m)

Core Length (m)

True Width (m)

Core Length (ft)

True Width (ft)

Weighted Average Ni (%)

LN06-29

28.90

59.90

31.00

25.73

101.71

84.42

0.401

and contains

28.90

30.80

1.90

1.58

6.23

5.17

0.583

and

34.55

42.50

7.95

6.60

26.08

21.65

0.314

and

42.50

59.04

16.54

13.73

54.27

45.04

0.514

includes

42.50

45.20

2.70

2.24

8.86

7.35

0.664

50.00

59.04

9.04

7.50

29.66

24.62

0.605

50.00

55.00

5.00

4.15

16.40

13.62

0.584

57.45

59.04

1.59

1.32

5.22

4.33

1.352

LN06-30

66.75

110.75

44.00

29.66

144.36

97.30

0.374

or

76.20

110.75

34.55

23.29

113.35

76.40

0.383

and contains

66.75

77.20

10.45

7.04

34.28

23.11

0.380

and

87.40

110.75

23.35

15.74

76.61

51.63

0.436

includes

87.40

90.10

2.70

1.82

8.86

5.97

0.572

91.80

94.40

2.60

1.75

8.53

5.75

0.451

97.10

109.80

12.70

8.56

41.67

28.08

0.500

or

101.20

104.90

3.70

2.49

12.14

8.18

0.777

LN06-31

107.00

136.80

29.80

19.76

97.77

64.82

0.688

and contains

107.00

122.80

15.80

10.48

51.84

34.37

0.879

and includes

107.00

111.50

4.50

2.98

14.76

9.79

0.967

with

107.00

108.00

1.00

0.66

3.28

2.18

1.250

109.05

109.70

0.65

0.43

2.13

1.41

1.015

and contains

110.45

111.50

1.05

0.70

3.44

2.28

1.405

111.50

116.13

4.63

3.07

15.19

10.07

0.555

116.13

122.80

6.67

4.42

21.88

14.51

1.045

or

118.00

121.00

3.00

1.99

9.84

6.53

1.268

and

126.00

136.80

10.80

7.16

35.43

23.49

0.688

127.00

131.43

4.43

2.94

14.53

9.64

0.769

with

128.95

129.80

0.85

0.56

2.79

1.85

1.050

Drill hole LN06-28 collared into the bottom half of the nickel mineralization of the North Zone. The vertical depth of the overburden at this location is approximately 19.0m.

The nickel bearing sulphide mineralization, with estimations ranging from 1% to 20% fine grained disseminations and sulphide blebs up to several centimetres in size, is contained within serpentenized to talcose serpentenized komatiitic ultramafic extrusive flows with occasional spinifex texture.

The assaying technique used is the industry standard for base metal assaying, which uses nitric and hydrochloric acids that extracts nickel only from sulphide mineralization and not from nickel silicate minerals.

The assaying of sawn core samples was conducted by Swastika Laboratories, and included the insertion of blanks and standards. The Qualified Person in charge of the Langmuir Project and the person who prepared the technical data in this release is Kian Jensen, B.Sc., P.Geo. (Ont).

For further information, please contact Randy Miller, President of the Company, at tel: 905.853.7400, www.inspirationmining.com

For Investor Relations call:

Gale Capital Corporation
Ph. 604.221.7604
Fax 604.221.7606
[email protected]

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Join the conversation about Inspiration Mining.

Reply

Replies

  1. From the filings (Pg. 8 of the Dec 29 AIF) just released, Note that in the filings some references to drilling are made for June 2007 and back as far as Dec 2006. So to use the term "end of summer" in the quote, keep this in mind.

    The diamond drilling at the Langmuir No.2 Mine – North Zone has indicated a long and broad nickel bearing mineralization zone containing 3 possible distinct komatiitic extrusive flows in a paleo-topographic depression with the higher-grade mineralization generally located in the basal flow but also located in the middle and upper flows.

    The majority of the drilling was concentrated to a depth of 100m below surface on approximately 25m centers.

    The deepest intersection was at a vertical depth of 230 m below surface with the pierce point of the zone at a depth of 150m.

    Due to the continuation of the mineralization at depth and the potential for continued mineralization extending to the northeast of the identified mineralization, the Company plans to initiate a deep drilling program at the Langmuir No. 2 – North Zone by the end of the summer and continue exploration drilling along the northeast extension.

    With the current land position and boundaries, the mineralization identified in the North Zone could be accessed by open pit to a depth of 200m with deeper mineralization accessed via ramp.

      1. Thanks Whale, again. So its 200m deep for the planned open pit potential. Thought it could be more, but thats about 600 ft deep already. Not that ISM will be doing it. Right.

    1. From the filings (Pg. 8 of the Dec 29 AIF) just released, Note that in the filings some references to drilling are made for June 2007 and back as far as Dec 2006. So to use the term "end of summer" in the quote, keep this in mind.

      With the current land position and boundaries, the mineralization identified in the North Zone could be accessed by open pit to a depth of 200m with deeper mineralization accessed via ramp.

      Whaler could you tell me what previously supported technical report supports this claim?

      1. Wanderer I quoted from a Sedar Filing as you saw posted , as for "technical reports" I can try and look to see if there is something saying the same thing.

        Have a great weekend

      2. This is simply my opinion and likely others (Darcell included) as well, but the drill results and depths drilled suggest open pit mining is feasible. The technical report I read, which consists of 138 pages, is good. The appendixes at the back show some good drill results and keep in mind that was almost 2 yrs ago.

        Much of the reported drilling was only to 100 meters as well. Can I go out on a limb and label these finds as "near surface"?

        Nowhere in the report does Kian openly mention anything about mining methods or does he go any further re: economics etc.

        I look forward to Micon confirming what the company refers to in their latest Sedar filings re: open pit status.

        http://agoracom.com/ir/Inspiration/n...

        "TORONTO, ONTARIO--(Marketwire - May 16, 2008) - Inspiration Mining Corp. (the "Corporation") (TSX:ISM)(FRANKFURT:OI8) is pleased to announce it has commissioned Micon International of Toronto, Ontario, Canada to prepare a mineral resource estimate, a preliminary economic assessment (commonly referred to as a scoping study) and technical report on its Langmuir property. It is anticipated that the project will be undertaken in the following phases:

        Phase I - Mineral resource estimates for Langmuir No. 1 in preparation of a bulk sample and mineral resource estimates for Langmuir No. 2. The mineral resource estimate will include Trend Analysis, Cut-Off Grade Estimates, Compositing, Bulk Density Review, Block Model Construction and Validation, and Open Pit Optimization for Langmuir No. 2.

        Phase II - Preliminary economic assessments examining the potential economic viability of each zone of mineralization. This assessment will contemplate excavation of the mineralization at the Langmuir No.1 deposit by means of underground mining methods, and the excavation of the mineralization at the Langmuir No. 2 deposit by means of open pit mining methods. The results of the mineral resource estimates and preliminary economic assessment will be compiled in compliance with National Instrument 43-101."



        1. Thanks for trying to find it Whaler.

          Phase II - Preliminary economic assessments examining the potential economic viability of each zone of mineralization. This assessment will contemplate excavation of the mineralization at the Langmuir No.1 deposit by means of underground mining methods, and the excavation of the mineralization at the Langmuir No. 2 deposit by means of open pit mining methods. The results of the mineral resource estimates and preliminary economic assessment will be compiled in compliance with National Instrument 43-101."


          Hopefully you will see the technical report soon to support the open pit mine.