In the Micon Report, they mention ISM can open pit on both the L-1 and L-2 properties. I have no concern regarding what ISM can do with the L-1, but the L-2 is a different story. Considering LBE owns the properties directly adjacent both west and south of the major part of the drilling results of L-2’s Micon Resource Report; and the Nighthawk Lake boundary is adjacent on the Eastern boundary of the ISM claim, it is my opinion there very well could be problems with ISM getting at the full resource without possible encroachment.

The concern has been brought up many times over the years, yet I don’t think fully answered. In a previous AIF, the company said they could Open Pit on the L-2 to two hundred meters within their current property boundaries. When that statement was challenged, ISM then had to make “restatements” in the AIF. The above 200 meter statement was then deleted with no further explanation from the company why this was done.

There is only a limited amount of meters across the small ISM claim that holds the major portion of the Resource defined in L-2. It is easy to work out what those meters are. With LBE’s property lines both West and South of this claim and the Nighthawk Lake Boundary on the East, it is my opinion that ISM will have a very difficult time centering the Pit over the ore body to get the maximum extractability of the full % of the Resource without encroachment or at least loosing a potion of that resource. That is not to say deals cannot be worked out, but it is a major concern for some that have an investment in ISM and they should have the reassurance from management there is no issues here. It should be an easy question for ISM management to answer now that they have had many years working on this property.

Is the set back of property boundaries 6 meters or 60 meters due to the underground workings in the area of both properties? How wide will the road allowance have to be around the pit including the berm? How many meters across at the top of the pit will it have to be, if one is going down on a slope to two hundred meters deep. This small property will have much overburden to remove. How far away will this material have to be hauled to leave room to work the pit if ISM is squeezed by others boundary lines?

The real issue is; can ISM center a two hundred meter Pit over the resource within its current boundaries without encroachment. Any portion or (%) of the Resource that may be left out because of this problem could greatly affect the financial viability to extract.

Can management be questioned to give a 100% certainty ISM can center the pit to take 100% of the resource in a two hundred meter pit without encroaching on others property boundaries? This is a question I think would be appropriate to ask at the AGM and I would ask that it be included on the list.

Best

Nickel77

Join the conversation about Inspiration Mining.

Reply

Replies

  1. "Can management be questioned to give a 100% certainty ISM can center the pit to take 100% of the resource in a two hundred meter pit without encroaching on others property boundaries? This is a question I think would be appropriate to ask at the AGM and I would ask that it be included on the list.

    Best

    Nickel77"

    Be interested in hearing their answer as well Nickel, and it's a question that has been on many peoples minds given the LBE claims etc. Tough part will be turning this information into a readers digest version question for the AGM group to chew on. Be nice if the new Geo was there in attendance as Mr. Millers "technical advisor"

    For reference I will include the exploration drill hole map that was in the Micon report and another hybrid out of the photo library from here, so people know where those LBE claims lie. Sorry about this tiny font as well ......

    1. Here's a reminder for those going to the AGM of what was anticipated to be in the Micon study that was commissioned some 2 yrs ago. Might want to ask about what was not delivered or are we still awaiting other phases?

      **********************************************************************

      "TORONTO, ONTARIO, May 16, 2008 (MARKET WIRE via COMTEX News Network)—Inspiration Mining Corp. (the “Corporation”) (TSX: ISM)(FRANKFURT: OI8) is pleased to announce it has commissioned Micon International of Toronto, Ontario, Canada to prepare a mineral resource estimate, a preliminary economic assessment (commonly referred to as a scoping study) and technical report on its Langmuir property.

      It is anticipated that the project will be undertaken in the following phases:

      Phase I – Mineral resource estimates for Langmuir No. 1 in preparation of a bulk sample and mineral resource estimates for Langmuir No. 2. The mineral resource estimate will include Trend Analysis, Cut-Off Grade Estimates, Compositing, Bulk Density Review, Block Model Construction and Validation, and Open Pit Optimization for Langmuir No. 2.

      Phase II – Preliminary economic assessments examining the potential economic viability of each zone of mineralization. This assessment will contemplate excavation of the mineralization at the Langmuir No.1 deposit by means of underground mining methods, and the excavation of the mineralization at the Langmuir No. 2 deposit by means of open pit mining methods. The results of the mineral resource estimates and preliminary economic assessment will be compiled in compliance with National Instrument 43–101."

    2. A further question (if not already mentioned). Will or can the NSR that was purchased for $2,000,000 US be reimbursed to Metal Mines before it is spun out to its shareholders?

      There was absolutely zero reason for this to occur unless the property was going to be sold to someone who had the capability to place it into production. Since that has obviousely not happened, so the monies should be returned.

      To add to this, if someone can then ask who owns any or all of the NSR's on the Desrosiers/Cleaver/Douglas and even Barton projects since they will continue to remain in the Inspiration stable. Any arms length shenanigans that investors should be aware of?

      Lets just say that Gale Capital is playing dumb on this one.

      Thanks

      1. The whole group is playing dumb i'm afraid. I'm coming to the impression that there isn't really any value in the property....management knows, and now they are stalling as long as they possibly can. Hence the spin - out. It made NO sense at all...... why complicate things if you dont need to. I just hope that miller and the lot of em are ousted. Thats all i can say.

        P.S, I LOVE how they compare performance on ISM versus the average TSX return...... hahaha, what a joke.

        Dead cats don't bounce