Whaler,

Keep after it. Those of us who are ISM stockholders appreciate it, and the only ones complaining about your work are not ISM stockholders.

With regard to the anticipated 'update' of the 43-101, I have the following expectations and opinions, but don't presume to speak for other ISM stockholders.

The NR from Ian in mid February indicated that an updated 43-101 was anticipated in 90 days. To me the word updated is a key word. I believe that word means to revise something due to new data or conditions.

Based on that I expect the indicated resources assigned to L1 an L2N to be revised due to additional drilling, price changes or some other change.

There has been some drilling on L1, which should result in some increase there. I do not believe there has been any additional drilling at L2N. The price increase of Nickel since the original report should result in some increase, but based on a review of the Price Sensitivity in the Micon report it will not be substantial.

I, for one, will be very susprised if the Indicated at L1 and L2N are increased by 50%.

There has been more drilling in the NW on the Allertson area, as well as additinal drilling on an area between L1 and L2. When those are added to Exploratory holes in those areas, it will probably not be enough data to bring the resources in those areas to Indicated status, but will be sufficient to be counted as Inferred.

Because of the size of the Allertson area, if these additional areas are not able to be included in the Indicated category, I am expecting the Inferred range to double

With regard to Phase 2 of the Micon charge, I believe it is way too early to try to make those calculations. Allertson needs to be finished to determine if it is truly larger than L2N. It would then be the place to start for Phase 2. Because of the possibility of open-pitting all of these areas, their locations in reference to each other could effect the pit designs and possibly the order of selection.

With regard to L2N, without an agreement with LBE, the pit would have to stay away from that boundary, and at this time the Phase 2 results would include only the resources that could be recovered while complying with this limitation.

While this boundary issue is a limitation on the southern end of ISM's L2N area, boundary issues are probably close to a prohibition on LBE's recovery from L2. L2 is a collapsed mine and would probably not be available for re-entry for underground mining. I would think it would be susceptible to open pit operations in the same fashion as one of LBE's current operations and as proposed by MIcon for L1. Due to the size of that claim, and being surrounded on four sides by ISM, an open pit is probably not possible without some resolution of this issue.

So, while cooperation on the boundary issue would be helpful for ISM, it is probably essential for LBE to be able to mine their claim.

Join the conversation about Inspiration Mining.

Reply

Replies

  1. Wildcatter,

    What a surprise! Someone from ISM has finally considered that the boundary issues I have brought forward many times over the years that surround ISM’s L-2 could very well be a big headache for ISM’s progress with this promoted Company Maker Property. Could this be the real reason ISM has done none of the recommended drilling Micon put forth in their last Ni 43-101? I don’t know why you would suggest this is an issue for LBE though, as LBE has never had any intention to ever mine their portion of the L-2. It is too small a property to do anything with, not to mention the issues of low grade recoverability % of the L-2 mineralization. Financially, those grades don’t work for LBE’s Mill and they need much higher grade average from their projects; something of which the L-2 just doesn’t have by the information supplied by the last ISM Micon Ni 43-101 Resource Report.

    With LBE holding the “ace” card with their two properties on the west and south side of ISM’s L-2, along with the Night Hawk Lake boundary being on the east side, there is not many meters for ISM to work with to even contemplate putting in a pit that can get to the substantial part of the Resource defined to date. Bring up the property "1213131" the L-2 sits on and you will clearly see how small this claim really is. Try centering the pit over the Resource defined within the property boundary, then think of the road allowances needed, the angles of the pit, the Night Hawk Lake etc. Simply put, the way things sit now, in my opinion, ISM is in a complete stand still and will not be able to do a thing with L-2 unless LBE gives their okay, and no doubt it will be on all of LBE’s terms, if ever.

    I wouldn’t needlessly worry or concern yourself on the boundary issues at this point though. Only one question needs to be answered with the L-2 and L-1 projects. It all comes down to recoverability % of the low grade. In my opinion, and after such a long wait, if ISM doesn’t show the recoverability % of the major part of the L-2 and L-1 low grade Resources in the upcoming Micon Ni 43-101, investors will have been given a sure sign ISM management has no confidence in these projects going forward.

    Best

    Nickel

    1. Interesting mine/s indeed, So much production and history. Select clips from the Micon Report. Wildcatter I can't even guess what an updated resource report would look like.

      **********************************************************************

      "In the 1970-73 period, a 446 m deep shaft and a flotation mill were constructed on the property. Production from the Langmuir #2 deposit in the period 1973-78 amounted to 1,133,750 tonnes grading 1.45% Ni. In 1976, a decision was made to develop the Langmuir No.1 deposit as a supplementary ore source to the Langmuir No.2 mine. The Langmuir No.1 deposit was accessed by a 1250-foot long 12 foot by 15-foot ramp, which stopped 400 feet short of the deposit. Noranda ceased underground development in 1977 due to “deteriorating economic conditions at the Langmuir No. 2 deposit”.

      Timmins Nickel Inc. developed the Langmuir No. 1 Mine, with assistance from Ontario Mineral Incentive Program (OMIP) grants in 1990 (OMIP Grant OM90-118) and 1991 (OMIP Grant OM91-098). Under OMIP Grant OM90-118, Timmins Nickel completed the dewatering of Noranda’s 1,250- foot (381m) long ramp, extended the 12 foot by 15 foot ramp for 400 feet (121.92 m) to the 315 foot mine level, completed 4,652 feet (1,417.93 m) of underground diamond drilling, and metallurgical and ore compatibility studies."

      **********************************************************************************************

      1.11 ADJACENT PROPERTIES

      "As discussed above, Inspiration Mining’s Langmuir North and Langmuir No. 1 deposits are located along the south eastern portion of a geological structure known as the Shaw Dome. The package of rocks that contain Inspiration’s two nickel deposits have long been known to be favourable hosts for nickel mineralization, and production of nickel in this area has taken place from the Langmuir No. 1 and the Langmuir No. 2 mine (both contained either within or immediately adjacent to Inspiration’s mineral claims and the Liberty Minerals Inc.’s (Liberty) Redstone and McWatters mines located to the west of Inspiration’s land holdings. In addition to these properties that have hosted nickel production in the past, new nickel discoveries have been found beginning in 2007 by Golden Chalice Resources Inc’s (Golden Chalice) to the south of Inspiration’s land holdings."

      *********************************************************************************************

      "Mineral resources for the Langmuir North nickel deposit:

      The mineral resources are estimated at 8,324,000 tonnes grading 0.40% Ni. Micon believes that sufficient information is available to classify the mineral resources in the Indicated Resources category.

      Mineral resources for the Langmuir No. 1 nickel deposit:

      The mineral resources are estimated at 1,733,000 tonnes grading 0.51% Ni. Micon believes that sufficient information is available to classify the mineral resources in the Indicated Resources category."\

      **********************************************************************************************

      1. From the Micon study it would seem we are at an early stage for certain details as underlined below.

        "17.1.3 Cut Off Grade

        Given the relatively early stage of the Langmuir North deposit exploration and development history, no studies have been undertaken that contemplate potential operating scenarios and limited information is available for such items as metallurgical recoveries and smelting/refining terms.

        For the purposes of this assignment, a conceptual operating scenario was developed wherein nickel-bearing material was contemplated to be excavated using open pit mining methods and a nickel concentrate to be produced at a plant located on the property which employs a flowsheet incorporating a flotation process to generate a nickel-rich sulphide concentrate. This concentrate would then be transported to a domestic smelting/refining complex. This conceptual scenario will likely change as more information becomes available for this deposit.

        The price of nickel is cyclical, responding to the supply and demand relationship and influenced to a degree by market speculation and technical analyses. The nickel metal prices have varied widely since the year 2000, have recently retreated from record high levels and more recently have recovered from dramatic lows. Given the cyclical nature of metal prices it is not reasonable to utilize the metal price at any one point in time, as it is certain that the price will change in the future. While history has shown that it is impossible to predict what the future metal prices will be with a high degree of accuracy, a reasonable alternative is to utilize the average metal price over a time period rather than using the metal prices at the close of any particular business day.

        In light of the fact that the prices of nickel have now retreated from their peak prices, the use of trailing averages may result in values that are above the current spot prices – a situation that is clearly inappropriate. In the absence of a more formal metal price forecast, on a cost of- production basis, Micon believes that an appropriate choice of a long-term nickel price for the purposes of an initial mineral resource estimate is USD$8.00/lb.

        Given the early stage of the project’s history, no detailed information is available in respect of many of the important input parameters required to prepare an accurate cut-off grade estimate such as operating costs for mining, processing and general and administration, metallurgical recovery, smelter accountabilities, freight and refining charges, and the like in respect of a potential open pit mining operation.

        Consequently, Micon derived estimates for these items on the basis of its experience in the region and from general knowledge as shown in Table 17.2. It is to be noted that the estimates presented below are presented only for the purpose of developing an initial domain model, open pit optimization and reporting criteria, and the assumed values will likely change as new information is obtained as a result of further work."

        1. Cut Off grade at L1 is practically the same write up on pages 146 and 147.

          "Given the early stage of the project’s history, no detailed information is available in respect of many of the important input parameters required to prepare an accurate cut-off grade estimate such as operating costs for mining, processing and general and administration, metallurgical recovery, smelter accountabilities, freight and refining charges, and the like in respect of a potential open pit mining operation."

          ..........assumed values will likely change as new information is obtained as a result of further work."

    2. Some reference maps for those who want to look at the areas being talked about.

      Langmuir North Drilling Map:

      http://www.inspirationmining.com//files/107.pdf

      Also are the claim maps if you interested in looking at the claim 1313131 that Nickel77 refers to. Add the fact that adjoining ISM claim 1313130 (on the east side of 1313131) has substantial VTEM anomalies (shown as N4) and drilling as well.

      http://www.inspirationmining.com//files/24.pdf

      VTEM Targets at Langmuir North

      http://www.inspirationmining.com//files/72.pdf

      For visual references so you can get your bearings, it looks like the old settling ponds lie northerly in ISM claim 1213414 and the drilling seems to run below this down to

      I found it easiest to pop between these two maps once they are upan area close tot eh "cave in" showing blue water and "waste dump" at the bottom left corner. This drilling map showing the boundary to the west and south.

      Drilling: http://www.inspirationmining.com//files/107.pdf

      Claims: http://www.inspirationmining.com//files/24.pdf

      1. whaler,

        "Also are the claim maps if you interested in looking at the claim 1313131 that Nickel77 refers to."

        When and where did Nickel77 refer to claim 1313131?

        Your statement above is about as much use as when you supply only half the depth chart for your friends, or for those without access.

        As I've always said, if one has trouble keeping the minor details straight, then what chance does one have with the major details :

        Following are some excerpts of what Nickel77 posted. Take notice of what he actually refers to :

        Whaler, you have posted all other ISM drilling data on the latest map, but you have forgotten to show the most important drilling data that has taken place on L-2. L-2 is where 85% of ISM’s Micon Resource Numbers come from. In the far right hand side of your map you will note ISM claim number # 1213131. If you could show that claim up close with the drill holes to date, I would think that would help many ISM shareholders understand where the majority of the Resource outlined in the Micon Ni 43-101 comes from.

        http://agoracom.com/ir/Inspiration/forums/discussion/topics/475676-whats-not-to-like/messages/1535335#message

        With LBE holding the “ace” card with their two properties on the west and south side of ISM’s L-2, along with the Night Hawk Lake boundary being on the east side, there is not many meters for ISM to work with to even contemplate putting in a pit that can get to the substantial part of the Resource defined to date. Bring up the property "1213131" the L-2 sits on and you will clearly see how small this claim really is. Try centering the pit over the Resource defined within the property boundary, then think of the road allowances needed, the angles of the pit, the Night Hawk Lake etc. Simply put, the way things sit now, in my opinion, ISM is in a complete stand still and will not be able to do a thing with L-2 unless LBE gives their okay, and no doubt it will be on all of LBE’s terms, if ever.

        http://agoracom.com/ir/Inspiration/forums/discussion/topics/477609-43-101-expectations/messages/1538747#message

        As I'm typing this so far three (3) posters have taken the time to give your post referring to the wrong claim number a thumbs up, but not one of them has bothered to take the time to correct you. I can't decide if that falls into the category of a "funny story" or a sad one.



        nickel77

        Reply in Inspiration Mining

        Whaler and Aatooz, You two seem to be getting sidetracked somewhat. They Company Maker Property has always been Langmuir # 2 and that hasn’t changed. That is what the upcoming Micon Ni 43-101 is supposed to report on and what shareholders have waited several years for. The lat...

      2. Thanks for pointing out the typo on both claim #'s Surething. I am only human and have made errors typing in the past. Heck just read that last paragraph of typos and bad typing that you have quoted!!

        One too many three's in both cases. Anyone actually looking at the claims map and our reading the descriptions by me and or N77 would know it as well and realize the gaffe.(probably like the three posters giving it the thumbs up)

        Also for our viewing audience there are/is no deliberate attempts to mislead at hand, simply a typo :)

        At least I have the claim # right for the old settling ponds.

        Cheers

        1. "I found it easiest to pop between these two maps once they are upan area close tot eh "cave in" showing blue water and "waste dump" at the bottom left corner. This drilling map showing the boundary to the west and south."

          That actually translates to "up and are close to the"

          Pretty sloppy hey?

          PS when I do post only half the depth, namely the asks, I try to make darn sure that is accurate, I do miss the odd "s" left for instance on "1 orders" when I update.

          My bad when that happens too.

        2. whaler,

          I'd just finished up my crying with laughter session when I read your typo error claim. Perhaps you could also clairfy if it was typing error(s) that led me on yet another ISM wild goose chase the other night.

          In a recent post of yours you advised :See page 228 of Kian's 43-101 for the table showing the assays of the exploration drill holes."

          http://agoracom.com/ir/Inspiration/forums/discussion/topics/475676-whats-not-to-like/messages/1535665#message

          I noticed you didn't include a link to the page so I was intrigued. I went to the Link Library that you are so fond of telling us to use. I assumed you must be referring to a link titled "Sept 2009 Technical report on Langmuir."

          I opened the link, and low and behold the report finished on page 226. Umm thinks I what gives. Decided to waste no more time there, and headed straight to Sedar. I found the same document that I'm still assuming you are referring to, and low and behold the last page of the document was also numbered 226.

          I'm not sure if "See page 228 of Kian's 43-101 for the table showing the assays of the exploration drill holes." when what I think you were maybe trying to convey should have been "See page 116 of the Technical Report Of The Langmuir Property Shaw Dome Area NTS 42N/06. An Update As Of September 1, 2009, for the table showing assays of the exploration drill holes" really qualifies as a typo, but I'll let you decide!

          Seeing as how you provided no link it could just be that all my assumptions are wrong and somewhere out there is a page 228 of Kian's 43-101 with a table showing assays of the exploration drill holes, but for the life of me I haven't found it yet.

          Also for our viewing audience, could you perhaps recall any questions I've asked recently that would warrant an e-mail to the company. As per your following statement:

          As such, I don't think it is my job as a hubleader (which has no job decription, contract or wages) on a stock forum to gather up the questions of Nickel77, Surething, Heatseeker, or yourself and seek out answers by calling the company and or contacting IR.

          TIA.

          PS It wasn't a typo the (3) was just for added emphasis!

          whaler

          Reply in Inspiration Mining

          Exploration drill holes IMCEX 23 (48M or .56% and 10M of 1.58%) and 52 (25 M of 1.44%) had some pretty decent results albeit a little deep. Note the location in proximity of these two holes See page 228 of Kian's 43-101 for the table showing the assays of the exploration drill...

          1. Surething Re: Kian's 43-101

            I must say I am pleased there are indeed some shareholders reading my posts here. At times it feels like I am the only investor on the stock board. Again like the earlier post which caught my typo on the ISM claim number, thanks for pointing out a possible source of confusion for anyone who may have indeed been following up on the quoted post.

            **********************************************************************

            From the ISM website, here is the link to the report

            http://www.inspirationmining.com/news.html?id=113

            Here is the link to the PDF report I referred to. I also have it saved on my own PC for reference when need be.

            http://www.inspirationmining.com//files/inspirationtechreport.pdf

            As far as I know, and still see it now in the same manner, the exploration hole drilling assays come up on my Adobe reader/s as showing a file having 228 pages which is displayed in the uppermost task/tool bar. The table in question shows as being on page 228 of 228 on my "reader". I see now that in looking closer, the actual written page that has evaded you, is numbered as 226. Yet at the top of my Adobe reader, it shows as page 228 of 228.

            "See page 228 of Kian's 43-101 for the table showing the assays of the exploration drill holes."

            http://agoracom.com/ir/Inspiration/forums/discussion/topics/475676-whats-not-to-like/messages/1535665#message

            or as I had posted in full:

            "Exploration drill holes IMCEX 23 (48M or .56% and 10M of 1.58%) and 52 (25 M of 1.44%) had some pretty decent results albeit a little deep. Note the location in proximity of these two holes

            See page 228 of Kian's 43-101 for the table showing the assays of the exploration drill holes."

            So you did not actually see the "table of assays" or anything of the sort as described in my post? Sorry for the lack of a link, but you should have noticed that the table on "page 226" staring you in the face is in fact a "table showing assays of the exploration drill holes". If that still had you confused, it is afterall in the 43-101 authored by Kian Jensen ISM's Geo at the time. Or as I call it "Kian's 43-101"

            To be very clear, here is how the table is labelled:

            Appendix P: Assay Composites for Exploration Diamond Drilling

            If you actually care for the details, it can be found in Appendix P and to lessen any possible future confusion, it's on the very last page of Kian's lengthy 43-101, which was released Oct 06/2009 to the ISM website and which actually displays as "update as of September 01/2009' It also has been dated September 25/2009 on the same first page

            As you already know, the holes I thought were interesting in our new KCC Allerston grid are exploration holes 23 and 52

            I have added the % and M. to the appropriate numbers as I think it will not paste well here compared to the original table

            Drill Hole From (m) To (m) Length (m) Weighted Average Ni (%)

            IMCEX-23 273.00 321.80 48.80M 0.560%

            IMCEX-52 346.00 371.42 25.42M 1.449%

            While we are on topic, here's the ISM map that goes with the table for that the time

            http://www.inspirationmining.com//files/116.pdf

            BTW, The first page I see reads like this:

            

            TECHNICAL REPORT OF THE

            LANGMUIR PROPERTY

            SHAW DOME AREA

            NTS 42N/06

            In

            LANGMUIR TOWNSHIP

            PORCUPINE MINING DIVISION

            DISTRICT OF COCHRANE

            ONTARIO, CANADA

            FOR

            INSPIRATION MINING CORPORATION

            

            An Update as of September 1, 2009

            Kian A. Jensen, B.Sc., P.Geo.

            Timmins, Ontario

            September 25, 2009

            whaler

            Reply in Inspiration Mining

            Exploration drill holes IMCEX 23 (48M or .56% and 10M of 1.58%) and 52 (25 M of 1.44%) had some pretty decent results albeit a little deep. Note the location in proximity of these two holes See page 228 of Kian's 43-101 for the table showing the assays of the exploration drill...

            1. Replying to @whaler

              Some of the table info from those 2 holes did not paste well at all, it is missing a part of IMCEX hole #23 that I had pasted in the related earlier post ( Again I have added the M and the %) to the numbers

              Drill Hole From (m) To (m) Length (m) Weighted Average Ni (%)

              IMCEX-23

              273.00 321.80 48.80M 0.560%

              311.10 321.80 10.70M 1.585%

          2. Surething you asked the following:

            "Also for our viewing audience, could you perhaps recall any questions I've asked recently that would warrant an e-mail to the company. As per your following statement:"

            "As such, I don't think it is my job as a hubleader (which has no job decription, contract or wages) on a stock forum to gather up the questions of Nickel77, Surething, Heatseeker, or yourself and seek out answers by calling the company and or contacting IR."

            Here is one recent post in which you had chosen to bring over a question for a poster on another board. Am I wrong in interpreting this as someone having a valid concern or question that you too may have or had? Especially since you made the extended effort to bring it over and possible have answers sought out or advice given here on this board? I know I could not answer this question on my own and without any clarifying information directly from the company, be it an email or a phone call. Is March 16th recent?

            Again maybe I am reading you wrong and I have mistaken/misinterpreted your need for answers to questions when I read this statement in another more recent April 3rd post. Are you not asking for answers to my questions of nearly a year ago from Ian Stewart ?

            http://agoracom.com/ir/Inspiration/forums/discussion/topics/477481-whaler/messages/1538348#message

            "Your first e-mail communication with Ian Stewart, was on the daunting topic of the website, here's a suggestion for your next e-mail : Maybe you could get the answers to your questions of nearly a year ago from Ian Stewart.

            Surely if you thought those questions were warranted on May19 2010, some of them seem to be just as warranted now. Don't ya think?"

            **************************************************************

            If there has been a lack of understanding on my part and you are not in fact asking any questions that would warrant an e-mail to the company, I must apologize for including you in the group I had named.

            Surething

            Inspiration Mining

            Can Anyone Help?

            whaler, Thought you and the gang might like to read and possibly advise/respond to this persons post from SH.: "This kind of statement in the news release today worries me about the value of information being released: 1) "It should be noted that all lengths are apparent thick...

  2. Thanks for the post Wildcatter. Great input and I would agree with your take on what an update would look like. I think you are also right about the ISM flanked LBE claim. It would seem that the two have to come to an agreement if LBE chose to do anything with the old mineshaft.

    I wish the photo library was up as there are pics there to support some of your points.