Skip to content
Sign in

Post

Inspiration Mining

VEEP3.3 rating from 31 members797 ptsRate

Low Grade Average and Recovery %

Whaler,

Investors are sick and tired of the excuses and the extended time frame it has taken ISM Management to address those many “unknowns” you speak about. Many of those “unknowns” should have been addressed in the last Micon Ni-43-101 Resource Report. Since Micon requested ISM to do the follow up exploration over 15 months ago, one would have to think that if ISM management truly believed they had a Company Maker Property in the making in L-2, surely they would have been working at a much faster pace to complete the full Micon Recommendations.

After 6 years and spending millions upon millions of exploration dollars on the L-2 and L-1, ISM should not “be at the early stage of unknowns”. In my opinion, it is time to clean house and bring in an experienced mining management group that will either move these projects forward, or use the remaining cash to explore on other properties to try and salvage ISM shareholder value that has taken such a terrible beating over the past few years.

By the looks of trading to date, once again, it seems the Market already knows what to expect from the upcoming Micon Ni 43-101 Resource Report. With the information this report will produce, it will clearly demonstrate just how committed ISM is in moving the Langmuir Properties forward.

“When you consider that Randy Miller is quoted as saying that only 15% of the Langmuir property has been explored/ and or drilled that leaves a lot of potential discovery other than old abandoned deep mines and shafts/ramps.

So what if only 15% of the Langmuir Property has been explored! One can basically put down a drill anywhere and find the low grade Ni numbers in the Shaw Dome that ISM has been releasing lately. In the end, it will have to be of a grade that can be recovered economically and that is why it is so important that ISM show the Recovery %‘s on the bulk of their Resource discovered to date from the L-2 in the next Ni 43-101. If ISM can’t even show that their already released "low grade average resource" and recovery % work financially, who cares about the even lower grades they are touting now. Everyone had expected to see the recovery % of the bulk of ISM’s low grade resource last time round. No doubt many shareholders have let ISM know they had better show them this time. Will the company listen and provide these numbers?

Why are they stalling in releasing the details that really matter?

Best

Nickel

Join the conversation about Inspiration Mining.

Reply

Replies

  1. I too await recovery numbers..........let's look at the track record and history on the project.

    N77.......Do you recall that the Micon announcement came out of ISM camp way back in May/2008?

    http://www.inspirationmining.com/news.html?id=81

    Kian J. released his report and many posters said it was a possible glimpse at what could be expected from Micon.

    http://www.inspirationmining.com/news.html?id=113

    There were some delays and there was also some extra drilling at the request of Micon.

    http://www.inspirationmining.com/news.html?id=117

    We did not see the end result until Jan 2010. It took nearly three years to produce that and the markets were let down by it.

    http://www.inspirationmining.com/news.html?id=125

    In a nutshell here's what we got after a lot of waiting.

    http://www.inspirationmining.com/news.html?id=121

    Does it seem like these guys (Micon and ISM) were quick with the task at hand? I would say no, does it see like they did a thorough job? I would say yes.

    Did it seem we recieved everything that was described in the original commissioning NR? I would say no. I do not know if they are working on phase 2 or not. Having said that, I would think so as it makes a lot of sense to discover if something is worth chasing before spending time and precious money chasing it. Afterall what are the next logical steps in this business?

    You do bring up an interesting point.

    "So what if only 15% of the Langmuir Property has been explored! One can basically put down a drill anywhere and find the low grade Ni numbers in the Shaw Dome that ISM has been releasing lately. In the end, it will have to be of a grade that can be recovered economically and that is why it is so important that ISM show the Recovery %‘s on the bulk of their Resource discovered to date from the L-2 in the next Ni 43-101. If ISM can’t even show that their already released "low grade average resource" and recovery % work financially, who cares about the even lower grades they are touting now. Everyone had expected to see the recovery % of the bulk of ISM’s low grade resource last time round. No doubt many shareholders have let ISM know they had better show them this time. Will the company listen and provide these numbers? "

    One would think that ISM management along with Andre (the new Geo for Langmuir) working along with previous and possibly present guidance and direction from Micon, would realize and have that same conclusion. This is afterall their field of expertise.

    What if the 15% of Langmuir has or does prove out as economic grades and viable to mine by open pit means?

    Why are they now touting the "high tonnage lower % Ni" theme for Langmuir? The open pit amenable prospects and the possibility of now 4 ore zones? At his stage of the Langmuir game are they simply rolling the dice? Taking a flyer on the whole show?

    As if the old figures weren't enough

    "Pursuant to the Micon Report, resources in the Indicated Resources category for the Langmuir North deposit are 8,324,000 tonnes grading 0.40% nickel, as detailed in Table 1. Resources in the Indicated Resources category for the Langmuir No. 1 deposit are 1,733,000 tonnes grading 0.51% nickel"

    At the time of writing for the Miocn report, it would appear that Micon has gone on record saying they did not have the details you were expecting they would have and or ISM would have . Micon said it in the report.

    As quoted:

    "Given the early stage of the project’s development, no detailed information is available in respect of operating costs for mining, processing and general and administration in respect of a potential open pit mining operation. As well, no geotechnical information is available upon which to estimate an overall slope angle. Consequently, Micon derived estimates for these items on the basis of its experience in the region and from general knowledge. It is to be noted that the estimates presented are only for the purpose of developing an initial optimized open pit shell, and the assumed values will likely change with further detailed work."

    I agree with you that we need the numbers eventually. It would be logical that ISM feels the same way and will proceed accordingly. They seem to be proceeding as evidenced by recent exploratory drilling in the KCC Allerston area in the NW. The talk of the project having a high tonnage low Ni% prospect.

    In light of that possiblity, I have been interested in reading about any projects having similar or even lower grades. I wonder how are they viable and what are they doing that makes them so? I found the readings re: Turnagain (Hardcreek Nickel) interesting. The nature of near surface easily accessible economic mineralization has to be a plus here. Whether it is economic to mine is the unknown by me.

    We talked about LBE projects, we talked about Ursa's projects we talked about Turnagain. It would see that there is technology to deal with and handle lower grades especially in Sulphides as opposed tot Laterites.

    Lastly, you talk of the market having already decided and judged ISM. I was curious to watch National Bank pick up a decent amount of shares in the market over the last three months.

    http://agoracom.com/ir/Inspiration/forums/discussion/topics/477047-institutional-ownership-up-in-these-last-three-months/messages/1538166#message

    

    Note the 3 month net change.......(was that all that National buying we have been seeing?)

    Institutional Holders

    % Shares Owned: 7.07%
    # of Holders: 3
    Total Shares Held: 4,975,000
    3 Mo. Net Change: 3,794,742
    # New Positions: 0
    # Closed Positions: 0
    # Increased Positions: 1
    # Reduced Positions: 0
    # Net Buyers: 1

    http://www.reuters.com/finance/stocks/financialHighlights?symbol=ISM.TO

    Well it looks like National may be the house behind the institutional buying we have seen in the last three months (+3,014,700 shares net). Not sure if what is bought and sold on the Alpha Trading System shows up here either?

    FEBRUARY:

    MARCH:

    JANUARY:

    whaler

    Reply in Inspiration Mining

    Note the 3 month net change.......(was that all that National buying we have been seeing?) Institutional Holders % Shares Owned: 7.07% # of Holders: 3 Total Shares Held: 4,975,000 3 Mo. Net Change: 3,794,742 # New Positions: 0 # Closed Positions: 0 # Increased Positions: 1 # R...

    1. Paraphrasing from the LBE news release for their 2010 Financials, in that year they mined and processed 105,688 tonnes of 0.32% nickel from their McWatters Open Pit.

      If my memory is correct, Micon included 8,000,000 tonnes of 0.4% nickel in the Indicated classification for L2N.

      1. Wildcatter this should help your memory.........

        "Pursuant to the Micon Report, resources in the Indicated Resources category for the Langmuir North deposit are 8,324,000 tonnes grading 0.40% nickel, as detailed in Table 1. Resources in the Indicated Resources category for the Langmuir No. 1 deposit are 1,733,000 tonnes grading 0.51% nickel"

  2. Well let's re-read what Micon had to say to ISM after they wrote their report. I wonder how many of these suggestions they have pursued and which has the "best bang for it's buck" N77 make note of the last 2 on the list. Also can I presume that some suggestions indicate there may have been deficiencies prior?

    **********************************************************************

    In respect of the exploration potential of the property, Micon suggests the following:

    Prepare a detailed compilation of the surface and three-dimensional geology and mineralized zones from all available sources to assist in identification of exploration targets in the favourable peridotite units. Such a compilation ideally would be completed using all available drill hole data.

    Deep-searching, surface-based EM surveys be carried out along those magnetic anomalies that are observed or interpreted to be related to ultramafic host rocks. Such surveys would be designed to search for higher grade sulphide mineralization at depth. Anomalies identified should be tested by surface-based diamond drill holes.

    Continue exploration drilling to search for possible concentrations of higher grade nickel mineralization beneath the known deposits (Langmuir #1, Langmuir #2 and Langmuir North. Micon envisions that such drilling be carried out initially at a wide spacing. Down-hole geophysical surveys (bore hole pulse EM) surveys would be carried out in these deeper drill holes to search for the possible presence of conductive sulphide mineralization in the vicinity of these bore holes.

    Examine the environs of the Langmuir #2 deposit by means of shallow drill holes for the possibility of low-grade, near surface mineralization that may be exploited by open pit mining methods.

    In respect of the project development aspects of the project, Micon suggests that:

    Given the suggested relationship of the bulk density to the nickel grades at the Langmuir No. 1 deposit, Micon recommends that future mineral resource estimates be prepared using the detailed bulk density information so that accurate local estimates of the mineralized tonnages can be derived.

    The metallurgical test work on the Langmuir North be completed and metallurgical testing be initiated for the Langmuir #1 deposit

    All future met test work should be carried out on a sulphide nickel (Ni(AR)) basis so as to maintain consistency across the project.

    The inter-element relationships show that a positive relationship is present between nickel, palladium and platinum where higher palladium and platinum values are correlated with higher nickel values, suggesting the presence of a Ni-Pd-Pt-bearing mineral such as braggite (Pt, Pd, Ni)S in the mineralization found at the Langmuir North deposit. Micon therefore recommends that the palladium and platinum grades in concentrate be determined in any future metallurgical testing programs.

    Modify the geological drill hole database to explicitly state the assay method used for the nickel assays for clarity.

    Preliminary geotechnical investigations be completed to suggest maximum rock and soil slope angles in support of future open pit modeling exercises.

    Preparation of a preliminary assessment be completed to study the economic viability of the mineralization discovered to-date.