Jan 2017 Corp Presentation
Latest presentation, link below
Some key items
- PEA, Q1 2017 with resource over 1Moz (compared to 0.25Moz used in the 2015 PEA)
- Updated RE, Triangle and Sigma, Q1 2017
- Ramp has advanced roughly half way (500m). Bulk sample in Q3 2017. The ramp is a production- size ramp, they can haul the top parts of C1 and C2 (perhaps C3 and #4 Plug) up the ramp to initiate the production at Triangle, at the rate of 1500 tpd according to de Jong.
http://www.integragold.com/i/pdf/Presentation-Jan-2016.pdf
GH
Join the conversation about Integra Gold Corp.
Reply