Skip to content
Sign in

Post

The Canadian Chrome Company Inc.

VEEP3.0 rating from 58 members960 ptsRate

PDAC- KWG Booth

Was at PDAC yesterday and was able to speak to a few people, here is the summary (active booth to say the least) from KWG from yesterday:

- last release is good, the lower the temp to 'breakdown' the ferro, the better and lower electrical cost, more profit
-1600-ish temp is good, some go to 2600 to melt
- meeting with Cliffs this afternoon(Tuesday) to talk about April 1st switch, KWG will be asking for an extension
- do not know how the meeting went
- 2 'contractors' looking to sell their services to kwg/rof production/construction
- both meraw & hodgeman (I think that is his name) are there selling
the mine will be coming
- kwg has already sat with FN's
- the results from all companies thus far are only the tip of the iceberg

Unfortunately, it was very busy and could not ask about RR or Cdn Chrome

I walked away very happy about my investment in KWG

Very positive
Trace

Sign in to ask the company to answer this.

Join the conversation about The Canadian Chrome Company Inc.

Reply

Replies

  1. I was also at the PDAC yesterday, and was told that talk by CLF or anyone else of building a road is just hogwash, the railway is the only possible way to handle the anticipated volume of freight. The route they have staked is the only feasible one. Planning/design is at quite an advanced stage already, and they hope to be able finance this very large capital cost by issuing bonds - talks with relevant Govt and regulatory bodies are proceeding well.

    They intend to split Debut Diamonds, things are proceeding on that front as well, now that the current market conditions for diamond companies have improved and becoming more active. There would have been no point in doing this when appetites for diamond ventures were low.

    Finally, 'Watch closely for developments'

    1. .

      Bananaboy is correct about a so called road as stated by Cliffs, as he puts it "HOGWASH".

      There was two routes that was staked and only one is really more viable and that is the one that follows the Eskars and I believe that this will be in Krech Ojard Railroad Report.

      The Blockcade that E. Moonias put in place has been removed by them this week.

      The First Nation Chiefs have been in talks with the Governement and the companies on a reguliar basis. but it seems that not all Chiefs are beating the same drum.

      Other.

      I also visited the Cliffs booth but came away very unhappy with the answers I got. The first gentleman I talked with had no knowledge of the Ring of Fire and recommended that I talk with his colleague who new all about it, she was busy but I waited about 20 minutes just to find out that she was not the one to talk to, go figure.

      The three days at the PDAC was enjoyable and I met a lot of new friends, Bananaboy, Irish1111, Hoov, Donnypee and other buddies I have not seen in a long time.

      Have a Great Nite

      ..........RL

      .

  2. I read this comment about KWG asking for an extension, last week. At the time, it didn't sink in, but I was lying in bed last night and suddenly something clicked. If, as we have assumed, there is a bit of tension between KWG and Cliffs (thanks to the events of last spring/summer), then why would they bother asking for this? There is no reasonable expectation that Cliffs would grant this request, on the surface.

    Therefore, one must assume one of the following:

    1. This was reported incorrectly; or

    2. This was reported correctly. KWG was asking for an extension.

    If the latter, then we have to assume that there is some logic behind the request, and that KWG isn't taking this step when expecting it to be a waste of time. If THAT is the case, then one must assume one of the following:

    1. KWG and Cliffs are actually getting along much better than some had assumed, and Frank feels that Cliffs would reasonably consider the request; or

    2. KWG has some sort of information or bargaining position or other strength that we don't know about, which would make Cliffs want or need or be forced to consider acquiescing to the request.

    Number one is possible. After all, Cliffs has held their 19.9% position for some time with no apparent change. We can assume that Cliffs would benefit by having a Canadian corporate presence within the ring, on a number of fronts. Maybe the two companies are now cooperating to the point where KWG has become a friendly entity to Cliffs. There are any number of reasons why this situation might be true but not have been publicly acknowledged by either company. In fact, if true, this could have been the case since last summer, and maybe the adversarial relationship on the surface has been a red herring for some time now.

    If number two, what could be the hidden position of strength? Support from Xstrata? Political pressure? Infrastructure as a bargaining chip? Or any number of other things.

    I would only put the odds of the first option being correct at less than 25%, but I suppose the possibility exists. But this whole situation has me curious now that I've started thinking about it. Trace, do you have any more detailed info that you can share about this?

    1. That extension comment jumped right out at me and at the time made me think that KWG was buckling to Clf pressures and the drilling release was not coming before April after Clfs got control. RJ had also mentioned KWG IR had aluded to a few issues (thanks RJ). The sp erosion that followed did not help, maybe others were thinking the same or maybe its a head fake to draw out weaker shares. Who knows.

      So Marlboro Dog, I agree, they could be simply buckling, but they could also have something large to bargain with. After all we do know the drilling was completed on or very near schedule and lab work would be nearly or done by now. Anyway they have enough info now or will have in the next two weeks to to produce the NR we need to have before the April 1 transition of control. Clfs would know about it, maybe they want to negotiate and that needs time to happen. And if KWG mgmt holds true to their form, they would want/require/demand an agreed legal extension of the transition date to protect our position.

      Imo, KWG can and needs to release results by the end of March, unless of course they are granted a legally binding extension by all the partners. Either way we see a NR by the end of March. Hope we are not kept hanging until the last day, that would just be cruel.

    2. Hi..sorry for the delay, been busy with work and life (2 year old and 7 month old).

      Unfortunately, I do not have any more insight and/or details besides that fact KWG was asking for an extension to finish off some holes....sorry

      You are right, it is very interesting that they would ask for an extension.......there must be a reason why they would.

      I am loving the RoF story for 2011

      GLTA

      Trace

  3. "...meeting with Cliffs this afternoon(Tuesday) to talk about April 1st switch, KWG will be asking for an extension..."

    An extension for what? More control time or more time to spend? Earn-in expenses not to be reached before April 1st? More work to be done to comply with the JV Contract? Or does KWG want to keep control for a few weeks more in order to drill further? Why would KWG ask for an extension...?

    GLTA.

    BaBe.