Skip to content
Sign in

Post

The Canadian Chrome Company Inc.

VEEP3.2 rating from 298 members9.9K ptsRate

Bulk sample from BD

KWG Commences Drilling on Big Daddy

MONTREAL, QUEBEC--(Marketwire - Oct. 27, 2011) - KWG Resources Inc. (TSX VENTURE:KWG) is pleased to report that a 12,000 metre core drilling program is underway on its Big Daddy Chromite deposit in the Ring of Fire, James Bay Lowlands. KWG has earned 28% interest in these mineral claims and will increase this to 30% by funding 50% of this $5 million program. The goal of this program is to collect a chromitite sample of sufficient size for pyro-metallurgical testing and to complete resource definition drilling on that portion of the deposit that is amenable to open pit mining. Cliffs Natural Resources is the project operator, and it is anticipated that the metallurgical testing and drilling will be completed during the first quarter of 2012.

Sign in to ask the company to answer this.

Join the conversation about The Canadian Chrome Company Inc.

Reply

Replies

  1. KWG Provides Update on Big Daddy Drill Program

    And the latest update...

    MONTREAL, QUEBEC--(Marketwire - Jan. 24, 2012) - KWG Resources Inc. (TSX VENTURE:KWG) is pleased to provide an update with regards to the current field program on the Big Daddy Chromite deposit.

    Metallurgical Drilling - The metallurgical drilling program was to consist of 1,900m of HQ drilling. The program commenced on October 6, 2011 with one drill rig, with a second rig added on October 11, 2011. The total completed meterage was 1,909m in nine (9) boreholes and was concluded on October 22. A bulk sample consisting of massive chomitite with a mass of 4,600kg was removed from core boxes and packaged for transport to Xstrata Process Support (XPS) in Falconbridge, Ontario. The furnace runs are scheduled for February.

    Resource Delineation Drilling - The resource delineation program was to consist of 12,000m of NQ drilling in 38 boreholes. Drilling started immediately following the completion of the metallurgical sampling holes as the rigs became available and was carried out continuously with two rigs until winter shut down on December 15. In that time 23 of the 38 holes were completed for an aggregate total of 7,754m. Completion of the drilling is anticipated in the third week of February.

  2. Cappy,

    This looks like the so-called "second bulk sampling" that CLF is doing herself to re-confirm the results announced by KWG on 11 June 2011... and to outline the open pit for getting the best stuff from BD. Sounds serious enough?

    goldhunter